The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Canaveral Construction Co Inc

  • Canaveral Construction Co Inc

  • View government funding actions
  • Mims, FL 327545502
  • Phone:
  • Estimated Number of Employees: 13
  • Estimated Annual Receipts: $5,600,000
  • Business Start Date: 1994
  • Contact Person: J David Nash
  • Contact Phone: 321-269-4011
  • Contact Email: david@CanaveralConstruction.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Industries Served: Industrial Building Construction, Commercial and Institutional Building Construction, Water and Sewer Line and Related Structures Construction
  • Product Areas: CONSTRUCTION OF OFFICE BUILDINGS, CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS, CONSTRUCTION OF MAINTENANCE BUILDINGS, CONSTRUCTION OF OTHER WAREHOUSE BUILDINGS, CONSTRUCTION OF MISCELLANEOUS BUILDINGS, CONSTRUCTION OF SEWAGE AND WASTE FACILITIES, REPAIR OR ALTERATION OF OFFICE BUILDINGS, REPAIR OR ALTERATION OF MAINTENANCE BUILDINGS, REPAIR OR ALTERATION OF OTHER INDUSTRIAL BUILDINGS

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $8,266,000 - Tuesday the 22nd of January 2013
    National Aeronautics And Space Administration
    KENNEDY SPACE CENTER
    IGF::OT::IGF OTHER FUNCTIONS REPAIR CRAWLERWAY WITH ADDITIVE OPTIONS
  • $7,600 - Wednesday the 19th of December 2012
    National Aeronautics And Space Administration
    KENNEDY SPACE CENTER
    INSTALL FIRE PROTECTION SYSTEMS, VARIOUS LOCATIONS-PHASE 3 PCN: 98549.3.THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING REQUIREMENTS INTO THIS CONTRACT AND MADE A PART THEREOF: 1. TN 5 - ADD LOADING DOCK SIDEWALL SPRINKLERS, OSB 1, KSC, FL PROVIDE THE NECESSARY MANAGEMENT, SUPERVISION, LABOR, MATERIALS AND EQUIPMENT TO: PROVIDE DRY TYPE SIDEWALL SPRINKLERS THROUGH THE EXTERIOR WALLS SURROUNDING THE LOADING DOCK TO PROVIDE 0.2 GPM/SQ FT DENSITY OF COVERAGE OVER THE AREA OF THE LOADING DOCK COVERED BY THE BUILDING STRUCTURE (DOCK AND COVERED PORTION OF PARKING AREA). NO WATER-FILLED PIPING SHALL BE INSTALLED ON THE LOADING DOCK. ALL SPRINKLERS FOR THE LOADING DOCK SHALL BE FED FROM THE SAME SYSTEM AS OTHER SPRINKLERS FOR THE LOADING DOCK (I.E. WOULD TRIGGER THE SAME FLOW SWITCH(ES) UPON ACTIVATION). PROVIDE ALL NECESSARY MATERIALS AND INSTALLATION IN ACCORDANCE WITH CONTRACT SPECIFICATION REQUIREMENTS, INCLUDING, BUT NOT LIMITED TO PIPING, WALL PENETRATIONS, SEALANT, ETC. TN-5 IS A COST TO THE GOVERNMENT OF $7,600.00. 2. THE CONTRACT PRICE IS INCREASED FROM $1,627,883.00 BY $7,600.00 TO $1,635,483.00. IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENT FOR THE CHANGE, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY FOR FURTHER EQUITABLE ADJUSTMENT ATTRIBUTABLE TO THIS CHANGE. ALL OTHER TERMS AND CONDITIONS UNDER THIS CONTRACT REMAIN UNCHANGED.
  • $5,806 - Wednesday the 19th of December 2012
    National Aeronautics And Space Administration
    KENNEDY SPACE CENTER
    REPLACE FEEDERS AND DUCTS INDUSTRIAL AREA. MOD 15: A. THE PURPOSE OF THIS MODIFICATION IS TO ADD TN 24/ADDITIONAL TASKS TO SUPPORT THE REPLACEMENT OF USS B&C, IN THE AMOUNT OF $5,806.00. B. AS A RESULT OF THIS MODIFICATION, THE TOTAL CONTRACT VALUE WILL INCREASE FROM $5,932,279.00 TO $5,938,085.00; AN INCREASE OF $5,806.00. C. STATEMENT OF RELEASE IT IS HEREBY AGREED THAT THE EQUITABLE ADJUSTMENTS AGREED TO HEREIN CONSTITUTES AN ACCORD AND FULLY SATISFIES ANY AND ALL CLAIMS AGAINST THE GOVERNMENT ARISING OUT OF, OR RELATED TO, THE CHANGES SPECIFIED IN THIS SUPPLEMENTAL AGREEMENT. D. ALL OTHER TERMS AND CONDITIONS NOT SPECIFICALLY MODIFIED HEREIN SHALL REMAIN UNCHANGED.
  • $4,658 - Wednesday the 19th of December 2012
    National Aeronautics And Space Administration
    KENNEDY SPACE CENTER
    REPLACE FEEDERS AND DUCTS INDUSTRIAL AREA. MOD 16: A. THE PURPOSE OF THIS MODIFICATION IS TO ADD TN'S 28 AND 30 AS FOLLOWS: 1) TN-28/GROUNDING LUGS, IN THE AMOUNT OF $2,980.00. 2) TN-30/DOWNSPOUT SPLASH PROTECTION, IN THE AMOUNT OF $1,678.00. B. AS A RESULT OF THIS MODIFICATION, THE TOTAL CONTRACT VALUE WILL INCREASE FROM $5,938,085.00 TO $5,942,743.00; AN INCREASE OF $4,658.00. C. STATEMENT OF RELEASE IT IS HEREBY AGREED THAT THE EQUITABLE ADJUSTMENTS AGREED TO HEREIN CONSTITUTES AN ACCORD AND FULLY SATISFIES ANY AND ALL CLAIMS AGAINST THE GOVERNMENT ARISING OUT OF, OR RELATED TO, THE CHANGES SPECIFIED IN THIS SUPPLEMENTAL AGREEMENT. D. ALL OTHER TERMS AND CONDITIONS NOT SPECIFICALLY MODIFIED HEREIN SHALL REMAIN UNCHANGED.
  • $45,000 - Wednesday the 29th of April 2015
    National Aeronautics And Space Administration
    KENNEDY SPACE CENTER
    INSTALL FIRE PROTECTION SYSTEMS, VARIOUS LOCATIONS-PHASE 3 PCN: 98549.3. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING REQUIREMENTS INTO THIS CONTRACT AND MADE A PART THEREOF: 1. TN 6: ADD HEAT DETECTORS AND ELEVATOR SHUNT TRIP CAPABILITY, OSB 1, KSC, FL PROVIDE THE NECESSARY MANAGEMENT, SUPERVISION, LABOR, MATERIALS AND EQUIPMENT TO: A. ADD NON-ADDRESSABLE, UL LISTED 135 DEG F FIXED TEMPERATURE HEAT DETECTORS TO THE EXISTING HEAT DETECTOR CIRCUIT IN ELEVATOR MACHINE ROOM 1110 TO ACCOUNT FOR THE ADDITIONAL HEAT DETECTORS REQUIRED BY NFPA AND ASME CODES WITHIN TWO FEET OF EACH SPRINKLER HEAD. REPLACE AND REPOSITION EXISTING HEAT DETECTORS IN ELEVATOR MACHINE ROOM AS NECESSARY WITH 135 DEG F FIXED TEMPERATURE HEAT DETECTORS. REWORK CONDUIT, WIRING, AND EXISTING ADDRESSABLE MODULE FOR THIS CIRCUIT AS NECESSARY. PROVIDE OTHER MATERIALS AS NECESSARY. PROVIDE MATERIALS AND INSTALLATION PRACTICES MEETING CONTRACT SPECIFICATION REQUIREMENTS. MATCH EXISTING DETECTOR MAKE/MODEL OR PROVIDE CUT SHEETS FOR EQUIVALENT PRODUCT IN RESPONSE TO THIS FACT SHEET (SOFT COPIES ACCEPTABLE). B. PERFORM ITEM 1 ABOVE FOR ELEVATOR MACHINE ROOM 1216, AS WELL. C. PROVIDE MODULES, PROGRAMMING, BREAKERS, CONDUIT, WIRING, AND OTHER MATERIALS NECESSARY FOR TYING IN ELEVATOR SHUT DOWN (SHUNT TRIP) CAPABILITY ON ACTIVATION OF HEAT DETECTORS IN ELEVATOR MACHINE ROOMS. PROVIDE SHUNT TRIP POWER MONITORING. PROVIDE MATERIALS AND INSTALLATION PRACTICES MEETING CONTRACT SPECIFICATION REQUIREMENTS. PROVIDE CUT SHEETS FOR DEVICES INSTALLED, TEST PROCEDURE, AND MODIFIED FIRE ALARM PROGRAM IN RESPONSE TO THIS FACT SHEET (SOFT COPIES ACCEPTABLE). D. PROVIDE TESTING OF THE NEWLY INSTALLED SHUNT TRIP CAPABILITY. COORDINATE TESTING OF FIRE ALARM CONTROL PANEL REPROGRAMMING WITH FINAL 10% TESTING OF FIRE ALARM DEVICES REQUIRED BY NFPA 72. E. COORDINATE REQUIRED OUTAGES AND SHOP SUPPORT WITH CONSTRUCTION INSPECTOR. TN-6 IS A COST TO THE GOVERNMENT OF $45,000.00. 2. THE CONTRACT PRICE IS INCREASED FROM $1,635,483.00 BY $45,000.00 TO $1,680,483.00. IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENT FOR THE CHANGE, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY FOR FURTHER EQUITABLE ADJUSTMENT ATTRIBUTABLE TO THIS CHANGE. ALL OTHER TERMS AND CONDITIONS UNDER THIS CONTRACT REMAIN UNCHANGED.
  • $447,000 - Tuesday the 22nd of January 2013
    National Aeronautics And Space Administration
    KENNEDY SPACE CENTER
    IGF::OT::IGF OTHER FUNCTIONS - LAUNCH COMPLEX 39, LAUNCH PAD 39B, REPLACE PAD B CATACOMB FIRE&WATER PIPING, PCN: 98894
  • $37,306 - Wednesday the 19th of December 2012
    National Aeronautics And Space Administration
    KENNEDY SPACE CENTER
    INSTALL FIRE PROTECTION SYSTEMS, VARIOUS LOCATIONS-PHASE 3 PCN: 98549.3 MOD 3: THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING REQUIREMENTS INTO THIS CONTRACT AND MADE A PART THEREOF: 1. TN 3 - OSB 1 EXTRA HEADS REQUIRED PER WALL MOVES BY OTHERS, OSB 1, KSC, FL PROVIDE THE NECESSARY MANAGEMENT, SUPERVISION, LABOR, MATERIALS AND EQUIPMENT TO: A. PROVIDE ADDITIONAL SPRINKLER SYSTEM COMPONENTS AS REQUIRED TO MEET THE APPROPRIATE SPRINKLER COVERAGE DEFINED BY CONTRACT DOCUMENTS WHERE WALL MODIFICATIONS HAVE BEEN MADE BY OTHERS SIGNIFICANTLY IMPACTING THE SPRINKLER HEAD LAYOUT, HEAD COUNT, AND QUANTITY OF BRANCH LINES INTENDED TO BE INSTALLED BY THE CONTRACTOR BASED ON FLOOR PLANS FOR CERTAIN AREAS FROM DESIGN DRAWINGS. CLEARLY IDENTIFY/QUANTIFY THE IMPACT OF THE WALL MODIFICATIONS THAT HAVE BEEN MADE VERSUS THE EXISTING CONDITIONS FROM THE DESIGN DRAWINGS (I.E. BEFORE AND AFTER CONDITIONS). B. PROVIDE COMPONENTS THAT CORRESPOND TO SPECIFICATION REQUIREMENTS AND ARE THE SAME AS COMPONENTS ALREADY APPROVED FOR USE IN PREVIOUS CONSTRUCTION TRANSMITTALS. TN-3 IS A COST TO THE GOVERNMENT OF $35,048.00. 2. TN 4 - ADJUST ELEVATOR PIT SPRINKLER PIPING TO ASSURE NO INTERFERENCES, OSB 1, KSC, FL PROVIDE THE NECESSARY MANAGEMENT, SUPERVISION, LABOR, MATERIALS AND EQUIPMENT TO: A. REMOVE THE NEWLY INSTALLED HORIZONTAL SPRINKLER PIPING FROM THE BACK (SOUTH) WALL OF THE PIT AND RELOCATE IT TO THE FRONT (NORTH) WALL OF THE PIT. REWORK/REPLACE COMPONENTS AS NECESSARY. B. RETAIN VERTICAL PIPING AS INSTALLED AND TIE INTO THE RELOCATED PIPING ON THE FRONT (NORTH) WALL OF THE PIT. PROVIDE NEW PIPING AS NECESSARY FOR THIS CONNECTION. C. PROVIDE GUARDS AS REQUIRED FOR ANY CATCH POINTS NEAR THE TRAVEL CABLE. D. NEW/MOVED/REWORKED/REPLACED COMPONENTS TO MEET CONTRACT SPECIFICATION PRODUCT/INSTALLATION REQUIREMENTS. TN-4 IS A COST TO THE GOVERNMENT OF $2,258.00. 3. TOTAL COST TO THE GOVERNMENT FOR TN-3 AND TN-4 IS: $35,048.00 (TN-3) + $2,258.00 (TN-4) = $37,306.00 4. THE CONTRACT PRICE IS INCREASED FROM $1,590,577.00 BY $37,306.00 TO $1,627,883.00 5. THE CONTRACT EXPIRATION DATE IS EXTENDED TO 2 AUG 2013. IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENT FOR THE CHANGE, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY FOR FURTHER EQUITABLE ADJUSTMENT ATTRIBUTABLE TO THIS CHANGE. ALL OTHER TERMS AND CONDITIONS UNDER THIS CONTRACT REMAIN UNCHANGED.
  • $3,360 - Tuesday the 22nd of January 2013
    National Aeronautics And Space Administration
    KENNEDY SPACE CENTER
    MODIFY CANISTER ROTATION FACILITY COMPLEX FOR LAUNCH ABORT SYSTEM, PCN: 98839.1. THE PURPOSE OF THIS SUPPLEMENTAL AGREEMENT IS TO INCORPORATE THE BELOW LISTED CHANGES INTO SUBJECT DELIVERY ORDER. 1. INCORPORATE THE FOLLOWING TRACKING NUMBER (TN) INTO SUBJECT CONTRACT AS CHANGED WORK. TN# DESCRIPTION 2 FACT SHEET AND RFI 8, 1 PAGE - RELOCATE EXISTING CONDUITS, $900.00. 3 FACT SHEET AND RFI 7, 1 PAGE - DESCOPE INSTALLATION OF NEW DOOR, ($2,340.00). 4 FACT SHEET AND RFI 12, 1 PAGE - RELOCATE 4 INDICATOR LIGHTS, $2,260.00. 5 FACT SHEET AND RFI 14, 1 PAGE - RELOCATE MEDIA CONVERTER JUNCTION BOX, $1,700.00. 6 FACT SHEET, 1 PAGE - INSTALL 2 EXTERIOR PHONE BOXES, $840.00. TOTAL FOR ALL TN'S ABOVE: $3,360.00 2. CHANGE BLOCK 22 OF THE SF 1442 TO READ $239,360.00 IN LIEU OF $236,000.00, AN INCREASE OF $3,360.00. 3. THE DELIVERY ORDER COMPLETION DATE OF JULY 16, 2012 REMAINS UNCHANGED. IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENT FOR THE CHANGE, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY FOR FURTHER EQUITABLE ADJUSTMENT ATTRIBUTABLE TO THIS CHANGE. ALL OTHER TERMS AND CONDITIONS REMAIN IN FULL FORCE AND EFFECT.
  • $26,693 - Wednesday the 19th of December 2012
    National Aeronautics And Space Administration
    KENNEDY SPACE CENTER
    REPLACE FEEDERS AND DUCTS INDUSTRIAL AREA. THE PURPOSE OF THIS MOD IS TO INCORPORATE TN'S 25, 26, 27 AND 29.
  • $236,000 - Tuesday the 22nd of January 2013
    National Aeronautics And Space Administration
    KENNEDY SPACE CENTER
    MODIFY CANISTER ROTATION FACILITY COMPLEX FOR LAUNCH ABORT SYSTEM, PCN: 98839.1

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.