Bechdon Company The
- View government funding actions
- Upper Marlboro, MD 207748746
- Phone:
- Corporate URL: www.bechdon.com
- Estimated Number of Employees: 83
- Estimated Annual Receipts: $14,000,000
- Business Start Date: 1966
- Contact Person: James Taylor
- Contact Phone: 301-249-0900
- Contact Email: jtaylor@bechdon.com
- Business Structure:
- Corporate Entity (Not Tax Exempt)
- Business Type:
- For Profit Organization
- Manufacturer of Goods
- Industries Served: Machine Shops, Precision Turned Product Manufacturing
- Product Areas: AIR CONDITIONING EQUIPMENT
Sampling of Federal Government Funding Actions/Set Asides
In order by amount of set aside monies.
- $990 - Thursday the 4th of May 2017
National Aeronautics And Space Administration
GODDARD SPACE FLIGHT CENTER
COMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL. - $89,600 - Thursday the 4th of May 2017
National Aeronautics And Space Administration
GODDARD SPACE FLIGHT CENTER
CALL 83 COMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL. - $8,700 - Tuesday the 24th of January 2012
Department Of Navy
NAVAL RESEARCH LABORATORY
HOUSING - $825 - Thursday the 4th of May 2017
National Aeronautics And Space Administration
GODDARD SPACE FLIGHT CENTER
CALL 66 M2 COMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL. - $74,530 - Wednesday the 13th of March 2013
Smithsonian Institution
SMITHSONIAN ASTROPHYSICAL OBSERVATORY
LENS HOUSINGS; MACHINE SHOP - $7,195 - Thursday the 4th of May 2017
National Aeronautics And Space Administration
GODDARD SPACE FLIGHT CENTER
CALL 77 COMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL. - $6,950 - Thursday the 4th of May 2017
National Aeronautics And Space Administration
GODDARD SPACE FLIGHT CENTER
CALL 71 COMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL. - $680 - Thursday the 4th of May 2017
National Aeronautics And Space Administration
GODDARD SPACE FLIGHT CENTER
CALL 70 M1 COMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL. - $62,975 - Monday the 2nd of July 2012
National Institute Of Standards And Technology
DEPT OF COMM/NAT INST STAND AND TECHNOL
FABRICATION OF PARTS FOR SHIM ARM DRIVE - $6,295 - Thursday the 4th of May 2017
National Aeronautics And Space Administration
GODDARD SPACE FLIGHT CENTER
CALL 82 COMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL.
© Copyright 2019
The Collier Report published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources.
No reliance should be made by readers or Collier Report subscribers.
Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances.
Requests for the modification of displayed information may be made to help.desk@1918.media.