Kiewit Infrastructure West Co
- View government funding actions
- Vancouver, WA 986617753
- Phone: 402-342-2052
- Estimated Number of Employees: 24,700
- Estimated Annual Receipts: $8,078,000,128
- Business Start Date: 1982
- Contact Person: John Lochner
- Contact Phone: 360-693-1478
- Contact Email: JOHN.LOCHNER@KIEWIT.COM
- Business Structure:
- Corporate Entity (Not Tax Exempt)
- Business Type:
- For Profit Organization
- Industries Served: New Multifamily Housing Construction (except For-Sale Builders), Industrial Building Construction, Commercial and Institutional Building Construction, Water and Sewer Line and Related Structures Construction, Oil and Gas Pipeline and Related Structures Construction, Power and Communication Line and Related Structures Construction, Highway, Street, and Bridge Construction, Other Heavy and Civil Engineering Construction, Site Preparation Contractors
- Product Areas: GAS TURBINES AND JET ENGINES, AIRCRAFT, PRIME MOVING; AND COMPONENTS, GAS TURBINES & JET ENGINES AIRCRAFT, BEARINGS, PLAIN, UNMOUNTED, NUTS AND WASHERS, FASTENING DEVICES, PACKING AND GASKET MATERIALS, BUSHINGS, RINGS, SHIMS AND SPACERS, BUSHINGS, RINGS, SHIMS, AND SPACERS
Sampling of Federal Government Funding Actions/Set Asides
In order by amount of set aside monies.
- $82,000 - Wednesday the 26th of September 2012
Department Of Army
W075 ENDIST LOS ANGELES
CONTRACT FOR TUJUNGA WASH ECOSYSTEM RESTORATION AT LOS ANGELES COUNTY. INCREASE $82,000.00, REF. NO. R00004 NE004 CONC BOXES, ORNAMENTAL GATES, EDGER. THE CONTRACT COMPLETION DATE SHALL BE EXTENDED BY 10 CALENDAR DAYS BY REASON OF THIS MODIFICATION. - $240,000 - Wednesday the 27th of February 2013
Department Of Army
W075 ENDIST LOS ANGELES
CONTRACT FOR TUJUNGA WASH ECOSYSTEM RESTORATION AT LOS ANGELES COUNTY. INCREASE $240,000. REF. NO. R00006, NE006 PULL OUTS, BENCHES, SIGNAGE. THE CONTRACT COMPLETION DATE SHALL BE EXTENDED BY 22 CALENDAR DAYS BY RESON OF THIS MODIFICATION. - $20,930 - Saturday the 11th of August 2012
Department Of Army
W075 ENDIST LOS ANGELES
CONTRACT FOR DESIGN BUILD, CONSTRUCTION OF AREA V&VI BORDER INFRASTRUCTURE SYSTEM, SAN DIEGO SECTOR, CALIFORNIA AT SAN DIEGO CA. REFERENCE NO. R00116, INCREASE $20,930.00, AS022 PERMANENT POWER-AREA VI, AS023 SECONDARY FENCE SPARE PARTS, AS024 PAVEMENT MARKINGS, AS025 CONTINUE GOVERNMENT SUPPORT OFFICE CAMPO. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION. - $200,000 - Wednesday the 23rd of May 2012
Department Of Army
W075 ENDIST LOS ANGELES
CONTRACT FOR TUJUNGA WASH ECOSYSTEM RESTORATION AT LOS ANGELES COUNTY. REFERENCE NO. R00002 NE002 THREE PROPERTIES TOTAL CONTRACT PRICE IS INCREASED BY $200,000.00. THE CONTRACT COMPLETION DATE SHALL BE EXTENDED BY 14 CALENDAR DAYS BY REASON OF THIS MODIFICATION. - $20,000 - Tuesday the 12th of June 2012
Department Of Army
W075 ENDIST LOS ANGELES
CONTRACT FOR TUJUNGA WASH ECOSYSTEM RESTORATION AT LOS ANGELES COUNTY. REFERENCE NO. R00003, INCREASE $20,000.00, NE003 RAIN GUAGE, MANHOLE, AND ACCESS GATE. THE CONTRACT COMPLETION DATE SHALL BE EXTENDED BY 4 CALENDAR DAYS BY REASON OF THIS MODIFICATION. - $15,323 - Saturday the 25th of August 2012
Department Of Army
W075 ENDIST LOS ANGELES
CONTRACT FOR DESIGN BUILD, CONSTRUCTION OF AREA V&VI BORDER INFRAXTRUCTURE SYSTEM, SAN DIEGO SECTOR, CA AT SAN DIEGO CA. REFERENCE NO. R00124, INCREASE $15,323.00, AS026 RAMP AT GOAT CANYON/SMUGGLER'S CULVERT. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION - $14,604 - Saturday the 25th of August 2012
Department Of Army
W075 ENDIST LOS ANGELES
CONTRACT FOR DESIGN BUILD, CONSTRUCTION OF AREA V&VI BORDER INFRASTRUCTURE SYSTEM, SAN DIEGO SECTOR, CALIFORNIA AT SAN DIEGO CA. REFERENCE NO. R00117, INCREASE $14,604.00, SD027 REVISED SPARE PARTS REQUIREMENTS. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION. - $130,624 - Sunday the 30th of September 2012
Department Of Army
W075 ENDIST LOS ANGELES
R00008 $130,623.58 NE008 SHERMAN WAY OBSTRUCTION TUJUNGA WASH ECOSYSTEM DESIGN BUILD, LOS ANGELES COUNTY - $105,933 - Friday the 31st of August 2012
Department Of Army
W075 ENDIST LOS ANGELES
DESIGN BUILD, TUJUNGA WASH. CONTRACT FOR TUJUNGA WASH ECOSYSTEM RESTORATION AT LOS ANGELES COUNTY. REFERENCE NO. R00001, INCREASE $105,933.00, NE001 THREE WEEK DELAY. THE CONTRACT COMPLETION DATE SHALL BE EXTENDED BY 21 CALENDAR DAYS BY REASON OF THIS MODIFICATION.
© Copyright 2019
The Collier Report published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources.
No reliance should be made by readers or Collier Report subscribers.
Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances.
Requests for the modification of displayed information may be made to help.desk@1918.media.