The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

G2 Construction Inc dba G2 Construction

  • G2 Construction Inc dba G2 Construction

  • View government funding actions
  • Fairbanks, AK 997122225
  • Phone: 907-458-1087
  • Estimated Number of Employees: 50
  • Estimated Annual Receipts: $15,000,000
  • Business Start Date: 2001
  • Contact Person: Paul Gitschel
  • Contact Phone: 907-458-1087
  • Contact Email: pgitschel@g2const.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • Self Certified Small Disadvantaged Business
  • For Profit Organization
  • Veteran Owned Business
  • Service Disabled Veteran Owned Business
  • Industries Served: Commercial and Institutional Building Construction, Other Heavy and Civil Engineering Construction, Poured Concrete Foundation and Structure Contractors, Electrical Contractors and Other Wiring Installation Contractors, Plumbing, Heating, and Air-Conditioning Contractors, Finish Carpentry Contractors, Site Preparation Contractors, All Other Specialty Trade Contractors
  • Product Areas:

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $91,648 - Tuesday the 7th of August 2012
    Department Of Army
    W2SN ENDIST ALASKA
    CONSTRUCT FAC&SITE WORK, CI 10-1 ADDITIONAL POL CONTAMINATED SOIL (PART 1)
  • $6,747 - Tuesday the 24th of April 2012
    Department Of Army
    W2SN ENDIST ALASKA
    CONSTRUCT FAC&SITE WORK, CI 7-ADDED STRUCTURAL CONNECTION POINTS
  • $60,736 - Friday the 7th of September 2012
    Department Of Army
    W2SN ENDIST ALASKA
    CONSTRUCT FAC&SITE WORK, CHANGE ITEM NO. 13 (D1 REPLACED WITH RAP)
  • $60,736 - Monday the 10th of September 2012
    Department Of Army
    W2SN ENDIST ALASKA
    CONSTRUCT FAC&SITE WORK, CHANGE ITEM NO. 12 (COM CONDUIT)
  • $50,000 - Thursday the 10th of November 2011
    Department Of Army
    W2SN ENDIST ALASKA
    CONSTRUCT FAC&SITE WORK
  • $451 - Thursday the 16th of February 2012
    Department Of Army
    W2SN ENDIST ALASKA
    CONSTRUCT UAC STRUCTURES-CASE 5-2, TARGET INTERFACE INSPECTION, PART 2, FINAL. THIS IS A PART 2, FINAL OF A TWO PART MODIFICATION. SEE MODIFICATION P00006, PART 1, NTP, DATED NOVEMBER 21, 2011, SIGNED BY MR. NORMAN SAMS, ALTERNATE ADMNISTRATIVE CONTRACTING OFFICER, IN THE AMOUNT OF $2,500.00. THIS PART 2, FINAL IS BEING ISSUED IN THE AMUONT OF $451.00 FOR THE TOTAL NEGOTIATED AMOUNT OF $2,951.00 FOR CHANGE ITEM 5. THE SCOPE OF WORK REMAINS THE SAME AS SPECIFIED IN P00006.
  • $4,501 - Tuesday the 25th of September 2012
    Department Of Army
    W2SN ENDIST ALASKA
    CONSTRUCT FAC&SITE WORK, CHANGE ITEM 14-2 NO2-PART 2
  • $3,580 - Friday the 4th of November 2011
    Department Of Army
    W2SN ENDIST ALASKA
    EXERCISE OPTION 1 (CLIN 0002) REMOVE&STOCKPILE POL CONTAMINATED SOIL.
  • $32,220 - Friday the 16th of December 2011
    Department Of Army
    W2SN ENDIST ALASKA
    CONSTRUCT FAC&SITE WORK
  • $28,627 - Thursday the 27th of September 2012
    Department Of Army
    W2SN ENDIST ALASKA
    REPLACE RAIL LINE - CASE 1, LOW-TEMP EQUIP FOR AVIATION FUEL SYSTEM. PROVIDE PLUG VALVES WITH LOW-TEMPERATURE STEEL (A-352 GR. LCC -50) BODIES AND BONNETS AND LOW-TEMPERATURE NITRILE SEALS. PROVIDE SIGHT FLOW INDICATORS WITH STAINLESS STEEL BODIES AND PTFE SEALS SUITABLE FOR LOW-TEMPERATURE OPERATIONS. PROVIDE LINE RELIEF (LR/DTR) ONLY ON THE PLUG VALVE WHICH ISOLATES THE SINGLE POINT ADAPTER, RELIEVING IN THE DIRECTION INDICATED FOR THE BODY CAVITY REIEF.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.