The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

American Mechanical Inc

  • American Mechanical Inc

  • View government funding actions
  • Fairbanks, AK 997095456
  • Phone: 907-479-5754
  • Estimated Number of Employees: 15
  • Estimated Annual Receipts: $18,549,532
  • Business Start Date: 1982
  • Contact Person: Dennis Ii Michel
  • Contact Phone: 907-479-5754
  • Contact Email: denny@american-ak.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • Minority Owned Business
  • For Profit Organization
  • Native American Owned
  • American Indian Owned
  • Industries Served: Industrial Building Construction, Commercial and Institutional Building Construction, Water and Sewer Line and Related Structures Construction, Oil and Gas Pipeline and Related Structures Construction, Land Subdivision, Other Heavy and Civil Engineering Construction, Poured Concrete Foundation and Structure Contractors, Structural Steel and Precast Concrete Contractors, Framing Contractors, Roofing Contractors, Siding Contractors, Other Foundation, Structure, and Building Exterior Contractors, Plumbing, Heating, and Air-Conditioning Contractors, Drywall and Insulation Contractors, Painting and Wall Covering Contractors, Flooring Contractors, Construction
  • Product Areas: PASSENGER MOTOR VEHICLES, TRANSPORTATION/TRAVEL/RELOCATION- TRAVEL/LODGING/RECRUITMENT: MOTOR PASSENGER, MOTOR PASSENGER SERVICES, TRANSPORTATION/TRAVEL/RELOCATION- TRAVEL/LODGING/RECRUITMENT: PASSENGER MOTOR CHARTER, PASSENGER MOTOR CHARTER SERVICE

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $9,759 - Wednesday the 25th of January 2012
    Department Of Army
    W2SN ENDIST ALASKA
    CONSTRUCT SITE WORK - CASE 9, ADDITIONAL DEFICIENCIES, PART 3. PROVIDED DESIGN, ENGINEERING AND CONSTRUCTION TO CORRECT ITEMS 24, 26 THROUGH 34, 36, 42 THROUGH 44, AND 46 ON THE ATTACHED "FTW363 FAMILY HOUSING RECONSTRUCTION ADDITIONAL DEFICIENCIES" LIST, DATED JANUARY 10, 2012.
  • $9,668 - Tuesday the 8th of November 2011
    Department Of Army
    W2SN ENDIST ALASKA
    CONSTRUCT SITE WORK. CASE 6, ADDITIONAL DEFICIENCIES, PART 2. PROVIDED DESIGN, ENGINEERING AND CONSTRUCTION TO CORRECT ITEMS 10 THROUGH 20 ON ATTACHED "FTW LIST, DATED 9/15/11. DISPOSE OF DEBRIS AND ABANDONED CONSTRUCTION MATERIAL ON SOUTHWEST CORNER OF SITE (COORDINATE WITH ON SITE COE QAR FOR LOCATION AND EXTENT OF DISPOSAL).
  • $9,286 - Thursday the 10th of May 2012
    Department Of Army
    W2SN ENDIST ALASKA
    CONSTRUCT ORGANIZATIONAL STORAGE - CASE 9, LOCKSET REVISION TO STORAGE ENTRY DOORS. INSTALL DEAD BOLT LOCK SET F-13 IN LIEU OF F07 FOR 15 PERSONNEL ENTRY DOORS TO STORAGE AREAS. ALL LOCKSETS PREVIOUSLY PURCHASED UNDER THIS CONTRACT WILL BE TURNED OVER TO THE GOVERNMENT IN ACCORDANCE WITH DIRECTIONS RECEIVED FROM THE USACE QUALITY CONTROL REPRESENTATIVE.
  • $917 - Friday the 28th of October 2011
    Department Of Army
    W2SN ENDIST ALASKA
    CONSTRUCT ORGANIZATIONAL STORAGE - CASE 7, CONDENSATE RETURN PUMP REVISION. CHANGE THE DATA DESCRIPTION FOR CONDENSATE RETURN PUMP (ITEM CRP) ON SHEET M-601 TO READ: 6.0 GPM @ 30 PSIG....NON-SIMULANTEOUS 1/2 HP, 230V / 1 PHASE / 60HZ 3500 RPM.... SHALL BE PROVIDED. DOMESTIC / HOFFMAN PUMP SERIES CC MODEL 63CC, OR EQUAL.
  • $9,000 - Wednesday the 21st of March 2012
    Department Of Army
    W2SN ENDIST ALASKA
    CONSTRUCT FIRE STATION-P00014, CI 14-1 FR BEAM DETAILS/ADD'L GYP/RVSD FLRNG SCH
  • $89,281 - Wednesday the 5th of October 2011
    Department Of Army
    W2SN ENDIST ALASKA
    CONSTRUCT FIRE STATION P00006 CI 00006-2 ACM DSC IN CMP&DRECT BRY SOUTH OF MH124
  • $85,182 - Thursday the 21st of June 2012
    Department Of Army
    W2SN ENDIST ALASKA
    CONSTRUCT SITE WORK - CASE 12, BIKE PATH&CHAIN LINK FENCE. ITEM 1 - RECONSTRUCT THE BICYCLE PATH ON THE NORTH SIDE OF THE PROJECT FOR POINT A TO POINT B, AS SHOWN ON SKETCH 1, DATED JANUARY 26, 2012. PROVIDE MINIMUM 6 FT WIDTH ASPHALT PAVING AND SUBGRADE PER PARAGRAPH 3.6.4.2. THE WIDTH OF THE BICYCLE PATH FROM POINT B TO POINT C (SEE ATTACHED SKETCH 1) SHALL BE INCREASED FROM A MINIMUM OF 5 FEET TO A MINIMUM OF 6 FEET. PROVIDE A TRANSITION AT THE TERMINUS OF THE BIKE PATH AT CEDAR ROAD WHERE THE BIKE PATH CROSSES THE SIDE WALK. REMOVE THE SOUTHERN LOOP IN THE PATH NEAR THE GAS STATION, INCLUDING THE GRAVEL BASE. RE-GRADE AND SEED WITH TYPE B SEED MIX TO MATCH AS SHOWN FOR THE AREA ON THE AMERICAN MECHANICAL LANDSCAPE PLAN (L-102). REINSTALL THE SIGNAGE REMOVED FROM THE ABANDONED TERMINUS AT WHITE STREET AT THE NEW TERMINUS AT CEDAR ROAD. PROVIDE BICYCLE STOP SIGNS AT HACKBERRY STREET BIKE PATH CROSSING. ITEM 2 - DELETE REQUIREMENT TO REMOVE AND SALVAGE CHAIN LINK FENCE. ADD TEMPORARY FENCING AND ROLLING GATES. SEE REVISED SPECIFICATION SECTION 01 10 00, PARAGRAPH 2.1.13, FENCING, (CONFORMED COPY ATTACHED) AND SPECIFICATION SECTION 01 19 30.01 29, PARAGRAPH 1.21, RESTORATION OF STOARGE AREA, (CONFORMED COPY ATTACHED).
  • $8,071 - Thursday the 24th of May 2012
    Department Of Army
    W2SN ENDIST ALASKA
    CONSTRUCT FIRE STATION, CHANGE ITEM NO. 25 APP BAY PAN DECK INSULATION/RMVABLE CSWRK
  • $7,500 - Tuesday the 26th of June 2012
    Department Of Army
    W2SN ENDIST ALASKA
    CONSTRUCT SITE WORK - CASE 19-1, REPAIRS-ARCHECTURAL, PART 1, NTP. THIS IS A PART 1 OF A TWO PART MODIFICATION. THE AMOUNT OF $7,500.00 IS MADE AVAILABLE AS AN INTERIM PAYMENT UNDER THIS MODIFICATION TO MITIGATE ECONOMIC HARDSHIP. THIS AMOUNT IS TENTATIVE AND THE FINAL ADJUSTMENT OF PRICE AND TIME WILL BE MADE IN THE FINAL PART OF THIS MODIFICATION. YOU ARE HEREBY DIRECTED TO PROCEED WITH THE WORK AS DEFINED BY THIS MODIFICATION. SCOPE OF WORK: PROVIDE DESIGN, ENGINEERING AND CONSTRUCTION TO CORRECT ITEMS DESIGNATED AS CASE 19 ON THE ATTACHED "FTW 363 FAMILY HOUSING RECONSTRUCTION ADDITIONAL DEFICIENCIES" LIST, DATED 6/14/12.
  • $7,497 - Tuesday the 14th of February 2012
    Department Of Army
    W2SN ENDIST ALASKA
    CONSTRUCT FIRE STATION P00010 CI 00009 ADDITIONAL WIRE MESH - APP BAY SLAB

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.