Jkm General Contractors Llc

  • Jkm General Contractors Llc

  • View government funding actions
  • Anchorage, AK 995012821
  • Phone: 907-770-3880
  • Estimated Number of Employees: 20
  • Estimated Annual Receipts: $4,000,000
  • Business Start Date: 1999
  • Contact Person: Jorge Martinez
  • Contact Phone: 907-770-3880
  • Contact Email: jmartinez@jkmgcllc.com
  • Business Structure:
  • Partnership or Limited Liability Partnership
  • Business Type:
  • Minority Owned Business
  • Self Certified Small Disadvantaged Business
  • For Profit Organization
  • DOT Certified DBE
  • Limited Liability f
  • Hispanic American Owned
  • Industries Served: Commercial and Institutional Building Construction, Framing Contractors, Roofing Contractors, Siding Contractors, Other Foundation, Structure, and Building Exterior Contractors, Drywall and Insulation Contractors, Painting and Wall Covering Contractors, Flooring Contractors, Finish Carpentry Contractors, Other Building Finishing Contractors, Site Preparation Contractors, All Other Specialty Trade Contractors
  • Product Areas: MARINE LIFESAVING & DIVING EQ, MARINE LIFESAVING AND DIVING EQUIPMENT, SAFETY AND RESCUE EQUIPMENT, RAILROAD SIGNAL AND WARNING DEVICES, MISC ALARM, SIGNAL, SEC SYSTEMS, MISCELLANEOUS ALARM, SIGNAL, AND SECURITY DETECTION SYSTEMS

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $973 - Thursday the 20th of September 2012
    Department Of Air Force
    FA5000 673 CONS LGC
    BLDG 8378 ICE MAKER REPAIR
  • $7,476 - Tuesday the 18th of September 2012
    Department Of Air Force
    FA5000 673 CONS LGC
    BLDG 9431 CHAPEL 2 CARPET INSTALL
  • $7,248 - Wednesday the 15th of August 2012
    Public Buildings Service
    GSA/PBS
    REMODEL PM'S OFFICE HISTORIC FED ANCHORAGE, AK
  • $67,175 - Friday the 15th of June 2012
    Public Buildings Service
    GSA/PBS
    REMODEL FAA MAILROOM ANCHORAGE, AK
  • $645,401 - Monday the 2nd of April 2012
    Public Buildings Service
    GSA/PBS
    RESEAL JUNEAU FEDERAL BUILDING
  • $62,268 - Monday the 9th of July 2012
    Public Buildings Service
    GSA/PBS
    RESEAL OF JUNEAU FEDERAL BUILDING, JUNEAU, AK
  • $59,570 - Wednesday the 14th of March 2012
    Department Of Army
    W2SN ENDIST ALASKA
    FTW364 ADDITION TO ED FACILITY - CASE 1, FIRE ALARM SYSTEM REVISIONS. 1. REMOVE ALL CONNECTIONS FROM LIFE CENTER FIRE ALARM SYSTEM TO RELIGIOUS CENTER FIRE ALARM SYSTEM. RELAY MODULES IN THE RELIGIOUS CENTER AND SLC CIRCUITS TO THEM SHALL REMAIN IN PLACE. REMOVE PROGRAMMING ASSOCIATED WITH THESE FIRE ALARM SYSTEM INTERCONNECTIONS FROM BOTH FIRE ALARM PANELS AND FROM THE EXISTING MONACO TRANSCEIVER IN THE RELIGIOUS CENTER. 2. INSTALL A NEW SMOKE DETECTOR IN THE RELIGIOUS CENTER FIRE ALARM SYSTEM ON THE 116 CORRIDOR SIDE OF THE NEW DOOR TO NEW CORRIDOR 118. THIS DETECTOR SHALL RELEASE THE DOOR HOLD OPEN ON THE DOOR BETWEEN 116 AND 118. NOTE THAT THE DETECTOR IN CORRIDOR 116 SHALL ALSO RELEASE THIS DOOR. VERIFY THIS MODIFICATION OF THE EXISTING ALARM SYSTEM BY TESTING IT PLUS 10 PERCENT OF THE EXISTING DEVICES WITH THE CONTRACTING OFFICER'S REPRESENTATIVE AND THE FIRE DEPARTMENT REPRESENTATIVE. 3. PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR TO INSTALL A NEW MONACO BT-XF TRANSCEIVER TO TRANSMIT ALARM, SUPERVISORY AND TROUBLE SIGNALS FROM THE EXISTING FAMILY LIFE CENTER FIRE ALARM PANEL TO THE FORT WAINWRIGHT FIRE DEPARTMENT. THE CONTRACTOR SHALL VERIFY THE CORRECT INSTALLATION OF THE NEW TRANSCEIVER BY TESTING 10 PERCENT OF THE EXISTING DEVICES WITH THE CONTRACTING OFFICER'S REPRESENTATIVE AND THE FIRE DEPARTMENT REPRESENTATIVE. THE MINIMUM TRANSMISSION ZONES SHALL BE WATER FLOW (ALARM), SMOKE DETECTOR (ALARM), PULL STATION (ALARM), MNS ACTIVATION (SUPERVISORY), SPRINKLER TAMPER SWITCH (SUPERVISORY), GENERAL SUPERVISORY, GENERAL TROUBLE AND A SPARE ZONE INCLUDING NECESSARY RELAYS AND HARDWARE IN THE FIRE ALARM PANEL AND TRANSMITTER PANEL. 4. MOUNT THE TRANSMITTER ANTENNA ON THE GABLE END OF THE BUILDING (CLOSEST TO THE FIRE DEPARTMENT) WHERE THERE IS A PITCHED ROOF TO PREVENT DAMAGE FROM ICE BUILDUP. EACH ANTENNA SHALL BE MOUNTED A MINIMUM OF 6 INCHES ABOVE THE ROOF LINE AND MUST BE MOUNTED SECURELY (NUT AND BOLT) TO WITHSTAND THE WIND LOAD. MOUNTING THE BRACKET USING SCREWS THROUGH THE BUILDINGS METAL SKIN IS NOT ACCEPTABLE. THE CONTRACTOR IS RESPONSIBLE FOR CUTTING EACH ANTENNA TO ITS PROPER LENGTH IN ORDER TO MATCH THE FREQUENCY AND TRANSMIT CORRECTLY. EACH ANTENNA CABLE MUST HAVE A LIGHTNING ARRESTER INSTALLED INLINE, IN A WEATHERPROOF BOX. EACH ASSEMBLY MUST BE PROPERLY GROUNDED PER MANUFACTURER SPECIFICATIONS.
  • $593 - Tuesday the 14th of February 2012
    Public Buildings Service
    GSA/PBS
    ADDITIONAL WORK FOR JUDGE GLEASON'S OFFICE, NEW FEDERAL BLDG ANCHORAGE, AK
  • $5,653 - Thursday the 26th of April 2012
    Public Buildings Service
    GSA/PBS
    PAINT BOLLARDS NFB PKING LOT ANCHORAGE, AK
  • $5,438 - Tuesday the 21st of August 2012
    Public Buildings Service
    GSA/PBS
    SOUND SOAK&PAINT FOR HISTORIC FED BLDG, ANCHORAGE, AK

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.