The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Insulation N Coatings Inc dba Force Enterprise

  • Contact Person: Wesley Kroh
  • Contact Phone: 701-663-4422
  • Contact Email: wes@midconetwork.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • Self Certified Small Disadvantaged Business
  • For Profit Organization
  • Veteran Owned Business
  • Service Disabled Veteran Owned Business
  • Subchapter S Corporation
  • Industries Served: Residential Remodelers, Industrial Building Construction, Commercial and Institutional Building Construction, Water and Sewer Line and Related Structures Construction, Power and Communication Line and Related Structures Construction, Highway, Street, and Bridge Construction, Other Heavy and Civil Engineering Construction, Poured Concrete Foundation and Structure Contractors, Other Foundation, Structure, and Building Exterior Contractors, All Other Specialty Trade Contractors, Other Services to Buildings and Dwellings
  • Product Areas: SOCIAL- CHAPLAIN, CHAPLAIN SERVICES

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $38,727 - Tuesday the 22nd of May 2012
    Department Of Army
    W07V ENDIST ST PAUL
    W912ES-10-C-0027 BRECKENRIDGE STAGE 2A; THIS MODIFICATION REPLACES THE REQUIREMENT TO PLACE STRAW MULCH WITH HYDROMULCH IN THE BOIS DE SIOUX GOLF COURSE (BDSGC).
  • $24,500 - Thursday the 6th of October 2011
    Department Of Army
    W07V ENDIST ST PAUL
    W912ES-10-C-0027 BRECKENRIDGE STAGE 2A; THIS MODIFICATION IS AN UNDEFINITIZED CHANGE TO PROCESS EXCESS STRIPPING/TOPSOIL FOUND BELOW THE SPECIFIED SIX (6) INCHES AS SHOWN ON THE CONTRACT DRAWINGS IN THE BOIS DE SIOUX GOLF COURSE (BDSGC) FROM APPROXIMATE STATIONS N 21+00 THROUGH N 56+00 AS FOLLOWS: - STORE THE EXCESS STRIPPING/TOPSOIL IN THE BDSGC IN AN AREA ADJACENT TO THE PROJECT WORK LIMITS AT APPROXIMATE STATION 40+00. - CONSUME THE NECESSARY QUANTITIES ON THE REMAINDER OF THE PROJECT TO THE EXTENT NECESSARY AND APPROPRIATE. - ADD A YET TO BE DETERMINED QUANTITY AS EXTRA DEPTH TOPSOIL ON SLOPES AND TOP OF THE LEVEE WITHIN THE BDSGC. - PROVIDE A SEEDED STOCKPILE FROM THE REMAINDER OF EXCESS TOPSOIL IN THE BDSGC IN AN AREA ADJACENT TO THE PROJECT WORK LIMITS AT APPROXIMATE STATION 40+00. - RESTORE THE REMAINDER OF THE TEMPORARY STOCKPILE AREA WITH FINAL GRADING AND SEEDING TO ORIGINAL GROUND ELEVATIONS AND CONDITIONS.
  • $21,986 - Wednesday the 15th of August 2012
    Department Of Army
    W07V ENDIST ST PAUL
    W912ES-10-C-0027 BRECKENRIDGE STAGE 2A; THIS CONTRACT IS MODIFIED TO 1) ADD GATES TO THE FENCES AT PUMP STATIONS #1, #2, #3, #5 AND #6; 2) CHANGE THE FENCING AT PUMP STATION #1 FROM STANDARD GALVANIZED TO PVC COATED GREEN; 3) ELIMINATE THE BARBED WIRE ON TOP THE FENCE AT PUMP STATION #1; 4) EXTEND THE CONTRACT BY 15 DAYS TO ALLOW FOR COMPLETION OF THE ADDITIONAL WORK.
  • $11,896 - Friday the 10th of August 2012
    Department Of Army
    W07V ENDIST ST PAUL
    W912ES-10-C-0027 BRECKENRIDGE STAGE 2A; THIS CONTRACT IS MODIFIED TO REPLACE CB-5 AND TO PUMP THE STORM SEWER IN ORDER TO COMPLETE THE MH REPLACEMENT; AND IT EXTENDS THE CONTRACT 32 DAYS TO 1 SEPTEMBER 2012.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.