The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Ball Aerospace & Technologies Corp

  • Contact Person: Catherine Pirok Smith
  • Contact Phone: 303-533-7037
  • Contact Email: cpiroksm@ball.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Manufacturer of Goods
  • Industries Served: Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing, Guided Missile and Space Vehicle Manufacturing, Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing, Engineering Services, Geophysical Surveying and Mapping Services, Custom Computer Programming Services, Computer Systems Design Services, Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
  • Product Areas: VIDEO RECORDING AND REPRODUCING EQUIPMENT, VIDEO RECORDING AND REPRODUCING EQU, INDOOR AND OUTDOOR ELECTRIC LIGHTING FIXTURES, INDOOR & OUTDOOR ELEC LIGHTING FIXT, QUALITY CONT SV/LIGHTING FIXTURES, QUALITY CONTROL- LIGHTING FIXTURES AND LAMPS, EQ TEST SVCS/LIGHTING FIXTURES, EQUIPMENT AND MATERIALS TESTING- LIGHTING FIXTURES AND LAMPS, EQUIPMENT AND MATERIALS TESTING- PHOTOGRAPHIC EQUIPMENT, EQ TEST SVCS/PHOTOGRAPHIC EQUIP

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $961,391 - Monday the 11th of March 2013
    National Aeronautics And Space Administration
    GODDARD SPACE FLIGHT CENTER
    THIS PROCUREMENT IS FOR THE OLI INSTRUMENT FOR THE NEXT SPACECRAFT IN THE LANDSAT SERIES OF SATELLITES. THIS PROCUREMENT WILL RESULT IN THE AWARD OF A SINGLE COST-PLUS-AWARD-FEE (CPAF) CONTRACT WITH A PERFORMANCE INCENTIVE. LANDSAT SATELLITES HAVE PROVIDED THE ONLY CONTINUOUS LAND IMAGES SINCE 1972; THE ARCHIVE OF THESE IMAGES IS IN THE CARE OF THE USGS. THE OLI INSTRUMENT IS SCHEDULED TO BE LAUNCHED ON THE LANDSAT SATELLITE IN 2011. PUBLIC LAW 102-155, LAND REMOTE SENSING POLICY ACT OF 1992, STATES THAT NASA MUST MAINTAIN LANDSAT DATA CONTINUITY, AND PUBLIC LAW 105-303, COMMERCIAL SPACE ACT OF 1998, STATES THAT NASA SHOULD ACQUIRE REMOTE SENSING DATA. WHILE COMPLIANCE WITH THE LAWS IS REQUIRED FROM NASA, THE DEVELOPMENT OF LANDSAT IS DONE THROUGH A PARTNERSHIP WITH THE USGS FOR SATELLITE OPERATIONS AND DATA COLLECTION. FOLLOWING LAUNCH AND ACCEPTANCE OF THE LANDSAT SATELLITE, THE CONTRACT WILL BE TRANSITIONED TO USGS FOR SATELLITE OPERATIONS AND DATA COLLECTION.
  • $92,180 - Tuesday the 25th of September 2012
    National Aeronautics And Space Administration
    GODDARD SPACE FLIGHT CENTER
    RAPID SPACECRAFT ACQUISITION MASTER CONTRACT
  • $823,326 - Monday the 11th of March 2013
    National Aeronautics And Space Administration
    GODDARD SPACE FLIGHT CENTER
    THIS PROCUREMENT IS FOR THE OLI INSTRUMENT FOR THE NEXT SPACECRAFT IN THE LANDSAT SERIES OF SATELLITES. THIS PROCUREMENT WILL RESULT IN THE AWARD OF A SINGLE COST-PLUS-AWARD-FEE (CPAF) CONTRACT WITH A PERFORMANCE INCENTIVE. LANDSAT SATELLITES HAVE PROVIDED THE ONLY CONTINUOUS LAND IMAGES SINCE 1972; THE ARCHIVE OF THESE IMAGES IS IN THE CARE OF THE USGS. THE OLI INSTRUMENT IS SCHEDULED TO BE LAUNCHED ON THE LANDSAT SATELLITE IN 2011. PUBLIC LAW 102-155, LAND REMOTE SENSING POLICY ACT OF 1992, STATES THAT NASA MUST MAINTAIN LANDSAT DATA CONTINUITY, AND PUBLIC LAW 105-303, COMMERCIAL SPACE ACT OF 1998, STATES THAT NASA SHOULD ACQUIRE REMOTE SENSING DATA. WHILE COMPLIANCE WITH THE LAWS IS REQUIRED FROM NASA, THE DEVELOPMENT OF LANDSAT IS DONE THROUGH A PARTNERSHIP WITH THE USGS FOR SATELLITE OPERATIONS AND DATA COLLECTION. FOLLOWING LAUNCH AND ACCEPTANCE OF THE LANDSAT SATELLITE, THE CONTRACT WILL BE TRANSITIONED TO USGS FOR SATELLITE OPERATIONS AND DATA COLLECTION.
  • $8,139,271 - Monday the 6th of August 2012
    Defense Advanced Research Projects Agency
    DEF ADVANCED RESEARCH PROJECTS AGCY
    MODIFICATION TO EXERCISE PHASE 2 OPTION TASK 2 UNDER THE MEMBRANE OPTIC IMAGER REAL-TIME EXPLOITATION (MOIRE) PROGRAM.
  • $78,579 - Monday the 31st of October 2011
    Department Of Air Force
    FA8818 HQ SMC SD PKT
    DE-ORBIT CAPABILITY STUDY
  • $77,877 - Monday the 30th of April 2012
    US Coast Guard
    AVIATION LOGISTICS CENTER (ALC)
    ANTENNA
  • $768,517 - Tuesday the 9th of October 2012
    National Aeronautics And Space Administration
    GODDARD SPACE FLIGHT CENTER
    RAPID SPACECRAFT ACQUISITION MASTER CONTRACT DO 2
  • $7,500,000 - Thursday the 20th of April 2017
    National Aeronautics And Space Administration
    GODDARD SPACE FLIGHT CENTER
    ENGINEERING SERVICES AND DEVELOPMENT LEADING TO THE DELIVERY OF THE OMPS PROTOFLIGHT MODEL AND SUPPORT.
  • $75,000 - Wednesday the 21st of December 2011
    National Aeronautics And Space Administration
    AMES RESEARCH CENTER
    KEPLER OPERATIONS ON-ORBIT (PHASE E) CONSISTS OF THE TASKS NECESSARY TO OPERATE THE FLIGHT SYSTEM, RETURNING SCIENCE DATA TO THE GROUND FOR ANALYSIS. THE CONTRACTOR IS RESPONSIBLE FOR OPERATING THE FLIGHT SYSTEM, MONITORING ITS HEALTH AND STATUS AND PROVIDING TECHNICAL SUPPORT FOR TROUBLESHOOTING ANOMALIES.
  • $706,838 - Thursday the 8th of March 2012
    National Aeronautics And Space Administration
    GODDARD SPACE FLIGHT CENTER
    RAPID SPACECRAFT ACQUISITION MASTER CONTRACT

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.