Hayes Seay Mattern & Mattern Inc
- View government funding actions
- Roanoke, VA 240111201
- Phone:
- Corporate URL: HTTP://WWW.AECOM.COM
- Estimated Number of Employees: 600
- Estimated Annual Receipts: $79,433,024
- Business Start Date: 1947
- Contact Person: Alyce Acosta
- Contact Phone: 512-454-4797
- Contact Email: AECOMELECTRONICBIZ@AECOM.COM
- Business Structure:
- Corporate Entity (Not Tax Exempt)
- Business Type:
- For Profit Organization
- Industries Served: Nursery and Tree Production, Forest Nurseries and Gathering of Forest Products, Drilling Oil and Gas Wells, Support Activities for Oil and Gas Operations, Support Activities for Coal Mining, Support Activities for Metal Mining, Support Activities for Nonmetallic Minerals (except Fuels) Mining, Water Supply and Irrigation Systems, Sewage Treatment Facilities, Residential Remodelers, Industrial Building Construction, Commercial and Institutional Building Construction, Water and Sewer Line and Related Structures Construction, Oil and Gas Pipeline and Related Structures Construction, Power and Communication Line and Related Structures Construction, Land Subdivision, Construction
- Product Areas: BUILDING COMPONENTS, PREFABRICATED, NONWOOD CONSTRUCT MATERIAL, NONWOOD CONSTRUCTION LUMBER AND RELATED MATERIALS, MISCELLANEOUS CONSTRUCTION MATERIALS, MISC CONTRUCT MATERIALS
Sampling of Federal Government Funding Actions/Set Asides
In order by amount of set aside monies.
- $50,551 - Thursday the 15th of November 2012
Department Of Army
W2V6 USA ENG SPT CTR HUNTSVIL
DESIGN SERVICES - $494,006 - Thursday the 26th of April 2012
Public Buildings Service
WPHBA - CAPITAL CONSTRUCTION BRANCH
THIS MODIFICATION IS TO EXTEND THE FULL-TIME CONSTRUCTION ADMINISTRATIVE SERVICES OF AECOM (MOD PS38) IN ASSOCIATION WITH WEST WING PHASE I CONSTRUCTION ONLY FOR 1 FULL-TIME CONSTRUCTION ADMINISTRATOR AND 1 FULL-TIME ASSISTANT AND A PM TO ATTEND TWO HOUR WEEKLY MEETINGS FOR TWO HUNDRED AND FORTY CALENDAR DAYS (240). THIS MODIFICATION INCLUDES A NEGOTIATED PRICE OF $261,119 FOR THE FULL-TIME CA, ASSISTANT FULL-TIME CA AND PM TO ATTEND WEEKLY MEETINGS, PLUS AN ALLOWANCE OF $232,887 FOR ADDITIONAL DISCIPLINE REVIEW TIME AND FOR A FIELD PROJECT MANAGER FOR A TOTAL OF $494,006. THIS CHANGE WILL EXTEND THE CONTRACT COMPLETION DATE BY FIFTY-FIVE (55) CALENDAR DAYS FROM JUNE 7, 2012 TO AUGUST 1, 2012. - $41,913 - Monday the 21st of November 2011
Public Buildings Service
WPHBA - CAPITAL CONSTRUCTION BRANCH
THE ADDITIONAL WORK OF PERFORMING INVESTIGATIVE SOILS BORINGS AT 2 LOCATIONS IN THE PROJECT AREA, WHICH INCLUDES BUT IS NOT LIMITED TO, PERFORMING LABORATORY TESTING AS REQUIRED TO INCLUDE MOISTURE DETERMINATION, GRAIN SIZE DISTRIBUTION, ATTERBERG LIMITS, SOIL IDENTIFICATION AND CLASSIFICATION; PREPARING A SOIL REPORT AND ENGINEERING ANALYSIS TO INCLUDE SITE DESCRIPTION, - $353,009 - Monday the 4th of June 2012
Department Of Army
W2V6 USA ENG SPT CTR HUNTSVIL
MASTER PLANNING - FT MEADE - $316,813 - Monday the 11th of June 2012
Department Of Army
W2V6 USA ENG SPT CTR HUNTSVIL
MASTER PLANNING - FT EUSTIS - $310,000 - Thursday the 21st of June 2012
Public Buildings Service
WPHBA - CAPITAL CONSTRUCTION BRANCH
THIS MODIFICATION IS TO PROVIDE DEMO PLANS AND NEW DESIGNS FOR AHUS, DUCTWORK, GARDEN WALL, WATERPROOFING, LANDSCAPING AND OTHER ASSOCIATED WORK. THIS SCOPE OF WORK INCLUDES INCORPORATING OPTION 2 TO RECONFIGURE THE DINING AND KITCHEN SPACES TO INCLUDE NEW LAYOUT, KITCHEN EQUIPMENT DESIGN, HVAC, WALL, CEILING AND FLOOR FINISHES IN ALL THREE DINING ROOMS AS WELL AS INCORPORATION OF THE NEW AIR BOUNDARY REQUIREMENTS (EXCLUSIVE OF THE KITCHEN PROPER) AND COORDINATING THE KITCHEN EQUIPMENT DESIGN, SELECTION, SIZING AND LAYOUT WITH THE DESIGN OF THE SWING SPACE KITCHEN LOCATED IN EEOB. THE A/E SHALL PREPARE DESIGN(S) AND MODIFICATIONS AS REQUIRED TO UTILIZE THE SOUTH COURT PLANT TO MAKE UP THE APPROXIMATE 130 TON DEFICIT IN CHILLED WATER CAPACITY AS SHOWN ON THE ATTACHED CE102 DATED 4/24/12 FOR THE NOT TO EXCEED SUM OF $310,000.00. - $2,000,000 - Thursday the 5th of January 2012
Public Buildings Service
WPHBA - CAPITAL CONSTRUCTION BRANCH
THIS MOD IS FOR ADDITIONAL WORK FOR OPTION 1A ON WW. - $189,899 - Tuesday the 6th of November 2012
Department Of Army
W072 ENDIST DETROIT
TAS::96 3122::TAS DESIGN OF VORTEX GRIT TANK #2 FOR THE GENESEE COUNTY DRAIN COMMISSIONERS OFFICE, DIVISION OF WATER AND WASTE PARTIALLY FEDERALLY FUNDED - $1,500,000 - Monday the 7th of May 2012
Public Buildings Service
WPHBA - CAPITAL CONSTRUCTION BRANCH
THIS MODIFICATION SETTLES THE ATTACHED CE0100R1 DATED 7/21/11 FOR PERFORMING ADDITIONAL SERVICES FOR THE WEST WING PHASE II BASE DESIGN BASED ON LESSONS LEARNED FROM WEST WING PHASE I, WHICH INCLUDES BUT IS NOT LIMITED TO, INCORPORATING ADD'L REQUIREMENTS INTO THE BASE DESIGN: SEISMIC RESTRAINT DESIGN FOR MECH, ELEC., FIRE, LIFE SAFETY&IT/TELECOM; SUSTAINMENT OF ALL UTILITIES TO MAINTAIN THE PBR OPERATIONS AND SITUATION ROOM'S CONDITION; SUSTAINMENT OF AND MODIFICATIONS TO WT AND OTHER IT/TELECOM AND DATA MGMT SPACES, INCLUSIVE OF HVAC, POWER AND SECURITY SYSTEMS; AND EXTENSIVE NOISE, DUST AND VIBRATION MITIGATION MEASURES. INCLUDED IN THE BASE WORK IS TIME FOR ADD'L SURVEYS, GRAPHICS, PRESENTATIONS AND DESIGN ANALYSIS; A VE WORKSHOP; AND OTHER MEETINGS WITH PPD, TSD, OA, ETC. FOR THE TEMPORARY RE-ROUTING OF PROTECTEES, BADGE HOLDERS, VISITORS AND PRESS TO INCLUDE SCREENING, ADA ACCESS, SECURITY SYSTEMS AND OFFICER POSTS. IN ADDITION TO THE BASE DESIGN, THE FOLLOWING OPTIONS ARE EXERCISED: OPTION 1 RE-PROGRAM 2ND FL., OPTION 3 PREPARE PLANS IN BIM, INCLUDING CE0019 (ARCHITECTURAL PORTION ONLY), OPTION 4 INVENTORY EXISTING IT, TELECOM, SECURITY, COMPUTERS, PRINTERS, ETC. / PROVIDE UPDATED INFRASTRUCTURE DESIGN, OPTION 5 SUSTAINMENT FOR EXISTING FEEDS SOUTH (ALLOWANCE) AND OPTION 6 DESIGN TO SUPPORT SCIF SUITES (ALLOWANCE). OPTIONS 5 AND 6 ARE AWARDED AS ALLOWANCES. OPTION 2 MAY BE AWARDED AT A LATER DATE SUBJECT TO AVAILABILITY OF FUNDS. OPTIONS 7&8 WERE NEITHER EXERCISED NOR NEGOTIATED. PROVIDE ALL ASSOCIATED WORK FOR OPTIONS 1, 3, 4, 5 AND 6 AS SPECIFIED IN CE0100R1. THERE IS NO CHANGE TO DELIVERABLE MILESTONES ASSOCIATED WITH THIS CHANGE. MILESTONES EXECUTED UNDER PC54 REMAIN IN EFFECT. THIS CHANGE TO THE BASE CONTRACT OPTION 3 WEST WING II DESIGN ONLY, INCLUSIVE OF LESSONS LEARNED AND OPTIONS AS DESCRIBED HEREIN, EXTENDS THE DESIGN SCHEDULE TO ONE YEAR. THEREFORE, THE PERIOD OF PERFORMANCE FOR WW2 DESIGN ONLY IS INCREASED FROM 300 CALENDAR DAYS TO 365 CALENDAR DAYS FOR A FINAL COMPLETION ON 8/11/12. AS A RESULT, THIS MODIFICATION ADJUSTS THE CURRENT CONTRACT COMPLETION DATE BY 10 CALENDAR DAYS FROM 8/1/12 TO 8/11/12. - $12,964 - Wednesday the 9th of November 2011
Public Buildings Service
WPHBA - CAPITAL CONSTRUCTION BRANCH
ADDITIONAL WORK OF PREPARING PLANS AND SPECS FOR THE INSTALLATION OF CONDUITS ALONG THE WEST SIDE OF WEST EXEC AVE.
© Copyright 2019
The Collier Report published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources.
No reliance should be made by readers or Collier Report subscribers.
Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances.
Requests for the modification of displayed information may be made to help.desk@1918.media.