The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Amstar Inc

  • Amstar Inc

  • View government funding actions
  • Louisville, KY 402234773
  • Phone: 502-561-7860
  • Estimated Number of Employees: 20
  • Estimated Annual Receipts: $5,177,121
  • Business Start Date: 1991
  • Contact Person: Wendy Ottman
  • Contact Phone: 502-561-7860
  • Contact Email: wendyottman@amstarinc.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Woman Owned Small Business
  • Woman Owned Business
  • Industries Served: Industrial Building Construction, Commercial and Institutional Building Construction, Framing Contractors, Drywall and Insulation Contractors, Finish Carpentry Contractors
  • Product Areas: PREFABRICATED AND PORTABLE BUILDINGS, PREFABRICATED & PORTABLE BUILDINGS

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $78,084 - Wednesday the 11th of July 2012
    United States Mint
    HEADQUARTERS
    OFFICE OF SECURITY / PROTECTION (SEARCH HOUSE AT UNITED STATES BULLION DEPOSITORY; FORT KNOX) -------------------- COTR / COR / SITE MANAGER: LOU HOAGLAND (502) 799-1536, LOU.HOAGLAND@USMINT.TREAS.GOV CO / PROCUREMENT POC: GARNEL PALIN (202) 354-7780, GARNEL.PALIN@USMINT.TREAS.GOV VENDOR POC: GARY J. OTTMAN (502) 561-7860, GARYO@AMSTARINC.COM -------------------- THE PURPOSE OF THIS BILATERAL MODIFICATION (#003) IS TO UPDATE SECTION B.1 OF THE CONTRACT, CLIN # 0005 AND ALL RELATED SUB-CLINS, AS REQUIRED BY SECTION B.2 OF THIS FIRM-FIXED-PRICE CONTRACT, AND TO INCORPORATE NEGOTIATED CHANGES TO SECTION B.1 OF THE CONTRACT, CLIN # 0005 AND ALL RELATED SUB-CLINS. AS A RESULT OF THIS THE CONTRACT CLIN #0005 IS INCREASED BY $78,083.75, FROM $932,819.00 TO $1,010,902.75, AND THE TOTAL VALUE OF CONTRACT IS INCREASED BY $78,083.75, FROM $1,002,970.50 TO $1,081,054.25. THIS MODIFICATION IS ALSO ISSUED FOR THE FOLLOWING: * TO EXTEND / CHANGE THE PERIOD OF PERFORMANCE OF THE CONTRACT FROM (09/30/2011 - 09/29/2012) TO (09/30/2011 - 09/30/2013). * TO EXERCISE THE OPTIONAL ITEM, CLIN #0005, AND ISSUE A FORMAL NOTICE TO PROCEED FOR CLIN #0005. * TO AUTHORIZE AMSTAR TO INVOICE FOR EACH CONTRACT CLIN #0005, SUB-CLIN. AMSTAR CAN INVOICE FOR 90% OF EACH INDIVIDUAL SUB-CLIN'S PRICE (VALUE) UPON COMPLETION / DELIVERY OF THAT INDIVIDUAL CLIN #0005, SUB-CLIN, AND AMSTAR CAN INVOICE FOR THE FINAL 10% OF EACH INDIVIDUAL CLIN #0005, SUB-CLIN'S PRICE (VALUE) ONCE THE ENTIRE CLIN #0005 IS COMPLETED / DELIVERED. * TO CHANGE SECTIONS; F.1, F.2, F.4, F.5, I.3, AND I.4. * TO ADD CLAUSE G-039. ATTACHMENT 14, IS HEREBY INCORPORATED. AMSTAR IS NOT AUTHORIZED TO BEGIN CONSTRUCTION UNTIL AFTER THE FOLLOWING OCCURS: * THE CO RECEIVES AND ACCEPTS AMSTAR'S INSURANCE CERTIFICATE, BOND CERTIFICATE(S), AND FULL CLIN #0005 AND CLIN #0006 PROJECTED SCHEDULE / TIMELINE (BASED ON A 08/01/2012 CONSTRUCTION START DATE). * THE CO LEAD PRE-CONSTRUCTION KICKOFF MEETING WITH AMSTAR MUST BE COMPLETED. * AMSTAR MUST CONFIRM IN WRITING THAT THERE IN A RECORD SET OF DRAWINGS ON SITE.
  • $2,976 - Friday the 10th of July 2015
    United States Mint
    HEADQUARTERS
    OFFICE OF SECURITY / PROTECTION (SEARCH HOUSE AT UNITED STATES BULLION DEPOSITORY; FORT KNOX) -------------------- COTR: LOU HOAGLAND (502) 799-1536, LOU.HOAGLAND@USMINT.TREAS.GOV PROCUREMENT POC: GARNEL PALIN (202) 354-7780, GARNEL.PALIN@USMINT.TREAS.GOV VENDOR POC: GARY J. OTTMAN (502) 561-7860, GARYO@AMSTARINC.COM -------------------- THE 100% DRAWING (CLIN #0004) HAVE BEEN ACCEPTED AND RECEIVED. THE PURPOSE OF THIS BILATERAL MODIFICATION (002) IS TO ISSUE THIS FIRM FIXED PRICE CHANGE ORDER IN THE AMOUNT OF $2,975.50 FOR CONTRACT CLIN #0004; DESIGN PHASE (ARCHITECTURAL / CAD DRAWINGS). AS A RESULT CONTRACT CLIN #0004 IS INCREASED BY $2,975.50, FROM $37,000.00 TO $39,975.50, AND THE TOTAL VALUE OF CONTRACT IS INCREASED BY 2,975.50, FROM $999,995.00 TO $1,002,970.50. THE FOLLOWING TERMS AND CONDITIONS ARE HEREBY INCORPORATED: THE UNITED STATES MINT REQUIRES THE REMOVAL OF THE TURRETS AND REDESIGNING OF THE UNITED STATES BULLION DEPOSITORY SEARCH HOUSE FORT KNOX BUILDING AS A FOUR SIDED STRUCTURE FOR THE FINAL 100% DRAWINGS. IN ADDITION A NEW SET OF FINAL DRAWINGS SHALL BE CREATED. THE FOLLOWING DRAWING SHEETS NEED TO BE CHANGED TO REFLECT THIS: * COVER PAGE>>UNDER THE ARCHITECTURAL OUTLINE SPECIFICATION UNDER DIVISION 8 REMOVE NOTE ON BALLISTIC SLIDING GUN PORT. * C1.0 SITE PLAN>>REMOVE CIRCULAR DEPICTIONS MARKED AS NEW BUILDING F.F.E. 7605 AND ILLUSTRATE A FOUR SIDED STRUCTURE. ALSO ON THIS SAME PAGE THE FENCE MARKED EXISTING BETWEEN THE NEW MAN GATE AND THE NEW FENCE SHOULD BE LABELED AS NEW FENCE. * S1.1 FOOTING SECTIONS AND NOTES>>FOUNDATION PLAN REMOVE THE CIRCULAR FOOTINGS MARKED AS TURRETS. MODIFY ANY AND ALL GENERAL NOTES REQUIRED FOR THIS CHANGE. * A1.0 BASEMENT FLOOR PLAN>>REMOVE TYPICAL ENLARGED TURRET PLAN. REMOVE FROM BASEMENT FLOOR PLAN THE FOUR CIRCULAR DEPICTIONS LABELED TURRET A,B,C&D, THE SHIPS LADDER, DOORS, AND ANYTHING RELATED TO TURRETS ON THIS ILLUSTRATION AND DEPICT A FOUR SIDED STRUCTURE. * A1.1 FIRST FLOOR PLAN>>REMOVE SHOOTING PORT JAMB DETAIL. REMOVE FROM FIRST FLOOR PLAN THE TURRETS MARKED A,B,C&D AND DEPICT A FOUR SIDED STRUCTURE. THIS CAN BE DEPICTED AS A DRAWING NOTE. NOTHING ELSE NEEDS TO BE ADDRESSED REGARDING THIS. * A2.0 REFLECTED CEILING PLANS>>REMOVE CIRCULAR DEPICTIONS MARKED AS TURRET A,B,C,D FROM BOTH THE BASEMENT AND FIRST FLOOR CEILING PLAN AND ILLUSTRATE A FOUR SIDED STRUCTURE. * A3.1 ROOF PLAN>>REMOVE TURRET ROOF DETAIL. REMOVE THE FOUR CIRCULAR DEPICTIONS ON THE ROOF PLAN MARKED 02/A3.1 AND ILLUSTRATE A FOUR SIDED STRUCTURE. * A3.2 ROOF DETAILS>>NO CHANGES. * A3.3 FRAMING PLANS>>ON FIRST FLOOR AND ROOF FRAMING PLAN REMOVE THE CIRCULAR DEPICTIONS AND ILLUSTRATE AS A FOUR SIDED STRUCTURE. * A4.1 EXTERIOR ELEVATIONS>>EAST ELEVATION AND NORTH ELEVATIONS REMOVE THE FOUR TURRETS AND CHANGE TO DEPICT A FOUR SIDED STRUCTURE. * A4.2 EXTERIOR ELEVATIONS>>SOUTH AND WEST ELEVATIONS REMOVE THE FOUR TURRETS AND CHANGE TO DEPICT A FOUR SIDED STRUCTURE. * A5.1 BUILDING SECTIONS>>REMOVE THE ILLUSTRATION THAT EXHIBITS TURRETS. * A6.1 WALL SECTIONS>>NO CHANGES. * A6.2 WALL SECTIONS>>NO CHANGES. * A6.3 WALL SECTIONS>>NO CHANGES. * A6.4 WALL SECTIONS>>NO CHANGES. * A7.1 INTERIOR ELEVATIONS>>06/A7.1 LOCKERS SALSBURY STANDARD METAL LOCKERS 12 DEEP CHANGE TO 12 COMPARTMENTS INSTEAD OF 6. * A8.1 STAIR SELECTION>>REMOVE LADDER ELEVATION, CONNECTION AND LADDER DETAILS. * A9.1 SCHEDULES AND DETAILS>>DOOR SCHEDULE REMOVE ITEMS 005A, 005B, 005C,&005D NOTED AS TURRET A, B, C,&D. ROOM FINISH SCHEDULE REMOVE ITEMS A, B, C,&D NOTED AS TURRET. * A10.1 WINDOW ELEVATIONS AND DETAILS>>NO CHANGES. * P2.1 PLUMBING BASEMENT UNDER FLOOR PLAN>>REMOVE CIRCULAR ILLUSTRATIONS MARKED AS TURRET A, B, C,&D TO INCLUDE STAIRWAY AND DEPICT A FOUR SIDED STRUCTURE. * P2.2 PLUMBING FLOOR PLANS>>ON BOTH THE PLUMBING FIRST AND PLUMBING BASEMENT FLOOR PLAN REMOVE CIRCULAR ILLUSTRATION

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.