The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Flynco Inc

  • Contact Person: David Beggs
  • Contact Phone: 501-565-1228
  • Contact Email: dbeggs@flynco.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Industries Served: Industrial Building Construction, Commercial and Institutional Building Construction
  • Product Areas: SPECIAL STUDIES/ANALYSIS- SCIENTIFIC DATA, SCIENTIFIC DATA STUDIES, TECHNOLOGY STUDIES, SPECIAL STUDIES/ANALYSIS- TECHNOLOGY, OTHER SPECIAL STUDIES AND ANALYSES, SPECIAL STUDIES/ANALYSIS- OTHER, MAINT-REP OF ELECT-ELCT EQ, MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS, MAINT/REPAIR/REBUILD OF EQUIPMENT- MISCELLANEOUS, MAINT-REP OF MISC EQ, MOD OF MISC EQ, MODIFICATION OF EQUIPMENT- MISCELLANEOUS, OTHER ED & TRNG SVCS, EDUCATION/TRAINING- OTHER

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $67,500 - Wednesday the 26th of September 2012
    Department Of Army
    W7MW USPFO ACTIVITY AR ARNG
    CONSTRUCT TWO BRIDGES AND RUNNING TRAIL
  • $57,600 - Saturday the 19th of May 2012
    Department Of Army
    W7MW USPFO ACTIVITY AR ARNG
    NKAK112207, B207 ROOF REPAIR
  • $5,746 - Tuesday the 15th of November 2011
    Agricultural Research Service
    USDA ARS FD 3K15
    BUILDING STABILIZATION, STUTTGART, ARKANSAS
  • $57,406 - Wednesday the 23rd of November 2011
    Department Of Army
    W072 ENDIST LOUISVILLE
    EQUITABLE ADJUSTMENTS: CASE 056 ADD DATA DROPS TO ROOMS 153, 167B AND 174; CASE 058 PROVIDE DUCT DETECTOR TO MAU-2 UNIT; CASE 060 PROVIDE 2 ADDITIONAL GROUNDING UNITS FOR ANTENNA; CASE 061 REPLACE ALL EXISTING UNDER FLOOR SLAB DATA CABLES, DESIGN/BUILD U.S. ARMED FORCES RESERVE CENTER, PINE BLUFF, AR
  • $47,925 - Wednesday the 11th of July 2012
    Department Of Army
    W7MW USPFO ACTIVITY AR ARNG
    BUILDING 118 WOMEN'S RESTROOM RENOVATION
  • $320,334 - Tuesday the 25th of September 2012
    Department Of Air Force
    FA4460 19 CONS LGC
    REPAIR REPLACE GROUND STATION SECONDARYS
  • $3,198 - Monday the 11th of June 2012
    Department Of Army
    W072 ENDIST LOUISVILLE
    CASE 067 EQUITABLE ADJUSTMENT FOR EXTENSION OF EXISTING POTS LINE FROM TELEPHONE ENTRY ROOM TO MECHANICAL ROOM, U.S. ARMED FORCES RESERVE CENTER, PINE BLUFF ARSENAL, WHITE HALL, AR
  • $2,165 - Wednesday the 23rd of November 2011
    Department Of Army
    W072 ENDIST LOUISVILLE
    CASE 001 EQUITABLE ADJUSTMENT FOR TIME AND COSTS INCURRED WITH EXTRA PRINTING DUE TO INCORRECT CDS FURINSHED; CASE 014 EQUITABLE CREDIT ADJUSTMENT FOR PROVIDING MANUAL TRANSFER SWITCH INSTEAD OF AN AUTOMATIC TRANSFER SWITCH TO THE SWITCHBOARD, DESIGN/BUILD U.S. ARMED FORCES RESERVE CENTER, PINE BLUFF, AR
  • $17,117 - Friday the 27th of April 2012
    Department Of Army
    W072 ENDIST LOUISVILLE
    CASE 064 EQUITABLE ADJUSTMENT FOR REMOVAL AND REPLACEMENT OF EXTERIOR DOORS PANIC HARDWARE TO NIGHT LATCH TYPE; CASE 065 EQUITABLE ADJUSTMENT FOR REMOVAL OF CURRENTLY INSTALLED AIR GRILLES AND REPLACEMENT WITH DAMPERED GRILLES, DESIGN/BUILD U.S. ARMED FORCES RESERVE CENTER, PINE BLUFF, AR
  • $162,500 - Sunday the 6th of May 2012
    Department Of Army
    W7MW USPFO ACTIVITY AR ARNG
    MINOR CONSTRUCTION B126

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.