The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Choate Construction Llc dba Choate Construction

  • Choate Construction Llc dba Choate Construction

  • View government funding actions
  • Hines, OR 977380000
  • Phone: 541-573-5116
  • Estimated Number of Employees: 5
  • Estimated Annual Receipts: $100,000
  • Business Start Date: 2000
  • Contact Person: John Choate
  • Contact Phone: 541-573-5116
  • Contact Email: choateconst@centurylink.net
  • Business Structure:
  • Partnership or Limited Liability Partnership
  • Business Type:
  • Self Certified Small Disadvantaged Business
  • For Profit Organization
  • Industries Served: Industrial Building Construction, Highway, Street, and Bridge Construction, Other Heavy and Civil Engineering Construction, Site Preparation Contractors, All Other Specialty Trade Contractors
  • Product Areas: ELECTRICAL AND ELECTRONIC ASSEMBLIES, BOARDS, CARDS, AND ASSOCIATED HARDWARE, ELE ASSEMB-BDS CARDS-ASSOC HARDWARE

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $89,915 - Wednesday the 13th of June 2012
    Forest Service
    MALHEUR NATIONAL FOREST
    LOWER COTTONWOOD CULVERT REPLACEMENT; MALHEUR NATIONAL FOREST
  • $750 - Tuesday the 21st of August 2012
    Forest Service
    MALHEUR NATIONAL FOREST
    LOWER COTTONWOOD CULVERT REPLACEMENT; MALHEUR NATIONAL FOREST---MOD 0001 IS TO COMPENSATE THE CONTRACTOR FOR RAISING THE STREAMBED 3/4 OF A FOOT RESULTING IN AN ADDITIONAL 30 CY OF STREAMBED SIMULATION MATERIAL DUE TO AN ERROR IN THE ORIGINAL DESIGN.
  • $72,866 - Wednesday the 30th of May 2012
    Forest Service
    MALHEUR NATIONAL FOREST
    SOUTH FORK JOHN DAY CULVERT REPLACEMENT
  • $3,450 - Wednesday the 8th of August 2012
    Forest Service
    MALHEUR NATIONAL FOREST
    SOUTH FORK JOHN DAY CULVERT REPLACEMENT---MOD 0001 IS TO INCORPORATE COMPACTION TESTING FOR BACKFILL
  • $15,946 - Thursday the 23rd of August 2012
    Forest Service
    MALHEUR NATIONAL FOREST
    LOWER COTTONWOOD CULVERT REPLACEMENT; MALHEUR NATIONAL FOREST---MOD 0001 IS TO COMPENSATE THE CONTRACTOR FOR RAISING THE STREAMBED 3/4 OF A FOOT RESULTING IN AN ADDITIONAL 30 CY OF STREAMBED SIMULATION MATERIAL DUE TO AN ERROR IN THE ORIGINAL DESIGN.---MOD 0002 DETAILS: ORIGINAL DESIGN HAD THE NEW CULVERT TOO SHORT TO SUPPORT THE REQUIRED FILL TO THE ELEVATION OF THE EXISTING ROAD. RESOLUTION INCLUDES THE ORDERING OF NEW PLATES FOR THE TOP HALF OF THE ENDS OF THE PIPE AND ADDITIONAL TIME FOR THE CONTRACTOR TO REMOVE THE OLD PLATES AND INSTALL THE NEW ONES. TWO WEEKS OF ADDITIONAL EXCAVATOR TIME ARE INCLUDED AS THE CONTRACTOR WILL BE ON STANDBY WHILE THESE PLATES ARE ORDERED. IN ADDITION, A PHONE LINE WAS NOT IDENTIFIED ON THE DRAWINGS AND THE LOCATION OF THE CULVERT IS NOT ONE WHERE THERE WOULD BE A REASONABLE EXPECTATION FOR THERE TO BE A PHONE LINE. THE CONTRACTOR WILL NEED TO DIG AN ADDITIONAL 300 FEET OF TRENCH AND IMPORT FILL TO BURY THE PHONE LINE WHICH WAS ADDED TO AND REROUTED BY THE PHONE COMPANY.
  • $15,410 - Thursday the 6th of September 2012
    Forest Service
    MALHEUR NATIONAL FOREST
    FALLS CG CULVERT REPLACEMENT TASK ORDER; MALHEUR NATIONAL FOREST---MOD 0001 CLARIFIES THAT IT IS A BOX CULVERT THAT WILL BE REQUIRED UNDER THIS CONTRACT AND NOT A BOTTOMLESS ARCH CULVERT. THE ORIGINAL CONTRACT USED CONFLICTING LANGUAGE AND RESULTED IN THE CONTRACTOR PROVIDING PRICING FOR A BOTTOMLESS ARCH CULVERT. THIS MODIFICATION ADDS IN THE NECESSARY FUNDING TO OBTAIN THE BOX CULVERT.
  • $104,950 - Tuesday the 25th of September 2012
    Forest Service
    MALHEUR NATIONAL FOREST
    SUNFLOWER FLATS CULVERT REPLACEMENT
  • $104,420 - Thursday the 30th of August 2012
    Forest Service
    MALHEUR NATIONAL FOREST
    FALLS CG CULVERT REPLACEMENT TASK ORDER; MALHEUR NATIONAL FOREST

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.