The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Khdm Construction Llc

  • Contact Person: Willie Mccarty
  • Contact Phone: 334-488-4643
  • Contact Email: khdm@live.com
  • Business Structure:
  • Partnership or Limited Liability Partnership
  • Business Type:
  • Self Certified Small Disadvantaged Business
  • For Profit Organization
  • Economically Disadvantaged Women Small Owned Business
  • Woman Owned Small Business
  • Woman Owned Business
  • Limited Liability f
  • Native American Owned
  • American Indian Owned
  • Industries Served: Support Activities for Forestry, Water Supply and Irrigation Systems, Sewage Treatment Facilities, Steam and Air-Conditioning Supply, New Single-Family Housing Construction (except For-Sale Builders), New Multifamily Housing Construction (except For-Sale Builders), New Housing For-Sale Builders, Residential Remodelers, Industrial Building Construction, Commercial and Institutional Building Construction, Water and Sewer Line and Related Structures Construction, Oil and Gas Pipeline and Related Structures Construction, Power and Communication Line and Related Structures Construction, Highway, Street, and Bridge Construction, Other Heavy and Civil Engineering Construction, Poured Concrete Foundation and Structure Contractors, Construction
  • Product Areas: INSTALL OF CONTRUCT MATERIAL, INSTALLATION OF EQUIPMENT- CONSTRUCTION AND BUILDING MATERIALS, INSTALL OF ELECT-ELCT EQ, INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS, INSTALL OF POWER DISTRIBUTION EQ, INSTALLATION OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $60 - Thursday the 2nd of October 2014
    National Park Service
    SER REGIONAL CONTRACTING OPO
    IGF::CL::IGF THE PURPOSE OF THIS ACTION IS TO EXTEND DELIVERY DATE.
  • $4,900 - Saturday the 1st of December 2012
    Forest Service
    NATIONAL FORESTS IN ALABAMA
    IGF::OT::IGF OTHER FUNCTIONS: THE PURPOSE OF THIS MODIFICATION IS TO ADD AN ADDITIONAL 49 ACRES TO BE DONE ON THIS CONTRACT IN ACCORDANCE WITH THE SPECIFICATIONS AND PROVISIONS OF THE CONTRACT. ACRES WILL BE SHOWN BY THE COR. CONTRACTORS STATEMENT OF RELEASE: IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENTS FOR 5 DAY TIME EXTENSION AND AN ADDITIONAL 49 ACRES PROPOSAL FOR ADJUSTMENT, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY UNDER THIS CONTRACT FOR FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO THE PROPOSAL FOR ADJUSTMENT. OTHER FUNCTIONS- CHEMICAL SITE PREPARATION-- TUSKEGEE RANGER DISTRICT -
  • $474,868 - Monday the 17th of September 2012
    Department Of Navy
    NAVFAC SOUTHEAST
    BASE BID: HVAC REPAIRS AND CHANGES IN VARIOUS BUILDINGS AT NAS-JRB NEW ORLEANS.
  • $309,450 - Thursday the 13th of September 2012
    National Park Service
    SER REGIONAL CONTRACTING OPO
    LIGHT REHAB AT PACC
  • $218,933 - Thursday the 2nd of October 2014
    National Park Service
    SER REGIONAL CONTRACTING OPO
    IGF::CL::IGF, REMOVE EXISTING WINDOWS AND INSTALL WITH NEW WINDOWS, DOORS AND ROLL DOWN STORM SHUTTERS TWO STORY HEADQUARTERS BUILDING. 1. THE CONTRACTOR WILL REMOVE AND REPLACE EXISTING WINDOWS WITH NEW DOUBLE PANE WINDOWS AND INSTALL NEW ROLL DOWN HURRICANE SHUTTERS. ALL WORK WILL BE PERFORMED ON THE HEADQUARTERS BUILDING ON BOTH THE FIRST AND SECOND FLOORS. IT IS ESTIMATED THAT THERE IS (75) WINDOWS TO BE REMOVED AND (75) NEW WINDOWS WILL BE INSTALLED IN ADDITION TO INSTALLING (34) ROLL DOWN HURRICANE SHUTTERS WITH A BOXED IN FASCIA COVERS TO CONCEAL AND PROTECT ROLL DOWN SHUTTER TOP ASSEMBLIES. 2. CONTRACTOR WILL BE RESPONSIBLE TO VERIFY THE QUANTITY AND SIZES OF ALL REPLACEMENT WINDOWS AND ROLL-DOWN STORM SHUTTERS. THE SIZES AND MEASUREMENTS LISTED ARE ESTIMATES. AFTER AWARD OF CONTRACT THE CONTRACTOR WILL BE REQUIRED TO TAKE EXACT MEASUREMENTS FOR ALL REPLACEMENT WINDOWS AND ROLLUP STORM SHUTTERS. UNDERSTAND THE MEASUREMENTS GIVEN ARE AN APPROXIMATE, AND MAY NOT COMPLY WITH INDUSTRY STANDARDS FOR FITTING NEW WINDOWS AND ROLL DOWN STORM SHUTTERS. A SITE VISIT IS REQUIRED TO ENSURE THAT MEASUREMENTS CAN BE VERIFIED. 3. ALL NEW REPLACEMENT WINDOWS WILL BE REPLACED WITH PULTRUDED FIBERGLASS FACTORY BAKED ON ACRYLIC URETHANE LOE3-366 WITH ARGON GAS AND TEMPERED GLASS. SEE ADDITIONAL SPECIFICATIONS 4. ALL ROLL DOWN STORM SHUTTERS WILL MEET SPECIFICATIONS LISTED. SHUTTERS WILL BE APPROVED UL 325 LISTED, IMPACT TESTED, AND INCLUDES A SINGLE WALL END /RETENTION SYSTEM MEETING OR EXCEEDING HIGH VELOCITY HURRICANE REQUIREMENTS FOR MIAMI OR DADE COUNTY FLORIDA BUILDING CODES. SEE ADDITIONAL SPECIFICATIONS. 5. COLOR OF SHUTTERS WILL BE DETERMINED AT AWARD OF CONTRACT. IT IS ANTICIPATED SHUTTERS WILL BE IN THE IVORY/BEIGE COLOR RANGE. 6. 1ST AND 2ND FLOOR SHUTTERS ARE TO BE MANUALLY OPERATED FROM OUTSIDE. 7. CONTRACTOR IS RESPONSIBLE FOR DRILLING AND SEALING ALL HOLES PUT THROUGH THE EXTERIOR AND INTERIOR WALLS AND FRAMING.
  • $17,275 - Tuesday the 4th of September 2012
    National Park Service
    SER REGIONAL CONTRACTING OPO
    DEMOLITION OF PAVILION AREA AND RECONSTRUCTION OF CONCRETE PAD
  • $10,800 - Saturday the 1st of December 2012
    Forest Service
    NATIONAL FORESTS IN ALABAMA
    IGF::OT::IGF OTHER FUNCTIONS- CHEMICAL SITE PREPARATION-- TUSKEGEE RANGER DISTRICT -
  • $107,372 - Wednesday the 1st of August 2012
    National Park Service
    SER REGIONAL CONTRACTING OPO
    REROOF 4 BUILDINGS AT ABE LINCOLN BIRTHPLACE.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.