Sampling of Federal Government Funding Actions/Set Asides
In order by amount of set aside monies.
- $34,988 - Monday the 13th of July 2015
Department Of Army
W072 ENDIST LOUISVILLE
CASE 030 PROVIDE ELECTRICAL POWER AND MOTOR TO EXISTING SECURITY GATE, BRAC U.S. ARMY RESERVE EQUIPMENT CONCENTRATION SITE, LAKEHURST, NJ - $32,248 - Monday the 13th of July 2015
Department Of Army
W072 ENDIST LOUISVILLE
CASE 029 PROVIDE REMOVABLE 2" DIAMETER STEEL SAFETY RAILS TO LOADING RAMP, DESIGN/BUILD ARMY RESERVE EQUIPMENT CONCENTRATION SITE, LAKEHURST, NJ - $268,666 - Monday the 13th of July 2015
Department Of Army
W072 ENDIST LOUISVILLE
CASE 023 INSTALL METER AND METERING CABINET TO VEHICLE MAINTENANCE FACILITY, PROVIDE NEW OVERHEAD CONDUITES INSIDE FACILITY, REMOVE EXISTING METER FROM TRANSFORMER AND RELOCATE TO OUTSIDE WALL OF NATIONAL GUARD BUILDING AND INSTALL IN NEW METERING CABINET, REMOVE CONCRETE PAVING AND EXCAVATE TO TIE TO EXISTING UNDERGROUND CONDUITS, DESIGN/BUILD BRAC U.S. ARMY RESERVE EQUIPMENT CONCENTRATION SITE, LAKEHURST, NJ - $20,285 - Monday the 13th of July 2015
Department Of Army
W072 ENDIST LOUISVILLE
CASE 031 PROVIDE NEW SLIDING WINDOW WITH METAL ROLL UP COUNTER, U.S. ARMY RESERVE EQUIPMENT CONCENTRATION SITE, LAKEHURST, NJ - $100,000 - Monday the 13th of July 2015
Department Of Army
W072 ENDIST LOUISVILLE
ARMY RESERVE EQUIPMENT CONCENTRATION SIT
© Copyright 2019
The Collier Report published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources.
No reliance should be made by readers or Collier Report subscribers.
Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances.
Requests for the modification of displayed information may be made to help.desk@1918.media.