The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Cadtrak Engineering Llc

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $104,141 - Monday the 26th of November 2012
    National Aeronautics And Space Administration
    NASA SHARED SERVICES CENTER
    FUTURE SAMPLING MISSIONS TO THE MOON, MARS AND ASTEROIDS WILL LIKELY INVOLVE DRILLING AND IN-SITU ANALYSIS FROM MOBILE ROBOTIC PLATFORMS IN LOW GRAVITY. PAST SAMPLING SYSTEMS LIKE THE MER AND MSL ROVERS HAVE USED TOOL BODY PRELOADING AS THEIR METHOD OF STABILIZATION. THIS METHOD PUTS HIGH DEMANDS ON THE DEPLOYMENT DEVICE AND BECOMES LESS VIABLE AS GRAVITY DECREASES, AS WITH AN ASTEROID SAMPLING MISSION. THIS PROPOSAL INVOLVES THE DEVELOPMENT OF AN EFFECTIVE LOW-GRAVITY ANCHORING SYSTEM WHICH WOULD DECREASE THE PRELOAD REQUIREMENT AND PEAK REACTION FORCES ON THE DEPLOYMENT DEVICE. AND IN THE CASE OF ASTEROID OR COMET SAMPLING IT WOULD REDUCE THE DEMAND AND COMPLEXITY OF THE PROPULSION SYSTEM. AT THE END OF THIS PHASE 1 PROPOSAL A PROTOTYPE ANCHOR WILL BE DEVELOPED TO TRL 4. A PROPOSED PHASE 2 EFFORT WOULD DEVELOP A FLIGHT-LIKE SYSTEM AND FIELD TEST IT ADVANCING THE TECHNOLOGY TO TRL 6.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.