The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Sanchez Daniel dba Dansa Construction

  • Sanchez Daniel dba Dansa Construction

  • View government funding actions
  • Fontana, CA 923365461
  • Phone: 909-322-7419
  • Estimated Number of Employees: 8
  • Estimated Annual Receipts: $800,000
  • Business Start Date: 1993
  • Contact Person: Daniel Sanchez
  • Contact Phone: 909-322-7419
  • Contact Email: dansaconst96@yahoo.com
  • Business Structure:
  • Sole Proprietorship
  • Business Type:
  • For Profit Organization
  • Industries Served: Commercial and Institutional Building Construction, Framing Contractors, Electrical Contractors and Other Wiring Installation Contractors, Drywall and Insulation Contractors, Painting and Wall Covering Contractors, Flooring Contractors, Finish Carpentry Contractors, All Other Specialty Trade Contractors
  • Product Areas: OFFICE SUPPLIES, PAPER AND PAPERBOARD

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $600 - Thursday the 16th of February 2012
    Public Buildings Service
    LOS ANGELES SERVICE CENTER, LAGUNA FIELD OFFICE
    CONTRACTOR TO PROVIDE AIR SAMPLING TO ACCOMMODATE THE UNFORSEEN CONDITION OF THE FLOOR BEING OUT OF LEVEL.
  • $5,350 - Thursday the 13th of September 2012
    Public Buildings Service
    LOS ANGELES SERVICE CENTER, LAGUNA FIELD OFFICE
    CONTRACTOR TO PROVIDE LABOR, MATERIAL AND SUPERVISION TO INSTALL KITCHEN CABINETS IN SUITE 705.
  • $4,680 - Tuesday the 1st of November 2011
    Public Buildings Service
    LOS ANGELES SERVICE CENTER, LAGUNA FIELD OFFICE
    INSTALLATION OF NEW DOOR IN ROOM 2118
  • $3,400 - Friday the 14th of September 2012
    Public Buildings Service
    LOS ANGELES SERVICE CENTER, LAGUNA FIELD OFFICE
    FABRICATE BROWN GRANITE
  • $3,275 - Thursday the 10th of November 2011
    Public Buildings Service
    LOS ANGELES SERVICE CENTER, LAGUNA FIELD OFFICE
    INSTALL ELECTRICAL DATA GSA OIG OFFICE LAGUNA NIGUEL CA
  • $3,000 - Tuesday the 25th of October 2011
    Public Buildings Service
    LOS ANGELES SERVICE CENTER, LAGUNA FIELD OFFICE
    CONTRACT TO PROVIDE MATERIAL, LABOR AND SUPERVISION TO COMPLETE THE FOLLOW: DESCRIPTION OF WORK: INSTALL OUTLETS IN THE FOLLOWING LOCATIONS. PLEASE NOTE THAT ALL OUTLETS ARE TO BE SURFACE MOUNTED. 1. INSTALL/RELOCATE 13 MISC OUTLETS IN THE FOLLOWING AREAS: INDUSTRY OPERATIONS COPY AREA: INSTALL ONE (1) QUAD OUTLET 18" AFF ON THE LEFT WALL CRIMINAL ENFORCEMENT COPY ROOM AREA: INSTALL TWO (2) OUTLETS (ONE QUAD AND ONE DUPLEX) 18" AFF ON THE WALL ELECTRONIC SURVEILLANCE ROOM AREA: INSTALL ONE (1) QUAD OUTLET 18" AFF ON THE WALL CRIMINAL ENFORCEMENT DUBBING AREA: INSTALL ONE (1) OUTLET 18" AFF ON THE WALL RESIDENT IN CHARGE (RAC) OFFICE: INSTALL ONE (1) DUPLEX OUTLET 18" AFF ON THE WALL SECURITY MONITORS: RELOCATE SEVEN (7) OUTLETS BELOW CEILING LEVEL AND MOUNT THEM BEHIND EACH MONITOR. CORRIDOR WALLS HAVE EXPANDED METAL. 2. INSTALL TWO (2) 3'-0" POWER STRIP/PLUG MOLDS, ONE ON EACH SIDE OF THE SECURITY SYSTEM IN THE LAN ROOM. 3. INSTALL ONE (1) DEDICATED QUAD OUTLET 18" AFF ON THE WALL IN THE BACK AREA OF THE LAN ROOM. COMPLETION: 30 CALENDAR DAYS FROM NTP.
  • $21,191 - Wednesday the 10th of October 2012
    Public Buildings Service
    LOS ANGELES SERVICE CENTER, NORTH SPRING FIELD OFFICE
    PERFORM TENANT IMPROVEMENTS TO 7TH FLOOR CONFERENCE ROOM&LOBBY AREA FOR U.S. PRETRIAL SERVICES LOCATED @ THE U.S. COURTHOUSE.
  • $19,263 - Tuesday the 17th of July 2012
    Public Buildings Service
    LOS ANGELES SERVICE CENTER, NORTH LOS ANGELES FIELD OFFICE
    SOUND PROOF WALLS IN A CONFERENCE ROOM AND PRIVATE OFFICE IN DHS SUITE 6211, FEDERAL BUILDING, 300 N LOS ANGELES ST, LOS ANGELES, CA
  • $17,500 - Friday the 15th of June 2012
    Public Buildings Service
    LOS ANGELES SERVICE CENTER, LAGUNA FIELD OFFICE
    OTHER REPAIR OF COURTROOM CHAMBERS
  • $10,777 - Friday the 10th of July 2015
    Public Buildings Service
    LOS ANGELES SERVICE CENTER, LAGUNA FIELD OFFICE
    1. INSTALL 78 SF OF FRP OUTSIDE ROOM 2022 (SEE ATTACHMENT C). 2. PATCH AND PAINT MISC LOCATIONS (SEE ATTACHMENT C) IN THE FOLLOWING SUITES: EIGHT WALLS AND TWO TOUCH UPS IN SUITE 3005, ALL FOUR WALLS IN SUITE 3027, TWO WALLS IN SUITE 3033, ONE WALL AND ONE TOUCH UP IN SUITE 3039, TWO WALLS NEAR 2010&2011, TWO WALLS NEAR 2021, ONE WALL OUTSIDE 2036 AND 2034, ONE WALL INSIDE SUITE 2036, ONE WALL OUTSIDE 2053, ONE WALL OUTSIDE 2066, ONE WALL OUTSIDE SUITE 2078 3. CONTRACTOR TO MOVE ALL FURNITURE, BOXES AND OBSTRUCTIONS IN ORDER TO THOROUGHLY PAINT WALL UNLESS SPECIFICALLY INSTRUCTED TO DO OTHERWISE. 4. INSTALL ONE CORNER GUARD OUTSIDE SUITE 2036 5. PAINT SUITE 1046 DOOR 6. REPLACE DAMAGED COVE BASE ON BOTH SIDES OF HALL NEAR SUITE 1046 7. REPLACE VCT TILES ON 22 CIRCULAR ACCESS PANELS IN 1ST FLOOR LOBBY. 8. REPLACE VCT TILES ON 4 CIRCULAR ACCESS PANELS IN SUITE 3019. 9. INSTALL 66 LF OF CHERRY CHAIR RAIL IN THIRD FLOOR TRAINING ROOM SUITE 3019. 10. INSTALL LATCH ON THIRD FLOOR TRAINING ROOM WINDOW SUITE 3019 (SEE ATTACHMENT A AND ATTACHMENT C)

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.