Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $45,998 - Wednesday the 13th of June 2012
    Department Of Army
    W2SD ENDIST BALTIMORE
    NORTH CAMPUS ELECTRICAL UTILITY PLANT CHANGE AE-REF00003, EXISTING REFUSE MATERIAL CONTRACTOR TO PROVIDE ALL LABOR, MATERIAL AND EQUIPMENT REQUIRED TO REMOVE AND DISPOSE OF EXISTING DEPOSITS OF SCRAP METAL, ASPHALT, CONCRETE, JERSEY BARRIERS, TIRES, OIL DRUMS AND OTHER REFUSE FOUND ON CONSTRUCTION SITE DURING PRELIMINARY EXCAVATION NOT INCLUDED IN BASIC CONTRACT DOCUMENTS AND NOT REMOVED BY AGENCY CONTRACTOR PRIOR TO COMMENCEMENT OF WORK IN AREA.
  • $37,000 - Wednesday the 12th of September 2012
    Department Of Army
    W2SD ENDIST BALTIMORE
    NORTH CAMPUS ELECTRICAL UTILITY PLANT AR LIGHTNING PROTECTION FOR FUEL TANKS CONTRACTOR TO PROVIDE ALL LABOR, MATERIAL AND EQUIPMENT TO INSTALL A MASTER UL LISTED LIGHTNING PROTECTION SYSTEM FOR THE 240,000 GALLON FUEL OIL TANKS. WORK SHALL INCLUDE INSTALLATION OF APPROXIMATELY 760LF OF #4/0 AWG BARE COPPER CONDUCTOR TIED TO THE NORTH SUBSTATION GROUND GRID, TRENCHING FOR SAME, 4 COPPER GROUND RODS AND EXOTHERMIC WELDING TO CONNECT TANKS TO GROUND GRID AS PER RESPONSE TO RFI #0105.
  • $29,129 - Thursday the 6th of September 2012
    Department Of Army
    W2SD ENDIST BALTIMORE
    NORTH CAMPUS ELECTRICAL UTILITY PLANT AL REDUCE GROUNDING CONDUCTOR REQUIREMENT CONTRACTOR TO PROVIDE CREDIT TO GOVERNMENT FOR REDUCING COPPER GROUND CONDUCTOR SIZE FROM 500KCMIL TO 4/0 IN DIAMETER AS PER RESPONSE TO RFI #0097. CE #0025 AT DAVIS-BACON WAGE DETERMINATION GOVERNMENT TO PROVIDE COMPENSATION TO CONTRACTOR FOR INCREASED COSTS INCURRED DUE TO DAVIS-BACON WAGE RATE CHANGE. CONTRACTOR HOURS IN AFFECTED TRADES WILL BE MULTIPLIED BY THE WAGE RATE DIFFERENCE. WAGE DETERMINATION MD100133 DATED AUGUST 26, 2011 WILL BE USED FOR THE DURATION OF THIS CONTRACT.
  • $2,378,651 - Wednesday the 12th of September 2012
    Department Of Army
    W2SD ENDIST BALTIMORE
    NORTH CAMPUS ELECTRICAL UTILITY PLANT FIELD CHANGE AG1 REF00007 - BULLETIN #3-UPGRADE ELECTRICAL CONTRACTOR TO PROVIDE ALL LABOR, MATERIAL AND EQUIPMENT REQUIRED TO PLACE FOUR (4) NEW ELECTRICAL MANHOLES; ADD ONE (1) ADDITIONAL CONCRETE ENCASED ELECTRICAL DUCTBANK CROSSING CONNECTOR RD; UPSIZE ALL 15KV CABLE FROM 500KCMIL TO 750KCMIL AND ADD ANY ADDITIONAL COMPONENTS AND INFRASTRUCTURE NECESSARY TO ACCOMODATE UPSIZED CABLES IN NORTH CAMPUS GENERATOR BUILDING AS PER BULLETIN #3 ISSUED FEBRUARY 13, 2012.
  • $196,048 - Friday the 20th of July 2012
    Department Of Army
    W2SD ENDIST BALTIMORE
    NORTH CAMPUS ELECTRICAL UTILITY PLANT AF STAINLESS STEEL TANKS CONTRACTOR TO PROVIDE ALL LABOR, MATERIAL AND EQUIPMENT TO DELIVER, FABRICATE AND INSTALL SIMILAR QUANTITIES OF TYPE 304 STAINLESS STEEL IN LIEU OF A36 CARBON STEEL REQUIRED FOR CONSTRUCTION OF TWO 240,000 GALLON FUEL TANKS. WORK SHALL INCLUDE CLEANING AND POLISHING OF STAINLESS STEEL EXTERIOR SURFACES. INTERIOR AND EXTERIOR PROTECTIVE COATINGS REQUIRED FOR CARBON STEEL SHALL BE DELETED. ALL OTHER LABOR, MATERIALS AND EQUIPMENT RELATED TO STORAGE TANKS REMAINS UNCHANGED FROM BASE CONTRACT.
  • $18,400 - Tuesday the 18th of September 2012
    Department Of Army
    W2SD ENDIST BALTIMORE
    NORTH CAMPUS ELECTRICAL UTILITY PLANT AS ADDITIONAL FIRE ALARM REQUIREMENTS CONTRACTOR TO PROVIDE ALL LABOR, MATERIAL AND EQUIPMENT TO INSTALL, PROGRAM AND TEST 18 ADDITIONAL HEAT DETECTORS NEEDED FOR SUBSTATION VAULT FIRE ALARM SYSTEM TO BE FIRE CODE COMPLIANT AS PER RESPONSE TO RFI #0111.
  • $1,772 - Tuesday the 1st of May 2012
    Department Of Army
    W2SD ENDIST BALTIMORE
    NORTH CAMPUS ELECTRICAL UTILITY PLANT AB PARTNERING SESSION #1 PROVIDE COMPENSATION TO CONTRACTOR FOR 50% OF ALL COSTS INCURRED FOR FACILITATOR AND VENUE USED IN PARTNERING SESSION CONSISTING OF REPRESENTATIVES OF ALL INVOLVED STAKEHOLDERS AND AGENCIES AS PER CONTRACT SPECIFICATIONS. COSTS OF INDIVIDUAL ATTENDEES TO BE BORNE BY THEIR EMPLOYER.
  • $169,439 - Wednesday the 19th of September 2012
    Department Of Army
    W2SD ENDIST BALTIMORE
    NORTH CAMPUS ELECTRICAL UTILITY PLANT AJ ADDITIONAL REQUIREMENTS FOR PTS CONTRACTOR TO PROVIDE ALL LABOR, MATERIAL AND EQUIPMENT TO INSTALL POTENTIAL TRANSFORMERS (PTS) IN ALL 13.8KV SWITCHGEAR THAT MEET THE FOLLOWING REQUIREMENTS FOR THE PARALLELING SWITCHGEAR AND THE SUBSTATION IN LIEU OF PTS SHOWN ON BASE CONTRACT DOCUMENTS: 1.SURGE SHIELDING TO PROTECT AGAINST TRANSIENTS AND OVER-VOLTAGE CONDITIONS. 2.ADDITION OF 100W HEATERS SHALL BE INCLUDED TO ENSURE SUFFICIENT LOADING. 3.1.25 RATED VOLTAGE FACTOR 4.PROVIDE MITIGATION EQUIPMENT TO PROTECT AGAINST TRANSIENT AND OVER-VOLTAGE ON THE LINE SIDE OF EACH BREAKER PAIR. 5.110 KV BIL 6.VOLTAGE IMPULSE TESTING (BIL) AND PARTIAL DISCHARGE (PD) TESTING (INCEPTION AND EXTINCTION) TO BE PERFORMED ON ALL UNITS. 7.TESTING SHALL BE PERFORMED IN ACCORDANCE WITH IEEE C57.13 AND CSA CAN 3-C13-M83. 8.SF6 TO BE USED IN THE ENCAPSULATION PROCESS TO FILL ANY VOIDS.
  • $15,300 - Monday the 17th of September 2012
    Department Of Army
    W2SD ENDIST BALTIMORE
    NORTH CAMPUS ELECTRICAL UTILITY PLANT AX PERIMETER 12X36 BEAM AT VAULT CONTRACTOR TO PROVIDE ALL LABOR, MATERIAL AND EQUIPMENT TO PLACE A 12"X36" REINFORCED CONCRETE BEAM AROUND THE PERIMETER OF THE VAULT TO ALLOW FOR TIE-IN WITH BEAMS DETAILED ON 1/S-029 AS PER RESPONSE TO RFI #0134.
  • $111,492 - Tuesday the 1st of May 2012
    Department Of Army
    W2SD ENDIST BALTIMORE
    NORTH CAMPUS ELECTRICAL UTILITY PLANT AC PERIMETER SECURITY FENCE-K12 ITEM 1. CONTRACTOR TO PROVIDE ALL LABOR, MATERIAL AND EQUIPMENT NECESSARY TO CHANGE BASE CONTRACT FENCE TO AMERISTAR K12 FENCEPOSTS, CHAIN LINK MESH, FENCE ACCESSORIES AND BARBED WIRE WITH BLACK VINYL COATING AS PER AGENCY SECURITY REQUIREMENTS. ONLY BARBS WILL REMAIN AS EXPOSED GALVANIZED STEEL. CE #0006 ITEM 2. CONTRACTOR TO PROVIDE ALL LABOR, MATERIAL AND EQUIPMENT TO INSTALL ADDITIONAL FE-7 TYPE FENCE AT VCP 2 REJECTION LANE AT CONNECTOR ROAD INTERSECTION TO SECURE AREA FROM OUTSIDE AUTO AND FOOT TRAFFIC. CE #00010 RFI #0040.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.