Gmr Triune
- View government funding actions
- Dallas, TX 75243
- Estimated Number of Employees: 25
- Estimated Annual Receipts: $13,000,000
Sampling of Federal Government Funding Actions/Set Asides
In order by amount of set aside monies.
- $3,350 - Wednesday the 2nd of May 2012
Department Of Army
W076 ENDIST LITTLE ROCK
A. SCOPE OF MODIFICATION: PROVIDE ALL LABOR, MATERIAL, EQUIPMENT AND SUPERVISION REQUIRED TO FURNISH AND INSTALL, COMPLETE WITH FINISHES, A HARD CEILING IN THE ELEVATOR EQUIPMENT ROOM 104 IN ORDER TO REDUCE THE CEILING HEIGHT FROM 23¿ ABOVE FINISHED FLOOR TO 12¿ ABOVE FINISHED FLOOR. THE WORK SHALL ALSO INCLUDE FOR THE FURNISHING AND INSTALLATION OF A 24¿ X 24¿ ACCESS PANEL, RELOCATING APPLICABLE LIGHT FIXTURES, MODIFICATIONS TO THE SUPPLY AND RETURN HVAC DUCT AS REQUIRED, AND MODIFICATIONS TO THE FIRE PROTECTION SPRINKLER SYSTEM AS REQUIRED. B. CHANGE IN CONTRACT SPECIFICATIONS: 1. REVISE CONTRACT SECTION 00010, SUPPLIES OR SERVICES AND PRICES/COST SCHEDULE AS FOLLOWS: ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT INCREASE 0001 MRI ADDITION 1 JOB LUMP SUM $3,350.00 TOTAL INCREASE THIS MODIFICATION $3,350.00 C. CHANGE IN CONTRACT DRAWINGS: SHOW ALL CHANGES ON AS-BUILT DRAWINGS. D. CHANGE IN CONTRACT PRICE: PURSUANT TO THE ABOVE, THE CURRENT CONTRACT AMOUNT IS INCREASED BY $3,350.00 FROM $4,581,424.00 TO A TOTAL NOT-TO-EXCEED AMOUNT OF $4,584,774.00, CONSIDERING MODIFICATION 01 THROUGH MODIFICATION 16 E. CHANGE IN CONTRACT TIME: PURSUANT TO THE ABOVE, THE CURRENT CONTRACT COMPLETION DATE OF MAY 4, 2012 REMAINS UNCHANGED CONSIDERING MODIFICATION 01 THROUGH MODIFICATION 16. F. CONTRACTOR¿S STATEMENT OF RELEASE: IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENTS FOR THE RESPONSE TO RFP NO. 17¿PROPOSAL FOR ADJUSTMENT¿, DATED APRIL 24, 2012, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY UNDER THIS CONTRACT FOR FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO THE¿PROPOSAL FOR ADJUSTMENT¿. (FAR 43.204) - $27,597 - Friday the 10th of July 2015
Department Of Army
W076 ENDIST LITTLE ROCK
MRI ADDITION - MODIFICATIONS A. SCOPE OF MODIFICATION: PROVIDE ALL LABOR, MATERIAL, EQUIPMENT AND SUPERVISION REQUIRED TO FURNISH AND INSTALL A CONCRETE RAMP/WALKWAY COMPLETE WITH GUARDRAILS/HANDRAILS AND APPROPRIATE GRADING REVISIONS AS INCLUDED IN CPR-09 DATED APRIL 5, 2012 IN ORDER TO PROVIDE AN EMERGENCY EXIT AT THE EXISTING DOOR AT THE SKYBRIDGE. THE FINISHING OF THE HANDRAILS IS TO BE EXTERIOR GRADE ALKYD SEMI-GLOSS PAINT OVER PRIMER. B. CHANGE IN CONTRACT SPECIFICATIONS: 1. REVISE CONTRACT SECTION 00010, SUPPLIES OR SERVICES AND PRICES/COST SCHEDULE AS FOLLOWS: ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT INCREASE 0001 MRI ADDITION 1 JOB LUMP SUM $27,597.00 TOTAL INCREASE THIS MODIFICATION $27,597.00 C. CHANGE IN CONTRACT DRAWINGS: REVISED SHEET C-401 AND SKA-405.1 AS ISSUED IN CPR-09, DATED APRIL 5, 2012, ARE INCLUDED IN THIS MODIFICATION. SHOW ALL CHANGES ON AS-BUILT DRAWINGS. D. CHANGE IN CONTRACT PRICE: PURSUANT TO THE ABOVE, THE CURRENT CONTRACT AMOUNT IS INCREASED BY $27,597.00 FROM $4,553,827.00 TO A TOTAL NOT-TO-EXCEED AMOUNT OF $4,581,424.00, CONSIDERING MODIFICATIONS 01 THROUGH 15 E. CHANGE IN CONTRACT TIME: PURSUANT TO THE ABOVE, THE CURRENT CONTRACT COMPLETION DATE OF APRIL 23, 2012 IS INCREASED BY ELEVEN (11) CALENDAR DAYS TO A REVISED COMPLETION DATE OF MAY 4, 2012 CONSIDERING MODIFICATIONS 01 THROUGH 15. F. CONTRACTOR S STATEMENT OF RELEASE: IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENTS FOR THE RESPONSE TO RFP NO. 16 PROPOSAL FOR ADJUSTMENT , DATED APRIL 11, 2012, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY UNDER THIS CONTRACT FOR FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO THE PROPOSAL FOR ADJUSTMENT . (FAR 43.204) - $2,295 - Tuesday the 12th of June 2012
Department Of Army
W076 ENDIST LITTLE ROCK
A. SCOPE OF MODIFICATION: THIS MODIFICATION SERVES AS THE COMPLETE AND FINAL SETTLEMENT OF TRIUNE¿S MAY 16, 2012 REQUEST FOR EQUITABLE ADJUSTMENT ASSOCIATED WITH ADDITIONAL LIGHT FIXTURES PER HDR¿S CPR-01 DATED MAY 7, 2010. B. CHANGE IN CONTRACT SPECIFICATIONS: 1. REVISE CONTRACT SECTION 00010, SUPPLIES OR SERVICES AND PRICES/COST SCHEDULE AS FOLLOWS: ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT INCREASE 0001 MRI ADDITION 1 JOB LUMP SUM $2,295.00 TOTAL INCREASE THIS MODIFICATION $2,295.00 C. CHANGE IN CONTRACT DRAWINGS: SHOW ALL CHANGES ON AS-BUILT DRAWINGS. D. CHANGE IN CONTRACT PRICE: PURSUANT TO THE ABOVE, THE CURRENT CONTRACT AMOUNT IS INCREASED BY $2,295.00 FROM $4,587,057.00 TO A TOTAL NOT-TO-EXCEED AMOUNT OF $4,589,352.00, CONSIDERING MODIFICATION 01 THROUGH MODIFICATION 18. E. CHANGE IN CONTRACT TIME: PURSUANT TO THE ABOVE, THE CURRENT CONTRACT COMPLETION DATE OF 08 JUNE 2012 REMAINS UNCHANGED CONSIDERING MODIFICATION 01 THROUGH MODIFICATION 18. F. CONTRACTOR¿S STATEMENT OF RELEASE: IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENTS FOR THE CONTRACTOR¿S MAY 16, 2012¿REQUEST FOR EQUITABLE ADJUSTMENT¿ FOR THE ADDITIONAL LIGHT FIXTURES ASSOCIATED WITH CPR-01, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY UNDER THIS CONTRACT FOR FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO THE¿PROPOSAL FOR ADJUSTMENT¿. (FAR 43.204) - $2,283 - Thursday the 31st of May 2012
Department Of Army
W076 ENDIST LITTLE ROCK
MRI ADDITION - MODIFICATIONS PROVIDE FOR AN EQUITABLE ADJUSTMENT TO THE CONTRACT FOR ALL TIME AND COST ASSOCIATED IN TO REPLACE A TOTAL OF FOUR (4) SHORT 90 DEGREE ELBOWS WITH A RADIUS¿SWEEP¿ ELBOWS¿ TWO (2) EACH ON TWO (2)¿ FOUR INCH (4¿) CONDUITS IN ACCORDANCE WITH THE PREVIOUSLY PROVIDED SKETCH SHOWING LOCATION OF THE TWO (2)¿ 4¿ CONDUITS, PURSUANT TO THE CONTRACTOR'S REQUEST FOR EQUITABLE ADJUSTMENT BY A LETTER DATED 4 MAY 2012 AS INDICATED HEREIN. - $190,854 - Monday the 5th of December 2011
Department Of Army
W076 ENDIST LITTLE ROCK
MRI ADDITION - MODIFICATIONS - $17,870 - Monday the 13th of February 2012
Department Of Army
W076 ENDIST LITTLE ROCK
MRI ADDITION - PROVIDE ALL LABOR, MATERIALS, AND SUPERVISION AS REQUIRED TO REMOVE TWO (2) STREETLIGHTS ADJACENT TO THE MRI PARKING LOT AND RELOCATE TWO (2) DOUBLE HEADED LIGHT STANDARDS INSIDE THE PARKING LOT TO ILLUMINATE BOTH THE STREET AND IMPROVE THE NEW PARKING AREA. THE WORK GENERALLY INCLUDES THE FOLLOWING: 1) REMOVE, RELOCATE AND RE-USE THE TWO (2) EXISTING POLES. 2) DEMO AND PROPERLY DISPOSE OF EXISTING LIGHT BASES AND REPAIR/REPLACE THE EXISTING SIDEWALKS INCLUDING JOINT SEALANTS. 3) INSTALL TWO (2) NEW BASES INCLUDING ANCHOR BOLTS PER DETAILS ON THE CONTRACT DRAWINGS AT 30¿ ABOVE THE FINISHED ELEVATION OF THE SURROUNDING AREAS. 4) PROVIDE NEW UNDERGROUND ELECTRICAL, TRENCHING, RACEWAY, WIRING AND TERMINATIONS AS REQUIRED. 5) THE BASES WILL BE SET NEAR THE BACKSIDE OF THE CURB AND GUTTER OF THE PARKING LOT IN GENERAL ACCORDANCE WITH THE CUT SHEET FROM E5R AND AS DIRECTED BY THE VA. 6) THE EXISTING SINGLE HEAD FIXTURES AND BULBS WILL BE REMOVED FROM THE POLES AND BE TURNED OVER TO THE VA AND IN TURN THE VA WILL PROVIDE DOUBLE- HEADED FIXTURES AND BULBS FOR REINSTALLATION. - $1,341 - Friday the 16th of March 2012
Department Of Army
W076 ENDIST LITTLE ROCK
MRI ADDITION - MODIFICATIONS PROVIDE ALL LABOR, MATERIAL, EQUIPMENT AND SUPERVISION REQUIRED TO FURNISH AND INSTALL IN-LINE SPLICER/REDUCER TO STEP DOWN UPS POWER FEEDER, SIZED AT #250MCM CONDUCTORS, TO #2/0 CONDUCTORS TO FIT THE TERMINATION LUGS PROVIDED IN THE OFCI UPS CABINET. THE IN-LINE SPLICER/REDUCER SHALL BE INSTALLED INSIDE THE UPS CABINET. SEE ATTACHMENTS INCLUDED WITH CPR-08 FROM HDR, DATED MARCH 11, 2012, FOR THE IN-LINE SPLICER/REDUCER CUT SHEETS AND #2/0 CONDUCTOR CUT SHEETS. COORDINATE INSTALLATION REQUIREMENTS WITH SIEMENS REPRESENTATIVE.
© Copyright 2019
The Collier Report published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources.
No reliance should be made by readers or Collier Report subscribers.
Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances.
Requests for the modification of displayed information may be made to help.desk@1918.media.