Archer Western/demaria Joint Venture Iii

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $99,784 - Monday the 21st of October 2013
    Veterans Affairs Department
    OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT
    INSTALL&OPERATE TEMPORARY CHILLER TO CONDITION AIR INSIDE OF THE NEW - SCI DRY AND HUMIDITY FREE.
  • $89,882 - Monday the 21st of October 2013
    Veterans Affairs Department
    OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT
    PROVIDE ADDITIONAL REQUIRED GROUT AND ADDITIONAL INJECTION PIPE FOOTAGE TO COMPLETE CONTRACT REQUIREMENT GIVEN UNKNOWN UNDERGROUND SITE CONDITIONS.
  • $78,651 - Monday the 21st of October 2013
    Veterans Affairs Department
    OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT
    THE SUMMARY SCOPE CONSIST OF CHANGING THE CURRENT LOCKING GATES FOR THE PATIENT LIFT SYSTEM FROM MANUAL OPERATION TO ELECTRIC OPERATION. THIS CHANGE WILL INCLUDE AN ELECTRONIC HAND CONTROLLER FOR REMOTE OPERATION AND CONTROL.
  • $78,000 - Monday the 21st of October 2013
    Veterans Affairs Department
    OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT
    TAMPA (CONST) POLYTRAUMA&POOL PH 2&3
  • $75,787 - Monday the 21st of October 2013
    Veterans Affairs Department
    OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT
    PROVIDE ALL MATERIAL&LABOR TO: (1) INSTALL ADDITIONAL STEEL FRAMING PER OWNERS RESPONSE TO GC-RFI#-0239. (2) INSTALL ADDITIONAL STEEL FRAMING, METAL PLATES&STEEL FIREPROOFING AT STAIRWELL#4, WEST SIDE, INTERSTITIAL LEVEL, BETWEEN LINE 12.4 AND LINE 12.8 TO SUPPORT ARCHITECTURAL BRICK. (3) INSTALL TWO RIGGING SLEEVES AND EXTENSIONS FOR THE EAST ELEVATION OF THE CLERESTORY PER OWNERS RESPONSE TO GC-RFI#-0305-R-2. (4) INSTALL BENT PLATE TO ALLOW FRAMING MEMBERS TO EXTEND PAST THE EDGE SLAB ALONG E-LINE AT THE 5TH FLOOR PER OWNERS RESPONSE TO GC-RFI#-0268.
  • $6,364 - Monday the 21st of October 2013
    Veterans Affairs Department
    OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT
    PROVIDE ADDITIONAL STRUCTURAL SUPPORT STEEL AND PROVIDE SAFE WALKING AREA IN CONFINED SPACE.
  • $62,528 - Monday the 21st of October 2013
    Veterans Affairs Department
    OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT
    (1) SPLICE THE FIBER OPTIC AT THE SOUTHEAST CORNER. (2) TRIDENT BUILDING SYSTEMS - TO FURNISH AND INSTALL STEEL SUPPORTS AND METAL DECK PER THE ATTACHED SKETCH FROM THE STRUCTURAL ENGINEER. (3) EARTH TECH - PROVIDE ADDITIONAL GROUT AND INJECTION PIPE REQUIRED TO COMPLETE THE REMAINING POINTS IN AREA A FRO RFI#018: GP14-16, GP30-32, GP46-48, GP62-64, GP78-80. (4) EARTH TECH: INSTALL TWO HELICAL PIERS AT RE-DESIGNED FOUNDATION AT SOUTHEAST CONER.
  • $61,729 - Monday the 21st of October 2013
    Veterans Affairs Department
    OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT
    FURNISH AND INSTALL TOOLS, MATERIAL AND LABOR TO PERFORM THE WORK DISCRIBED BELOW IN AREA-J MAT SLAB STEP, BATHROOM TILE SIZE, AND THE HEADWALL WORK.
  • $57,501 - Monday the 21st of October 2013
    Veterans Affairs Department
    OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT
    POLYTRAUMA&THERAPY POOL PROJECT, PH.2&PH.3, TAMPA, FL SA-017 ISSUED TO REVISE STRUCTURAL STEEL 7 ARCHITECTURAL FEATURES ABOVE THE FOUNDATION AT THE SW CORNER OF THE BUILDING.
  • $56,280 - Monday the 21st of October 2013
    Veterans Affairs Department
    OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT
    FURNISH ALL THE LABOR&INSTALL ALL THE MATERIAL FOR: (1) DAMPERS PER VA ANSWERED&A/E REVISED DRAWINGS TO GC-RFI-#0141. (2)CUTTING, REMOVING&RE-INSTALLING FACE BRICK PER VA-RESPONSE TO GC-RFI#0270 AT THE NORTH ELEVATION OF BLDG#38. (3) SWING-UP GRAB BARS TUBE STEEL SUPPORTS INSTALLATION IN THE 24 AFFECTED PATIENT BATHROOMS PER THE REVISED SKETCHES FOR CONTRACT ANCHORAGE DETAIL B4/G009, ACCEPTED-APPROVED BY VA. (4) CONCRETE CURBING AROUND THE HVAC DUCTWORK SHAFT OPENINGS PER OUR ON SITE MEETING IN THE MECHANICAL PENTHOUSES AND OUR SUBSEQUENT AGREEMENT. (5) ADDITIONAL WALL FRAMING PER REVISED ARCHITECTURAL DRAWINGS FOR THE PATIENT HEADWALL CASEWORK AND UTILITIES PER VA RESPONSE TO RFI 251 SERIES A-D.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.