The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Cianbro Corporation

  • Contact Person: Rick Leonard
  • Contact Phone: 207-679-2250
  • Contact Email: rleonard@cianbro.com
  • Business Structure:
  • Other
  • Business Type:
  • For Profit Organization
  • Subchapter S Corporation
  • Industries Served: Industrial Building Construction, Commercial and Institutional Building Construction, Water and Sewer Line and Related Structures Construction, Oil and Gas Pipeline and Related Structures Construction, Power and Communication Line and Related Structures Construction, Highway, Street, and Bridge Construction, Other Heavy and Civil Engineering Construction, Poured Concrete Foundation and Structure Contractors, Structural Steel and Precast Concrete Contractors, Plumbing, Heating, and Air-Conditioning Contractors, Other Building Equipment Contractors, Site Preparation Contractors, Administrative Management and General Management Consulting Services
  • Product Areas: DIESEL ENGINES AND COMPONENTS, ENGINE AIR AND OIL FILTERS, STRAINERS, AND CLEANERS, NONAIRCRAFT, ENGINE AIR & OIL FILTERS - NONAIR, EARTH MOVING AND EXCAVATING EQUIPMENT, EARTH MOVING & EXCAVATING EQ, MAT HANDLING EQ - NONSELF-PROPELLED, MATERIAL HANDLING EQUIPMENT, NONSELF-PROPELLED, WAREHOUSE TRKS & TRACTORS SELF-PROP, WAREHOUSE TRUCKS AND TRACTORS, SELF-PROPELLED, MISC MATERIALS HANDLING EQ, MISCELLANEOUS MATERIALS HANDLING EQUIPMENT, ELEC PORTABLE & HAND LIGHTING EQ, ELECTRIC PORTABLE AND HAND LIGHTING EQUIPMENT, SUBSURFACE MINING EQUIPMENT (BASIC), R&D- MINING: SUBSURFACE MINING EQUIPMENT (BASIC RESEARCH), LEASE OR RENTAL OF EQUIPMENT- TRACTORS, LEASE-RENT OF TRACTORS, LEASE-RENT OF MATERIALS HANDLING EQ, LEASE OR RENTAL OF EQUIPMENT- MATERIALS HANDLING EQUIPMENT

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $974,626 - Friday the 16th of November 2012
    National Park Service
    DSC CONTRACTING SERVICES DIVISION
    RECOVERY CHOH-149742, BIG SLACKWATER TOWPATH MODIFICATION 0012 IS ISSUED TO SETTLE OUTSTANDING ISSUES FOR CLOSEOUT INCLUDING: SETTLEMENT OF VARIATION IN ESTIMATED QUANTITIES, SETTLING COSTS FOR IN-SCOPE CHANGES, AND EXTENSION OF PERIOD OF PERFORMANCE.
  • $93,381 - Friday the 16th of November 2012
    National Park Service
    DSC CONTRACTING SERVICES DIVISION
    RECOVERY CHOH 049742 STABILIZE BIG SLACKWATER HISTORIC STONE WALL AND TOWPATH, CHESAPEAKE AND OHIO CANAL NATIONAL HISTORICAL PARK. MODIFICATION 0008 PROVIDES FOR ADDITIONAL IN-SCOPE WORK (CONCRETE FILL REINFORCEMENT AND ABUTMENT REPAIR) AND A CREDIT TO THE GOVERNMENT FOR A CONTRACTOR PROPOSED CHANGE TO THE EXPANSION JOINT DETAIL.
  • $82,648 - Friday the 16th of November 2012
    National Park Service
    DSC CONTRACTING SERVICES DIVISION
    RECOVERY CHOH 049742 STABILIZE BIG SLACKWATER HISTORIC STONE WALL AND TOWPATH, CHESAPEAKE AND OHIO CANAL NATIONAL HISTORICAL PARK. THIS UNILATERAL MODIFICATION ADDS ARRA FUNDING TO BUILD CONTINUE EXCAVATION TO COMPETENT ROCK DUE TO DIFFEREING SITE CONDITIONS. THIS CHANGE ORDER PARTIALLY FUNDS EFFORT ON THE GOVERNMENT'S BEST ESTIMATE FOR THE ABOVE WORK AT TIME OF ISSUANCE. THE CONTRACTOR SHALL ADVISE THE GOVERNMENT OF PROGRESS, AND SHALL NOT EXCEED THE FUNDED AMOUNT CONTAINED IN THIS MODIFICATION.
  • $788,375 - Wednesday the 19th of December 2012
    Federal Highway Administration
    EASTERN FEDERAL LANDS HIGHWAY DIVISION
    IGF::OT::IGF THE PROJECT CONSISTS OF REPAIRS TO THE ARLINGTON MEMORIAL BRIDGE BASCULE SPAN. THE WORK INCLUDES REPAIRING THE BEARING SEATS, SUPPORT COLUMNS, STRINGERS, AND OTHER CONCRETE AREAS, AND OTHER MISCELLANEOUS WORK.
  • $657,260 - Friday the 16th of November 2012
    National Park Service
    DSC CONTRACTING SERVICES DIVISION
    RECOVERY CHOH 049742 STABILIZE BIG SLACKWATER HISTORIC STONE WALL AND TOWPATH, CHESAPEAKE AND OHIO CANAL NATIONAL HISTORICAL PARK. THIS UNILATERAL MODIFICATION ADDS NON-ARRA FUNDING TO BUILD A NEW STONE WALL USING NEW STONE IN ACCORDANCE WITH CLAUSE 52.211-18 VARIATION AND ESTIMATED QUANTITIES. THIS CHANGE ORDER PARTIALLY FUNDS EFFORT ON THE GOVERNMENT'S BEST ESTIMATE FOR THE ABOVE WORK AT TIME OF ISSUANCE. THE CONTRACTOR SHALL ADVISE THE GOVERNMENT OF PROGRESS, AND SHALL NOT EXCEED THE FUNDED AMOUNT CONTAINED IN THIS MODIFICATION.
  • $60,102 - Monday the 24th of September 2012
    Department Of Navy
    NAVAL FAC ENGINEERING CMD MID LANT
    REA FOR ADDITIONAL EXCAVATION WORK
  • $225,000 - Friday the 16th of November 2012
    National Park Service
    DSC CONTRACTING SERVICES DIVISION
    RECOVERY CHOH 049742 STABILIZE BIG SLACKWATER HISTORIC STONE WALL AND TOWPATH, CHESAPEAKE AND OHIO CANAL NATIONAL HISTORICAL PARK. THIS MODIFICATION EXTENDS THE PERIOD OF PERFORMANCE THROUGH MAY 25, 2012, AND ADDS FUNDING FOR EXTENDED FIELD OVERHEAD.
  • $117,497 - Tuesday the 25th of September 2012
    Federal Highway Administration
    EASTERN FEDERAL LANDS HIGHWAY DIVISION
    CM #8 ADDES WORK FOR ASPHALT MOW STRIP, CREDIT FOR PROJECT SAVINGS, WATER QUALITY MONITORING AND CHANGE TO GUARDRAIL END TERMINALS. CM ALSO ADDED 70 CD TO CONTRACT TIME.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.