Fire Risk Management Inc
- View government funding actions
- Bath, ME 045302562
- Phone: 207-442-7200
- Corporate URL: www.fireriskmgt.com
- Estimated Number of Employees: 13
- Estimated Annual Receipts: $983,000
- Business Start Date: 1998
- Contact Person: W. Mark Cummings
- Contact Phone: 207-442-7200
- Contact Email: wmark@fireriskmgt.com
- Business Structure:
- Other
- Business Type:
- For Profit Organization
- Veteran Owned Business
- Subchapter S Corporation
- Industries Served: Engineering Services, Building Inspection Services, Testing Laboratories, Industrial Design Services, Other Scientific and Technical Consulting Services, All Other Professional, Scientific, and Technical Services, Facilities Support Services, Investigation Services
- Product Areas: R&D-OTHER R & D-ENG DEV, R&D- OTHER RESEARCH AND DEVELOPMENT (ENGINEERING DEVELOPMENT), ARCHITECT AND ENGINEERING- GENERAL: MANAGEMENT ENGINEERING, A&E MANAGEMENT ENGINEERING SERVICES, A/E PROD ENG SVCS (INCL DESIGN-CONT, ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING, ARCHITECT AND ENGINEERING- GENERAL: OTHER, OTHER ARCHITECTS & ENGIN GEN
Sampling of Federal Government Funding Actions/Set Asides
In order by amount of set aside monies.
- $4,544 - Tuesday the 28th of February 2012
Public Buildings Service
WPHCA - THE AGGREGATED O&M CONTRACTS BRANCH
THE CONTRACTOR SHALL FURNISH A FIRE PROTECTION ENGINEER WHO WILL WORK FOR THE SAFETY, ENVIRONMENT AND FIRE PROTECTION BRANCH AT THE JW POWELL BUILDING TO WITNESS AN EVENING ACCEPTANCE TEST OF FIRE ALARM DEVICES INSTALLED IN THE DEPARTMENT OF DEFENSE SPACE. THE REVIEWS AND/OR EVALUATIONS WILL REQUIRE HIGH QUALITY PROFESSIONAL AND TECHNICAL ANALYSIS AND ADVICE CONSISTENT WITH GSA FIRE SAFETY CRITERIA, GSA SPECIFICATIONS AND GUIDELINES, AND NATIONAL FIRE PROTECTION ASSOCIATION PUBLICATIONS AND THE INTERNATIONAL BUILDING CODE. PERIOD OF PERFORMANCE: FEBRUARY 27, 2012 TO APRIL 25, 2012 - $2,520 - Friday the 11th of May 2012
Public Buildings Service
WPHCA - THE AGGREGATED O&M CONTRACTS BRANCH
TO PROVIDE FINAL ACCEPTANCE TESTING FOR THE PHASE 3 TEMPORARY SWING SPACE FIRE ALARM SYSTEM AT THE EISENHOWER EXECUTIVE OFFICE BUILDING (EEOB). THE EEOB HAS SIX ABOVE GRADE FLOORS AND ONE BELOW GRADE LEVEL. THE TESTING WILL CONSIST OF TESTING ALL FLOW SWITCHES IN THE BASEMENT LEVEL, TESTING APPROXIMATELY 5 NEW HEAT DETECTORS, TESTING NEW ELEVATOR PANELS, AUDIBILITY TESTING IN SEVERAL SUITES AND CONFIDENCE TESTING. - $19,500 - Thursday the 23rd of August 2012
Public Buildings Service
WPHBC - EAST REPAIR&ALTERATIONS CONTRACTS BRANCH
PRFESSIONAL ENGINEERING SERVICES DESIGN PRELIMINARY DESIGN - $1,000 - Monday the 13th of August 2012
Public Buildings Service
WPHC - THE BUILDINGS SERVICES DIVISION
CONTRACT GS-11P-11-YA-D-0038FRM IS HEREBY MODIFIED TO EXERCISE OPTION I, EFFECTIVE OCTOBER 09, 2012 THROUGH OCTOBER 09, 2013.
© Copyright 2019
The Collier Report published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources.
No reliance should be made by readers or Collier Report subscribers.
Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances.
Requests for the modification of displayed information may be made to help.desk@1918.media.