The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Cdm Constructors Inc

  • Cdm Constructors Inc

  • View government funding actions
  • Rancho Cucamonga, CA 917308561
  • Phone: 303-383-2300
  • Estimated Number of Employees: 4,300
  • Estimated Annual Receipts: $1,094,000,000
  • Business Start Date: 1992
  • Contact Person: Lynell Scott
  • Contact Phone: 303-383-2380
  • Contact Email: scottdl@cdmsmith.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Industries Served: Industrial Building Construction, Commercial and Institutional Building Construction, Water and Sewer Line and Related Structures Construction, Oil and Gas Pipeline and Related Structures Construction, Power and Communication Line and Related Structures Construction, Other Heavy and Civil Engineering Construction, Poured Concrete Foundation and Structure Contractors, Plumbing, Heating, and Air-Conditioning Contractors, Engineering Services, Remediation Services
  • Product Areas: ARCHITECT AND ENGINEERING- GENERAL: OTHER, OTHER ARCHITECTS & ENGIN GEN

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $100,112,660 - Wednesday the 12th of September 2012
    Department Of Army
    W075 ENDIST LOS ANGELES
    DESIGN BUILD - EDR WATER TREATMENT AND SYSTEM DESIGN AND CONSTRUCTION ACTIVITIES INCLUDING BUT NOT LIMITED TO THE DESIGN BUILD OF A 6.0 MILLION GALLONS PER DAY (MGD) EDR WATER TREATMENT PLANT. THE PLANT WILL TREAT ALL CONTAMINANTS FOUND IN FORT IRWIN'S GROUND WATER IN ACCORDANCE WITH (IAW) FEDERAL AND STATE REQUIREMENTS (I.E.: ARSENIC, FLUORIDE, AND TOTAL DISSOLVED SOLIDS). THE PLANT WILL INCLUDE AN ELECTRO-DIALYSIS REVERSAL (EDR) SYSTEM AS PRIMARY TREATMENT. THE PROJECT ALSO INCLUDES THE CONSTRUCTION OF THE EDR FACILITY WITH PUMPS, EDR STACKS, FILTERS, AND AN EDR WASTE EQUALIZATION TANK. THE PLANT ALSO INCLUDES TREATMENT OF THE WASTE STREAM TO ACHIEVE 99.8% POTABLE WATER RECOVERY RATE WITH REJECT DISCHARGE TO EVAPORATION PONDS. CONSTRUCTION ALSO INCLUDES A 1 MILLION GALLON (MG) PRETREATMENT TANK AND A 1 MG CLEAR WELL TANK. PROJECT ALSO INCLUDES CONTROL BUILDING, CHEMICAL BUILDING, TREATED WATER PUMP STATION, PROCESS DRAIN PUMP STATION, STANDBY GENERATOR, PROCESS PIPING, AND SCADA. THE PROJECT INCLUDES SUPPORTING UTILITIES AND INFRASTRUCTURE UPGRADES TO THE WATER PLANT INCLUDE ELECTRIC SERVICE, SITE IMPROVEMENTS, COMMUNICATIONS, WATER, SEWER, GAS, STORM WATER DRAINAGE AND ANTITERRORISM MEASURES. COMMISSIONING OF THE WATER TREATMENT PLANT IS ALSO INCLUDED. THE WATER SYSTEM IMPROVEMENTS INCLUDE PIPELINES CONNECTING THE WATER PLANT TO BICYCLE LAKE BOOSTER STATION, REPLACEMENT OF EXPIRED PIPE AND EQUIPMENT, AND WATER SUPPLY /DISTRIBUTION SYSTEM EXPANSION. OTHER SYSTEM IMPROVEMENTS INCLUDE IMPROVEMENT OF FIRE FLOW, INSTALLATION OF A NEW WATER WELL AT LANGFORD LAKE AND CONNECTING IRWIN BASIN WELLS TO RAW WATER TRANSMISSION LINES. TANK CONSTRUCTION INCLUDES REHABILITATION OF EXISTING WELDED STEEL WATER STORAGE TANKS AND REPAIR/REPLACEMENT OF A 1 MG ABOVE GROUND WATER STORAGE TANK. SUSTAINABLE DESIGN AND DEVELOPMENT (SDD), ENERGY INDEPENDENCE AND SECURITY ACT (EISA) OF 2007, AND ENERGY POLICY ACT OF 2005 (EPACT05) FEATURES WILL BE INCLUDED.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.