The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

El Paso Arc Electric Inc

  • Contact Person: Angel Ortiz
  • Contact Phone: 915-593-3700
  • Contact Email: angelarc@sbcglobal.net
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • Minority Owned Business
  • Self Certified Small Disadvantaged Business
  • For Profit Organization
  • Hispanic American Owned
  • Industries Served: Water and Sewer Line and Related Structures Construction, Power and Communication Line and Related Structures Construction, Highway, Street, and Bridge Construction, Electrical Contractors and Other Wiring Installation Contractors, Plumbing, Heating, and Air-Conditioning Contractors, All Other Specialty Trade Contractors
  • Product Areas: INSTALL OF PLUMBING-HEATING EQ, INSTALLATION OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT, INSTALL OF WATER PURIFICATION EQ, INSTALLATION OF EQUIPMENT- WATER PURIFICATION AND SEWAGE TREATMENT EQUIPMENT, INSTALLATION OF EQUIPMENT- PIPE, TUBING, HOSE, AND FITTINGS, INSTALL OF PIPE-TUBING-HOSE, INSTALLATION OF EQUIPMENT: VALVES, INSTALLATION OF EQUIPMENT- VALVES, INSTALLATION OF EQUIPMENT- MAINTENANCE AND REPAIR SHOP EQUIPMENT, INSTALL OF MAINT REPAIR SHOP EQ, INSTALL OF CONTRUCT MATERIAL, INSTALLATION OF EQUIPMENT- CONSTRUCTION AND BUILDING MATERIALS, INSTALL OF ELECT-ELCT EQ, INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS, INSTALL OF FIBER OPTICS MATERIAL, INSTALLATION OF EQUIPMENT- FIBER OPTICS MATERIALS, COMPONENTS, ASSEMBLIES, AND ACCESSORIES, INSTALL OF POWER DISTRIBUTION EQ, INSTALLATION OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT, INSTALL OF LIGHTING FIXTURES, INSTALLATION OF EQUIPMENT- LIGHTING FIXTURES AND LAMPS, INSTALLATION OF EQUIPMENT- ALARM, SIGNAL, AND SECURITY DETECTION SYSTEMS, INSTALL OF ALARM & SIGNAL SYSTEM, INSTALL OF MISC EQ, INSTALLATION OF EQUIPMENT- MISCELLANEOUS

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $7,457 - Friday the 6th of January 2012
    Drug Enforcement Administration
    DIVISION-EL PASO INTELLIGENCE CENTER
    CONTRACTOR WILL MAKE NECESSARY PREPARATIONS TO REPLACE THE BROKEN 250 AMP MAINTENANCE BYPASS BREAKER (MBB) IN UPS NO. 3 BYPASS PANEL LOCED IN ELECTRICAL ROOM 216 AS PER THE ATTACHED SCOPE OF WORK.
  • $2,994 - Friday the 10th of February 2012
    Drug Enforcement Administration
    DIVISION-EL PASO INTELLIGENCE CENTER
    ELECTRICAL WORK
  • $26,300 - Saturday the 1st of December 2012
    Drug Enforcement Administration
    HEADQUARTERS-DRUG ENFORCEMENT ADMINISTRATION
    IGF::CT::IGF CRITICAL FUNCTION - REPAIR OF TRANSFORMER

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.