The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Alliant Techsystems Operations Llc

  • Contact Person: Kelly Lotter
  • Contact Phone: 410-392-1091
  • Contact Email: KELLY.LOTTER@ORBITALATK.COM
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Limited Liability f
  • Industries Served: Aircraft Manufacturing, Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing
  • Product Areas: MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS, MISCL AIRCRAFT ACCESSORIES COMPS, NIGHT VISION EQUIPMENT, EMITTED AND REFLECTED RADIATION, NIGHT VISION EQ, SWITCHES, MICROCIRCUITS, ELECTRONIC, AMPLIFIERS, SHIPBOARD ALARM AND SIGNAL SYSTEMS, SHIPBOARD ALARM AND SIGNALS SYSTEMS, MISC ALARM, SIGNAL, SEC SYSTEMS, MISCELLANEOUS ALARM, SIGNAL, AND SECURITY DETECTION SYSTEMS, COMBINATION AND MISCELLANEOUS INSTRUMENTS, COMBINATION & MISC INSTRUMENTS

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $89,737 - Tuesday the 26th of June 2012
    Department Of Air Force
    FA8650 USAF AFMC AFRL/RQK
    FUNDING - CIRCULAR COMBUSTOR/HEX DESIGN VALIDATION
  • $7,653 - Wednesday the 16th of May 2012
    Department Of Air Force
    FA9101 AEDC PKP PROCRMNT BR
    RESEARCH
  • $57,000 - Thursday the 23rd of August 2012
    Department Of Air Force
    FA8650 USAF AFMC AFRL/RQK
    INCREMENTAL FUNDING
  • $5,000,000 - Tuesday the 31st of January 2012
    Department Of Army
    W6EC PEO STRI ORLANDO
    AFSS ECP PHASE 3 DEV OF AFSA PROTOTYPES
  • $50,000 - Wednesday the 13th of June 2012
    Department Of Air Force
    FA8650 USAF AFMC AFRL/RQK
    ADD WORK - CIRCULAR COMBUSTOR/HEX DESIGN VALIDATION
  • $404,045 - Wednesday the 22nd of February 2012
    Department Of Air Force
    FA8650 USAF AFMC AFRL/RQK
    INCREMENTAL FUNDING - 6X SCALE DUAL-MODE SCRAMJET TEST RIG
  • $36,448 - Monday the 11th of May 2015
    National Aeronautics And Space Administration
    LANGLEY RESEARCH CENTER
    ATK SHALL DESIGN, DEVELOP, FABRICATE AND/OR PROCURE THE HIFIRE PAYLOAD AND ITS ASSOCIATED COMPONENTS. THE PAYLOAD SHALL FIT WITHIN A SHROUD AND INTEGRATE WITH THE PAYLOAD SUPPORT MODULE, FUEL SYSTEM, AND COMPONENT MOUNTING INTERFACES AS SPECIFIED IN THIS TASK ORDER. THE GOVERNMENT WILL PROVIDE INFORMATION ON THESE SYSTEMS UPON AWARD OF THE TASK ORDER OR ON THE DATE SPECIFIED. ATK SHALL PROVIDE ALL DRAWINGS AND CHECKLISTS TO SAFELY OPERATE THE PAYLOAD SYSTEMS, DELIVERED UNDER THIS EFFORT, DURING THE FLIGHT TEST. ATK SHALL IDENTIFY ALL POTENTIAL SAFETY ISSUES THAT COULD ARISE DURING TEST, INTEGRATION, INSTALLATION, AND USAGE. THESE POTENTIAL SAFETY ISSUES SHALL INCLUDE SUGGESTED INSTRUMENTATION FOR CRITICAL SYSTEM MONITORING DURING THE FLIGHT TEST. ATK SHALL PROVIDE SCHEDULE ESTIMATES, INCLUDING MAJOR MILESTONES AND PROVISIONS FOR A CRITICAL DESIGN REVIEW. ATK SHALL PARTICIPATE IN A WEEKLY INTEGRATED PRODUCT TEAM (IPT) MEETING CONCERNING THE DESIGN, FABRICATION, HARDWARE, TRAVEL, CALIBRATION, VERIFICATION AND ASSEMBLY FOR EACH DELIVERABLE ITEM LISTED IN SECTION 5 AND ELSEWHERE IN THIS TO
  • $300,000 - Thursday the 2nd of August 2012
    National Aeronautics And Space Administration
    GLENN RESEARCH CENTER
    PROPELLANT TESTING FOR MARS ASCENT VEHICLE THE TASKS INVOLVED IN THIS EFFORT INCLUDE: 1. THE CONTRACTOR SHALL PERFORM PROPELLANT DEVELOPMENT AND CHARACTERIZATION TESTING TO DEMONSTRATE THE FEASIBILITY OF THE PROPOSED PROPELLANT FORMULATION TO MEET THE MAV REQUIREMENTS.
  • $30,000 - Thursday the 2nd of February 2012
    Department Of Air Force
    FA8650 USAF AFMC AFRL/RQK
    EXTENDING OPERABILITY OF HYDROCARBON FUELED SCRAMJETS TO MACH 8
  • $26,502,977 - Wednesday the 26th of September 2012
    Department Of Army
    W4MM USA JOINT MUNITIONS CMD
    AWARD OF QUANTITY FOR ORDERING PERIOD 1

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.