The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

J E Novack Construction Co

  • J E Novack Construction Co

  • View government funding actions
  • Saint Louis, MO 631323249
  • Phone:
  • Estimated Number of Employees: 10
  • Estimated Annual Receipts: $7,000,000
  • Business Start Date: 1997
  • Contact Person: Neal Novack
  • Contact Phone: 314-567-6100
  • Contact Email: nnovack@jenovack.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Industries Served: Commercial and Institutional Building Construction, Roofing Contractors, Plumbing, Heating, and Air-Conditioning Contractors, Other Building Equipment Contractors, All Other Specialty Trade Contractors
  • Product Areas: CONSTRUCTION (BASIC), R&D- DEFENSE OTHER: CONSTRUCTION (BASIC RESEARCH)

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $9,615 - Friday the 10th of February 2012
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    MODIFICATION PS05 (P-5) ELEVATOR "P" INSTALLATION THOMAS F. EAGLETON COURTHOUSE 111 SOUTH 10TH STREET ST. LOUIS, MO 63102-1125 THIS MODIFICATION PS05 IS HEREBY EXECUTED TO PROVIDE FOR THE INSTALLATION OF 1/2 INCH THICK 6X6 STEEL PLATE SHIMS WHERE THE DISTANCE BETWEEN THE ELEVATOR SHAFT WALLS AND THE MAIN RAILS IS GREATER THAN THE Z BRACKETS 2 INCH EXPANDABLE TOLERANCE. NO TIME EXTENSION IS GRANTED WITH THIS MODIFICATION PS05.
  • $954,800 - Wednesday the 9th of April 2014
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    IGF::CL::IGF CLOSELY ASSOCIATED CONSTRUCTION PROJECT AWARD RAY FEDERAL BLDG. 1222 SPRUCE ST. ST. LOUIS, MO 63103-2818 CONTRACT GS-06P-12 -GZ-D-0011 CONSTRUCTION AWARD J.E. NOVACK CONSTRUCTION COMPANY FPS TENANT FIT-OUT (RMO00433) PERIOD OF PERFORMANCE: 141 CALENDAR DAYS FROM NTP
  • $84,693 - Friday the 13th of July 2012
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE STREET ST. LOUIS, MO 63103 WORK TO BE COMPLETED UNDER THIS MODIFICATION INCLUDES BUT IS NOT LIMITED TO: PROVIDE ALL WORK INCLUDED IN THE RENOVATION OF THE EXISTING 7TH FLOOR KITCHEN LOCATED AT COLUMN LINES G-15 TO A NEW ICE/ERO LAN ROOM.
  • $668 - Wednesday the 14th of March 2012
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    FEDERAL RECORDS CENTER 9700 PAGE AVE ST. LOUIS, MO 63132-1547 WORK TO BE COMPLETED UNDER THIS MODIFICATION INCLUDES BUT IS NOT LIMITED TO: REPLACE ALL PAPER TOWEL AND TOILET PAPER DISPENSERS AT TWO B1 TOILET ROOMS TO MATCH THOSE INTALLED BY OTHERS AT L4 AND L5.
  • $60,590 - Tuesday the 11th of September 2012
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    WORK UNDER THIS ACTION INCLUDES BUT IS NOT LIMITED TO: FURNISH AND INSTALL NEW 2 1/2" CWS/R ABOVE THE CEILING FROM RISERS NEAR COLUMN E-11 TO CRAC UNIT LOCATED NEAR COLUMN J-15.
  • $5,821 - Thursday the 24th of May 2012
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE STREET ST. LOUIS, MO 63103 WORK TO BE COMPLETED UNDER THIS MODIFICATION INCLUDES BUT IS NOT LIMITED TO: DEMOLITION OF ADDITIONAL DUCTWORK, CEILING TILES AND INSTALLATION OF NEW DUCTWORK AND CEILING TILES.
  • $5,655 - Tuesday the 23rd of October 2012
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE STREET ST. LOUIS, MO 63103 WORK TO BE COMPLETED UNDER THIS MODIFICATION INCLUDES BUT IS NOT LIMITED TO: INSTALL CHROME, RECESSED, QUICK RESPONSE, GLASS BULB SPRINKLER DEADS BASED ON A QUANTITY OF 16.
  • $54,500 - Wednesday the 9th of April 2014
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    IGF::OT::IGF - ICE-HSI CONSTRUCTION OF EVIDENCE ROOM 7.311 @ RAY FEDERAL BUILDING, 1222 SPRUCE STREET, ST. LOUIS, MO 63103.
  • $4,756 - Thursday the 23rd of August 2012
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    WORK TO BE COMPLETED UNDER THIS ACTION INCLUDES BUT IS NOT LIMITED TO: ADJUST CRAC UNITS 1 AND 2 TO MAINTAIN DHS REQUIREMENTS FOR HUMIDITY AND TEMPERATURE CONTROL, EXTEND THE DRYWALL TO THE CONCRETE DECK ABOVE THE EXISTING ELECTRICAL ROOM LOCATED AT COLUMN E-7 AND PROVIDE A CREDIT FOR THE REMOVAL OF THE ELECTRICAL ROUGH-IN AND RECEPTACLE.
  • $4,750 - Thursday the 22nd of December 2011
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    RUSH LIMBAUGH SR US COURTHOUSE 555 INDEPENDENCE ST. CAPE GIRARDEAU, MO 63703 PRICE IS THE DIFFERENCE FROM THE ORIGINAL GUARANTEED MAXIMUM PRICE TO THE MUTUALLY AGREED UPON FIRM FIXED PRICE OF $237,750.00. THE ADDITIONAL FUNDS WERE REQUIRED FOR ADDED JOISTS AND FRAMING.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.