The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Bluegrass Contracting Corporation

  • Contact Person: Bonny Stewart
  • Contact Phone: 859-231-0069
  • Contact Email: bonnys@bluegrasscontracting.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Veteran Owned Business
  • Subchapter S Corporation
  • Industries Served: Water and Sewer Line and Related Structures Construction, Oil and Gas Pipeline and Related Structures Construction, Highway, Street, and Bridge Construction, Other Heavy and Civil Engineering Construction, Poured Concrete Foundation and Structure Contractors, Structural Steel and Precast Concrete Contractors, Site Preparation Contractors, All Other Specialty Trade Contractors, Asphalt Paving Mixture and Block Manufacturing, Solid Waste Landfill
  • Product Areas: CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS, REPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $9,045 - Wednesday the 7th of March 2012
    Department Of Army
    W072 ENDIST NASHVILLE
    STABILIZE OLD/P ROCK BLUFF --- PROJECT N
  • $63,121 - Tuesday the 12th of June 2012
    Department Of Army
    W072 ENDIST NASHVILLE
    STABILIZE OLD/P ROCK BLUFF --- PROJECT N
  • $490,807 - Wednesday the 19th of December 2012
    Federal Highway Administration
    EASTERN FEDERAL LANDS HIGHWAY DIVISION
    IGF::OT::IGF THE PROJECT CONSISTS OF THE RECONSTRUCTION AND REALIGNMENT OF THE LOW WATER CROSSING ON TURKEY FOOT ROAD [FOREST SERVICE ROAD (FSR) 482] AND THE RESTORATION AND STABILIZATION OF THE SLIDE AREA ON BUCK LICK ROAD (FSR 345). THE WORK INCLUDES THE INSTALLATION OF FOUR, 10-FOOT BY 7-FOOT REINFORCED CONCRETE BOX CULVERTS WITH CONCRETE HEADWALLS AND WINGWALLS, EARTHWORK, MECHANICALLY STABILIZED EARTH WALLS WITH WELDED WIRE FACING, CONCRETE PAVEMENT APPROACHES, AND OTHER MISCELLANEOUS WORK.
  • $4,075 - Thursday the 8th of November 2012
    National Park Service
    SER REGIONAL CONTRACTING OPO
    GUARDRAIL REPAIR AT PARK CITY ROAD FOR MAMMOTH CAVE
  • $36,400 - Wednesday the 14th of March 2012
    Department Of Army
    W072 ENDIST NASHVILLE
    STABILIZE OLD/P ROCK BLUFF --- PROJECT N
  • $20,800 - Thursday the 8th of November 2012
    National Park Service
    SER REGIONAL CONTRACTING OPO
    GUARDRAIL MODIFICATION FOR DOYLE VALLEY OVERLOOK
  • $20,800 - Friday the 9th of November 2012
    National Park Service
    SER REGIONAL CONTRACTING OPO
    GUARD RAIL MODIFICATION AT DOYLE VALLEY OVERLOOK.
  • $2,058,313 - Wednesday the 19th of December 2012
    Federal Highway Administration
    EASTERN FEDERAL LANDS HIGHWAY DIVISION
    IGF::OT::IGF THE PROJECT CONSISTS OF THE REPLACEMENT OF THE CANEY FORK ROAD (SR 1737) BRIDGE #79 (B-4612) OVER CANEY CREEK WITHIN THE NANTAHALA NATIONAL FOREST. THE WORK INCLUDES THE REMOVAL OF THE EXISTING THREE-SPAN STEEL BRIDGE AND THE CONSTRUCTION OF A PRECAST, PRESTRESSED CONCRETE BRIDGE WITH DRILLED SHAFTS, STRUCTURAL CONCRETE, RIPRAP, AND OTHER MISCELLANEOUS WORK.
  • $1,075 - Friday the 9th of November 2012
    National Park Service
    SER REGIONAL CONTRACTING OPO
    GUARD RAIL REPAIR ON PARK CITY ROAD

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.