Hugo Alonso Inc as Alonso Construction
- View government funding actions
- Chula Vista, CA 919113912
- Estimated Number of Employees: 50
- Estimated Annual Receipts: $22,641,373
Sampling of Federal Government Funding Actions/Set Asides
In order by amount of set aside monies.
- $9,812 - Saturday the 29th of September 2012
Department Of Navy
NAVFAC SOUTHWEST
JOB ORDER CONTRACT NAICS 236220 - $97,319 - Thursday the 29th of December 2011
Department Of Navy
NAVFAC SOUTHWEST
EXTEND FENCING ALONG STUART MESA ROAD NEXT TO EDISON RANGE. - $77,885 - Wednesday the 26th of September 2012
Department Of Navy
NAVFAC SOUTHWEST
JOB ORDER CONTRACT NAICS 236220 - $77,682 - Friday the 28th of September 2012
Department Of Navy
NAVFAC SOUTHWEST
JOB ORDER CONTRACT NAICS 236220 - $7,232 - Friday the 4th of November 2011
Department Of Navy
NAVFAC SOUTHWEST
REPAIR FENCE AT UMA LOT IN THE 43 AREA - $60,864 - Thursday the 15th of November 2012
Public Buildings Service
SAN DIEGO SERVICE CENTER, SAN DIEGO FIELD OFFICE
REMODEL TSA LEASED OFFICES AT VARIOUS LOCATIONS AT SAN DIEGO INTERNATIONAL AIRPORT - $5,758 - Tuesday the 18th of October 2011
Public Buildings Service
SAN DIEGO SERVICE CENTER, SAN DIEGO FIELD OFFICE
THIS MODIFICATION FOR DELIVERY ORDER NUMBER GS-P-09-11-WN-5018 IS BEING ISSUED TO INCREASE FROM $114,147.00 TO $119,905.00; AN INCREASE OF $5,758.00, TO 1) INSTALL ADDITIONAL SOUND INSULATION IN THE WALKER DUCT BELOW THE FLOOR, 2) INSTALL ADDITIONAL INSULATION ABOVE THE ACOUSTICAL CEILING, 3) INSTALL ADDITIONAL SOUND DEADENING BOARD AROUND THE PERIMETER OF THE ENTRY DOOR, FINISH AND PAINT TO MATCH EXISTING, 4) REMOVE/INSULATE/RE-INSTALL HARDWARE, AND 5) INSULATE INTERIOR SIDE OF ENTRY DOOR. - $5,604 - Wednesday the 7th of December 2011
Department Of Navy
NAVFAC SOUTHWEST
REPAIR PERIMETER FENCE AT DE LUZ ROAD FALLBROOK - $51,618 - Monday the 24th of September 2012
Department Of Navy
NAVFAC SOUTHWEST
JOB ORDER CONTRACT NAICS 236220 - $4,996 - Wednesday the 9th of May 2012
Public Buildings Service
SAN DIEGO SERVICE CENTER, SAN DIEGO FIELD OFFICE
PROVIDE ALL LABOR, SUPERVISION, MATERIALS, AND EQUIPMENT NECESSARY TO SOUNDPROOF OFFICE #27, SPECIFICALLY: 1) TEMPORARILY REMOVE T-BAR CEILING IN OFFICE, 2) RAISE WALL FRAMING AND GYPSUM DRYWALL 2' ABOVE EXISTING T-BAR CEILING HEIGHT, 3) INSTALL INSULATION ABOVE THE ACOUSTICAL CEILING ON BOTH SIDES OF THE OFFICE SIDE WALLS THAT ARE ADJACENT TO OTHER OFFICES, 4) REINSTALL T-BAR CEILING IN OFFICE AND INSTALL SOUND DEADENING ACOUSTICAL TILES, 5) INSTALL A DOOR SEAL AND THRESHOLD, AND 6) REMOVE AND REINSTALL VERTICAL BLINDS ON THE 6TH FLOOR IN THE USAO OFFICES AT 880 FRONT STREET, SAN DIEGO CA 92101 PER ATTACHED SCOPE OF WORK.
© Copyright 2019
The Collier Report published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources.
No reliance should be made by readers or Collier Report subscribers.
Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances.
Requests for the modification of displayed information may be made to help.desk@1918.media.