Macnak Construction Llc
- View government funding actions
- Lakewood, WA 984998890
- Phone: 757-270-8139
- Corporate URL: www.macnak.com
- Estimated Number of Employees: 8
- Estimated Annual Receipts: $2,300,000
- Business Start Date: 2007
- Contact Person: Terence Dee Kalauokalani King
- Contact Phone: 757-270-8139
- Contact Email: tdking@macnak.com
- Business Structure:
- Partnership or Limited Liability Partnership
- Business Type:
- Minority Owned Business
- Self Certified Small Disadvantaged Business
- For Profit Organization
- Native Hawaiian Organization Owned Firm
- Veteran Owned Business
- DOT Certified DBE
- Limited Liability f
- Native American Owned
- Service Disabled Veteran Owned Business
- Industries Served: Logging, Support Activities for Forestry, New Single-Family Housing Construction (except For-Sale Builders), New Multifamily Housing Construction (except For-Sale Builders), Residential Remodelers, Industrial Building Construction, Commercial and Institutional Building Construction, Water and Sewer Line and Related Structures Construction, Power and Communication Line and Related Structures Construction, Highway, Street, and Bridge Construction, Other Heavy and Civil Engineering Construction, Poured Concrete Foundation and Structure Contractors, Framing Contractors, Roofing Contractors, Other Foundation, Structure, and Building Exterior Contractors, Electrical Contractors and Other Wiring Installation Contractors, Construction
- Product Areas: NATURAL RESOURCES/CONSERVATION- SITE PREPARATION, SITE PREPARATION, ENVIRONMENTAL SYSTEMS PROTECTION- TOXIC AND HAZARDOUS SUBSTANCE ANALYSIS, HAZARDOUS SUBSTANCE ANALYSIS, ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATION, HARZ REMV/CLEAN-UP/DISP/OP
Sampling of Federal Government Funding Actions/Set Asides
In order by amount of set aside monies.
- $97,600 - Thursday the 20th of September 2012
US Fish And Wildlife Service
CONTRACTING AND GENERAL SERVICES DIV
FENCING CONSTRUCTION - $745 - Wednesday the 1st of February 2012
Forest Service
UMPQUA NATIONAL FOREST
THE PURPOSE OF THIS MODIFICATION IS TO INCREASES LINE ITEM 03 BY $745.00 TO ADD A TRANSIENT VOLTAGE SURGE SUPPRESSOR (TVSS) TO THE PUMP CONTROLS. - $7,131 - Tuesday the 3rd of July 2012
Bureau Of Reclamation
BOISE REGIONAL OFFICE
FASCIA/FLASHING INSTALLATION - $583,014 - Wednesday the 14th of August 2013
Veterans Affairs Department
568-VA BLACK HILLS HEALTH CARE SYSTEM
CONTRACTOR TO COMPLETE PROJECT 568-12-203 REPAIR EXTERIOR DOM PORCHES AND GREENHOUSE AT THE VA BLACK HILLS HEALTH CARE SYSTEM, HOT SPRINGS, SD. IGF::CT::IGF - $55,404 - Friday the 7th of September 2012
Forest Service
ROCKY MOUNTAIN REGION
JEFFCO ATB PARKING LOT SURFACING PROJECT - $478,933 - Tuesday the 4th of September 2012
Department Of Army
W071 ENDIST WALLA WALLA
DESIGN, BUILD,&INSTALL ADULT FISH TRAP AT ICE HARBOR DAM - $45,000 - Thursday the 12th of July 2012
Bureau Of Reclamation
BOISE REGIONAL OFFICE
CORRECT TAPPING SLEEVE DEFICIENCIES. - $439,514 - Tuesday the 8th of May 2012
Department Of Army
W071 ENDIST SEATTLE
REPAIR GREASE AND OIL TRAPS AT OUTFALL 9. - $3,950 - Monday the 21st of May 2012
Forest Service
UMPQUA NATIONAL FOREST
THE PURPOSE OF THIS MODIFICATION IS TO ADD A LINE FOR REPLACEMENT OF THE SUCTION LINE BETWEEN THE PUMP HOUSE AND THE NEWLY INSTALLED SCREEN AND FOOT VALVE. THIS IS REQUIRED TO ENSURE SUCCESSFUL OPERATION OF THE NEW SYSTEM. THIS CHANGE WAS NOT KNOWN AT THE TIME OF THE SOLICITATION. - $3,575 - Friday the 31st of August 2012
Forest Service
ROCKY MOUNTAIN REGION
MODIFICATION TWO (02) FOR THE GRIZZLY-HELENA TRAIL BRIDGE PROJECT FOR THE MEDICINE BOW AND ROUTT NATIONAL FORESTS AND THUNDER BASIN NATIONAL GRASSLANDS. THIS MODIFICATION IS IN RESPONSE TO THE CONTRACTORS REQUEST FOR EQUITABLE ADJUSTMENT (REA) DATED JUNE 12, 2012 AND IS DONE IN ACCORDANCE WITH FAR 52.243-4 CHANGES. THE FOLLOWING CHANGES SETTLE THIS REA AND ARE HEREBY INCORPORATED INTO THIS CONTRACT. REQUEST FOR EQUITABLE ADJUSMENT $16,786.00 ADDITIONAL COST TO CUT HELICAL PIERS $ 849.00 ADDITIONAL COST TO REFABRICATE BATTER PILE CONNECTIONS ON SITE $ 4,000.00 REDUCTION FOR STRUCTURE BACKFILL ($ 6,208.14) REDUCTION FOR GEOTEXTILE MATERIAL ($ 2,122.70) REDUCTION FOR GABION MATERIAL ($ 9,729.63) TOTAL ADDITION FOR MODIFICATION TWO $ 3,574.53 CONTRACT RECAP: ORIGINAL AMOUNT $477,212.00 MODIFICATION ONE (1) -0- MODIFICATION TWO (2) $ 3,574.53 REVISED TOTAL $480,786.53 ALL OTHER TERMS AND CONDITIONS OF THIS CONTRACT REMAIN IN FULL FORCE AND EFFECT.
© Copyright 2019
The Collier Report published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources.
No reliance should be made by readers or Collier Report subscribers.
Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances.
Requests for the modification of displayed information may be made to help.desk@1918.media.