Konnowac Llc
- View government funding actions
- Yakima, WA 989023438
- Phone: 509-453-8100
- Estimated Number of Employees: 8
- Estimated Annual Receipts: $4,000,000
- Business Start Date: 2003
- Contact Person: Jerry Siekawitch
- Contact Phone: 509-453-8100
- Contact Email: konnowac@msn.com
- Business Structure:
- Partnership or Limited Liability Partnership
- Business Type:
- Minority Owned Business
- Self Certified Small Disadvantaged Business
- For Profit Organization
- Limited Liability f
- Native American Owned
- American Indian Owned
- Industries Served: Industrial Building Construction, Commercial and Institutional Building Construction, Water and Sewer Line and Related Structures Construction, Highway, Street, and Bridge Construction, Other Heavy and Civil Engineering Construction, Poured Concrete Foundation and Structure Contractors, Structural Steel and Precast Concrete Contractors, Framing Contractors, Masonry Contractors, Glass and Glazing Contractors, Roofing Contractors, Siding Contractors, Other Foundation, Structure, and Building Exterior Contractors, Electrical Contractors and Other Wiring Installation Contractors, Plumbing, Heating, and Air-Conditioning Contractors, Drywall and Insulation Contractors, Construction
- Product Areas: SPECIAL STUDIES/ANALYSIS- ENERGY, ENERGY STUDIES
Sampling of Federal Government Funding Actions/Set Asides
In order by amount of set aside monies.
- $96,400 - Tuesday the 12th of June 2012
Department Of Army
W071 ENDIST WALLA WALLA
THE EMERGENCY REPAIR OF COFFER CELL #4 AT THE NAVIGATION LOCK AT ICE HARBOR LOCK AND DAM, BURBANK, WASHINGTON. US ARMY CORPS OF ENGINEERS, WALLA WALLA DISTRICT. - $81,750 - Wednesday the 5th of September 2012
Department Of Army
W071 ENDIST SEATTLE
MATERIALS, (ROCK), DELIVERED - $5,897 - Friday the 13th of January 2012
Department Of Army
W071 ENDIST WALLA WALLA
ADDITIONAL HECP REQUIREMENTS (CR001) - $44,444 - Friday the 27th of July 2012
Department Of Army
W071 ENDIST WALLA WALLA
MODIFICATION A00004 REA CLAIM FOR DELAYS CRA0005 - $415,889 - Friday the 11th of May 2012
Department Of Army
W071 ENDIST PORTLAND
TD TRANSFORMER FALL PROTECTION DESIGN/BUILD. DESIGN AND INSTALLATION OF FALL PROTECTION. - $39,875 - Friday the 28th of September 2012
Department Of Army
W071 ENDIST SEATTLE
MATERIALS, (ROCK), DELIVERED - $398 - Thursday the 2nd of February 2012
Public Buildings Service
GSA/PBS
INSTALL WOOD THRESHOLD FOR LAW LIBRARY DOORS - $394,561 - Wednesday the 26th of September 2012
Department Of Army
W071 ENDIST PORTLAND
SPALLIING REPAIRS IN B2CC - $343,300 - Thursday the 29th of December 2011
Department Of Army
W071 ENDIST WALLA WALLA
TRASH SHEAR BOOM REPAIR AT LOWER GRANITE LOCK AND DAM, POMEROY, WASHINGTONG; US ARMY CORPS OF ENGINEERS, WALLA WALLA DISTRICT. - $22,450 - Tuesday the 27th of November 2012
Indian Health Service
DEPT OF HHS/INDIAN HEALTH SERVICE
IGF::OT::IGF - REPLACEMENT OF HEAT PUMPS AT WHITE SWAN DENTAL CLINIC.
© Copyright 2019
The Collier Report published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources.
No reliance should be made by readers or Collier Report subscribers.
Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances.
Requests for the modification of displayed information may be made to help.desk@1918.media.