Hensel Phelps Construction Co
- View government funding actions
- Irvine, CA 926121598
- Phone: 949-852-0111
- Estimated Number of Employees: 2,940
- Estimated Annual Receipts: $2,318,891,008
- Business Start Date: 1937
- Contact Person: Mike Verrastro
- Contact Phone: 949-952-0111
- Contact Email: MVERRASTRO@HENSELPHELPS.COM
- Business Structure:
- Corporate Entity (Not Tax Exempt)
- Business Type:
- For Profit Organization
- Industries Served: New Single-Family Housing Construction (except For-Sale Builders), New Multifamily Housing Construction (except For-Sale Builders), Industrial Building Construction, Commercial and Institutional Building Construction, Water and Sewer Line and Related Structures Construction, Other Heavy and Civil Engineering Construction
- Product Areas: OTHER PROFESSIONAL SERVICES, SUPPORT- PROFESSIONAL: OTHER, OTHER ED & TRNG SVCS, EDUCATION/TRAINING- OTHER
Sampling of Federal Government Funding Actions/Set Asides
In order by amount of set aside monies.
- $96,636 - Thursday the 8th of November 2012
Public Buildings Service
DESIGN AND CONSTRUCTION DIVISION
NTE FOR HEATING HOT WATER PUMP REVISIONS - $95,000 - Thursday the 16th of February 2012
Public Buildings Service
DESIGN AND CONSTRUCTION DIVISION
THIS NOT-TO-EXCEED (NTE) UNILATERAL MODIFICATION IS ISSUED TO PROVIDE THE REQUIRED LABOR, MATERIAL, AND EQUIPMENT TO INSTALL A NEW STORM DRAIN SYSTEM IN THE INTERNATIONAL BOUNDARY AND WATER COMMISSION (IBWC) AREA AND THE AGENCY PARKING LOT NEXT TO THE HISTORIC CUSTOMS HOUSE. THIS SCOPE OF THE WORK IS DETAILED IN ARCHITECTURAL SUPPLEMENTAL INSTRUCTION (ASI) #021, DATED FEBRUARY 8, 2012, SPECIFICALLY FOR THE NEW SOUTHBOUND PEDESTRIAN CROSSING ON THE EAST SIDE OF THE PORT. THIS WORK IS IN SUPPORT OF THE EXPANSION&RECONFIGURATION PROJECT, PHASE 1B AT THE SAN YSIDRO LAND PORT OF ENTRY (LPOE) IN SAN DIEGO, CA. THIS NOT-TO-EXCEED (NTE) MODIFICATION IS IN THE AMOUNT OF $95,000.00. THE GSA WILL DEFINITIZE THIS WITH A BILATERAL MODIFICATION AT A DATE TO BE DETERMINED LATER. TOTAL CONTRACT AMOUNT INCLUDING THIS MODIFICATION: $168,022,095.00 - $95,000 - Monday the 6th of February 2012
Public Buildings Service
DESIGN AND CONSTRUCTION DIVISION
THIS NOT-TO-EXCEED (NTE) UNILATERAL MODIFICATION IS ISSUED TO PROVIDE THE REQUIRED LABOR, MATERIAL, AND EQUIPMENT TO INSTALL THE NORTH SHORING WALL REVISIONS IDENTIFIED IN ARCHITECTURAL SUPPLEMENTAL INSTRUCTION (ASI) 4.1 SPECIFICALLY FOR THE NEW SOUTHBOUND PEDESTRIAN CROSSING ON THE EAST SIDE OF THE PORT. THIS IS IN SUPPORT OF THE EXPANSION&RECONFIGURATION PROJECT, PHASE 1B AT THE SAN YSIDRO LAND PORT OF ENTRY (LPOE) IN SAN DIEGO, CA. THIS NOT-TO-EXCEED (NTE) MODIFICATION IS IN THE AMOUNT OF $95,000.00. THE GSA WILL DEFINITIZE THIS WITH A BILATERAL MODIFICATION AT A DATE TO BE DETERMINED LATER. TOTAL CONTRACT AMOUNT INCLUDING THIS MODIFICATION: $167,927,095.00 - $93,950 - Thursday the 26th of January 2012
Public Buildings Service
DESIGN AND CONSTRUCTION DIVISION
THIS MODIFICATION IS BEING ISSUED TO HAVE THE CONTRACTOR PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT NECESSARY TO PERFORM PREVENTIVE MAINTENANCE AND EMERGENCY SERVICES FOR THE EXISTING AND TEMPORARY PORT RUNNER SYSTEMS FROM 04/01/2011 THROUGH 03/31/2012. THIS INCLUDES FOUR(4) HOUR EMERGNECY RESPONSE TIME, MONTHLY REPORTS, AND ALL ROUTINE MAINTENANCE. THIS IS IN SUPPORT OF THE EXPANSION&RECONFIGURATION PROJECT, PHASE 1B AT THE SAN YSIDRO LAND PORT OF ENTRY IN SAN DIEGO, CA. THIS MODIFICATION IS IN THE AMOUNT OF $93,950.00. IN CONSIDERATION OF THIS MODIFICATION AGREED TO HEREIN AS A COMPLETE AND EQUITABLE ADJUSTMENT OF BOTH COST AND TIME FOR THE WORK INCORPORATED IN THIS CHANGE, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY FURTHER LIABILITY UNDER THIS CONTRACT FOR ANY ADDITIONAL EQUITABLE ADJUSTMENT ATTRIBUTABLE TO THE CIRCUMSTANCES GIVING RISE TO THIS MODIFICATION. TOTAL CONTRACT AMOUNT INCLUDING THIS MODIFICATION: $167,483,085.00 - $9,187 - Thursday the 8th of November 2012
Public Buildings Service
DESIGN AND CONSTRUCTION DIVISION
THIS MODIFICATION IS BEING ISSUED TO REMOVE AND REALIGN EXISTING SECURITY AND LIFE SAFETY SERVICES PER RFP 107 IN THE EDWARD J SCHWARTZ FEDERAL COURTHOUSE TO ACCOMMODATE DEMOLITION REQUIRED FOR THE NEW ENTRY LOBBY CONSTRUCTION TO CONNECT TO THE NEW SAN DIEGO FEDERAL COURTHOUSE LOCATED IN SAN DIEGO, CA. - $90,364 - Thursday the 8th of November 2012
Public Buildings Service
DESIGN AND CONSTRUCTION DIVISION
THIS MODIFICATION IS ISSUED TO DEFINITIZE PC72 - $90,000 - Thursday the 8th of November 2012
Public Buildings Service
DESIGN AND CONSTRUCTION DIVISION
CARPET TILE CHANGE FOR THE UNITED STATES DISTRICT COURTS - $88,673 - Monday the 26th of March 2012
Department Of Navy
NAVFAC SOUTHWEST
P143 BERKLEY ROAD REALIGNMENT - $88,625 - Thursday the 27th of September 2012
Department Of Navy
NAVFAC SOUTHWEST
P-573 INTER. MAINT. ACTIVITY FACILITY - $87,835 - Monday the 3rd of December 2012
Public Buildings Service
DESIGN AND CONSTRUCTION DIVISION
CLOSELY ASSOCIATED THIS BILATERAL MODIFICATION IS ISSUED TO PROVIDE ALL OF THE REQUIRED LABOR, MATERIAL, AND EQUIPMENT TO MODIFY THE INFRASTRUCTURE FOR AND RELOCATE THE EXISTING STADIUM SITE LIGHTING IN THE PRE-PRIMARY INSPECTION AREA OF THE PORT. THIS WILL PROVIDE ADDITIONAL LIGHTING FOR OFFICER SAFETY AND SECURITY DURING VEHICLE INSPECTION OPERATIONS. THIS SCOPE OF THE WORK IS DETAILED IN ARCHITECTURAL SUPPLEMENTAL INSTRUCTION (ASI) #027. THIS WORK IS IN SUPPORT OF THE EXPANSION&RECONFIGURATION PROJECT, PHASE 1B AT THE SAN YSIDRO LAND PORT OF ENTRY (LPOE) IN SAN DIEGO, CA. THIS BILATERAL MODIFICATION IS IN THE AMOUNT OF $87,835.00 (INCLUDING $79,957.00 AS ESTIMATED COST OF WORK AND $7,878.00 AS FEE). NO TIME EXTENSION IS GRANTED. IN CONSIDERATION OF THIS MODIFICATION AGREED TO HEREIN AS A COMPLETE AND EQUITABLE ADJUSTMENT OF BOTH COST AND TIME FOR THE WORK INCORPORATED IN THIS CHANGE PERTAINING TO THE NEW SD SYSTEM IN THE AGENCY PARKING LOT, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY FURTHER LIABILITY UNDER THIS CONTRACT FOR ANY ADDITIONAL EQUITABLE ADJUSTMENT ATTRIBUTABLE TO THE CIRCUMSTANCES GIVING RISE TO THIS MODIFICATION. TOTAL CONTRACT AMOUNT INCLUDING THIS MODIFICATION: $169,392,175.00
© Copyright 2019
The Collier Report published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources.
No reliance should be made by readers or Collier Report subscribers.
Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances.
Requests for the modification of displayed information may be made to help.desk@1918.media.