The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

K M Ng And Associates Inc

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $835,482 - Monday the 12th of March 2012
    Department Of Army
    W076 ENDIST FT WORTH
    REPAIR MAINTENANCE FACILITIES -- AE THE A-E SHALL PERFORM SITE INVESTIGATIONS AND DEVELOP FOUR DIFFERENT FULL CONSTRUCTION PACKAGES.
  • $56,391 - Monday the 12th of March 2012
    Department Of Army
    W076 ENDIST FT WORTH
    BLDG 4819&4820 INVESTIGATION THE A-E SHALL PERFORM SITE INVESTIGATIONS TO BUILDING 4819&4820 TO PROVIDE THE GOVERNMENT A STRUCTURAL, UTILITY AND HAZARD ANALYSIS ON THE BUILDING.
  • $556,274 - Monday the 12th of March 2012
    Department Of Army
    W076 ENDIST FT WORTH
    ADMIN BUILDING RENOVATIONS - AE SERVICES THE A-E SHALL PERFORM SITE INVESTIGATIONS AND DEVELOP THREE DIFFERENT FULL CONSTRUCTION PACKAGES.
  • $480,980 - Friday the 14th of September 2012
    Department Of Army
    W076 ENDIST FT WORTH
    WSMR ARC FLASH STUDY PROJECT NO.: 370225: ARC FLASH HAZARD ANALYSIS SHALL INCLUDE: A. DATA COLLECTION OF EACH OF THE FACILITY'S POWER DISTRIBUTION SYSTEMS INCLUDING THE ARRANGEMENT OF COMPONENTS ON A ONE-LINE DRAWING WITH NAMEPLATE SPECIFICATIONS OF EVERY DEVICE AND DETAILS OF THE LENGTHS AND CROSS SECTION AREA OF ALL CABLES. B. A SHORT CIRCUIT ANALYSIS WILL THEN BE PERFORMED AND THE RESULTING DATA FED INTO THE EQUATIONS DESCRIBED BY EITHER NFPA 70E-2000 OR IEEE STANDARD 1584-2002 TO PRODUCE THE NECESSARY FLASH PROTECTION BOUNDARY DISTANCES AND INCIDENT ENERGY TO DETERMINE THE MINIMUM PPE REQUIREMENT FOR EACH FACILITY.
  • $411,302 - Tuesday the 10th of July 2012
    Department Of Army
    W076 ENDIST FT WORTH
    AE- PREPARE 35% DESIGN BUILD PACKAGES FOR FY12 SRM
  • $377,686 - Tuesday the 15th of May 2012
    Department Of Army
    W076 ENDIST FT WORTH
    THIS TASK ORDER WILL INCLUDE PREPARATION OF TWELVE (12) DESIGN-BUILD (D-B) RFP PACKAGES AND OPTION FOR ONE (1) MORE PACKAGE. PARAMETERS SHALL BE INCLUDED THAT DESCRIBE PROJECT DEFINITION CHARACTERISTICS (E.G. SIZE, BUILDING TYPE, FOUNDATION TYPE, EXTERIOR CLOSURE MATERIAL, ROOF TYPE AND MATERIAL, NUMBER OF FLOORS, FUNCTIONAL SPACE REQUIREMENTS, INTERIOR UTILITY SYSTEM REQUIREMENTS/QUALITY OF FINISHES, EXTERIOR FEATURES/QUALITY OF FINISHES, UTILITIES, ETC.).
  • $35,754 - Wednesday the 29th of August 2012
    Department Of Army
    W076 ENDIST FT WORTH
    TOPOGRAPHICAL SURVEY
  • $33,448 - Wednesday the 29th of August 2012
    Department Of Army
    W076 ENDIST FT WORTH
    ADMIN BUILDING RENOVATIONS - AE SERVICES.THE A-E SHALL PERFORM SITE INVESTIGATIONS AND DEVELOP THREE DIFFERENT FULL CONSTRUCTION PACKAGES.
  • $28,580 - Wednesday the 29th of August 2012
    Department Of Army
    W076 ENDIST FT WORTH
    REPAIR MAINTENANCE FACILITIES -- AE. THE A-E SHALL PERFORM SITE INVESTIGATIONS AND DEVELOP FIVE DIFFERENT FULL CONSTRUCTION PACKAGES.
  • $204,653 - Monday the 17th of December 2012
    Department Of Army
    W076 ENDIST FT WORTH
    UEPH (216) TASK ORDER 29 JUNE 2012 THRU 26 SEPTEMBER 2013

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.