The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Kevin Furlong Construction

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $23,652 - Sunday the 2nd of September 2012
    National Park Service
    PWR REGIONAL CONTRACTING
    THE CONTRACTOR SHALL PROVIDE ALL LABOR, PARTS, MATERIALS AND EQUIPMENT AS NEEDED TO CONSTRUCT THE: CONTROLLED CATTLE CROSSINGS AT FOUR TRIBUTARIES RANDALL GULCH, NORTH HAGMAIER GULCH, SOUTH HAGMAIER GULCH AND EUCALYPTUS GULCH ON (R. GIACOMINI RANCH). THE CROSSINGS WILL BE INSTALLED BETWEEN TWO FENCE LINES ON EITHER SIDE OF EACH TRIBUTARY. EACH OF THE FOUR CROSSINGS WILL REQUIRE PINNING DOWN EROSION CONTROL FABRIC, ROCKING OVER FABRIC WITH FOUR INCH CLEAN ROCK, AND LAYING DOWN CLASS II PERMEABLE GRAVEL OVER THE ROCK, AT POINT REYES NATIONAL SEASHORE, MARIN COUNTY, CALIFORNIA.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.