Mactec Rk&k Joint Venture
- View government funding actions
- Raleigh, NC 276041658
- Phone: 770-360-0595
- Estimated Number of Employees: 3,182
- Estimated Annual Receipts: $459,017,664
- Business Start Date: 2008
- Contact Person: Linda Matthews
- Contact Phone: 610-877-6038
- Contact Email: linda.matthews@amecfw.com
- Business Structure:
- Corporate Entity (Not Tax Exempt)
- Business Type:
- For Profit Organization
- Industries Served: Industrial Building Construction, Commercial and Institutional Building Construction, Water and Sewer Line and Related Structures Construction, Land Subdivision, Other Heavy and Civil Engineering Construction, Other Foundation, Structure, and Building Exterior Contractors, Electrical Contractors and Other Wiring Installation Contractors, Site Preparation Contractors, Architectural Services, Engineering Services, Drafting Services, Building Inspection Services, Geophysical Surveying and Mapping Services, Surveying and Mapping (except Geophysical) Services, Testing Laboratories, Industrial Design Services, Professional, Scientific, and Technical Services
- Product Areas: GEOTECHNICAL STUDIES, SPECIAL STUDIES/ANALYSIS- GEOTECHNICAL, SOIL STUDIES, SPECIAL STUDIES/ANALYSIS- SOIL, ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING, A/E SVCS. (INCL LANDSCAPING INTERIO, ARCHITECT AND ENGINEERING- GENERAL: INSPECTION (NON-CONSTRUCTION), A/E - INSPECT - NON CONTRUCT, ARCHITECT AND ENGINEERING- GENERAL: OTHER, OTHER ARCHITECTS & ENGIN GEN, OTHER QC/TEST/INSPECT- MISCELLANEOUS, MISC TEST & INSPECT SVC
Sampling of Federal Government Funding Actions/Set Asides
In order by amount of set aside monies.
- $667,979 - Tuesday the 10th of January 2012
Department Of Navy
NAVAL FAC ENGINEERING CMD MID LANT
EXERCISE OPTION FOR FIELD SERVICES AND PROJECT MANAGEMENT/ADMINISTRATION FOR P1382 NEW BASE ENTRY POINT AND ROAD AT MCB CAMP LEJEUNE, NC - $425,542 - Thursday the 29th of March 2012
Department Of Navy
NAVAL FAC ENGINEERING CMD MID LANT
SEPARATE DESIGN EFFORT FROM THE TOTAL PROPOSED PROJECT FOR THE DESIGN OF A BRIDGE CROSSING SCALES CREEK AT MCB CAMP LEJEUNE FOR P1383&P1384 NEW BASE ENTRY POINT AND ROAD. - $41,519 - Wednesday the 22nd of February 2012
Department Of Navy
NAVAL FAC ENGINEERING CMD MID LANT
CHANGE DESIGN TO CORRECT STORMWATER MANAGEMENT FOR P1383 BASE ENTRY POINT AND ROAD, PHASE II AT MCB CAMP LEJEUNE, NC. - $413,455 - Wednesday the 18th of April 2012
Department Of Navy
NAVAL FAC ENGINEERING CMD MID LANT
NCDOT CHANGES, UPDATED CLOMR, CARWASH ROAD DESIGN, AND PCAS - $29,150 - Wednesday the 7th of March 2012
Department Of Navy
NAVAL FAC ENGINEERING CMD MID LANT
PROVIDE THE ADDITION OF THE REQUIRED DESIGN EFFORT TO PROPERLY LOCATE THE JUNCTION BOXES AND LIGHT FIXTURES TO PROVIDE LOW LEVEL LIGHTING FOR THE PEDESTRIAN TRAIL ON THE BRIDGE. - $21,006 - Tuesday the 17th of July 2012
Department Of Navy
NAVAL FAC ENGINEERING CMD MID LANT
EXERCISE OPTION FOR BORROW PIT DEWATERING AND ASSOCIATED PERMITTING FOR BORROW PITS FOR P1383 BASE ENTRY POINT AND ROAD, PHASE II, MCB CAMP LEJEUNE, NC - $163,688 - Wednesday the 18th of January 2012
Department Of Navy
NAVAL FAC ENGINEERING CMD MID LANT
PROVIDE CONSTRUCTION MANAGEMENT ASSISTANCE FOR P1382 NEW BASE ENTRY POINT AND ROAD, PHASE I, MCB CAMP LEJEUNE, NC - $143,320 - Tuesday the 24th of January 2012
Department Of Navy
NAVAL FAC ENGINEERING CMD MID LANT
P1383 BASE ENTRY POINT AND ROAD PHASE II, MCB CAMP LEJEUNE, NC CHANGE DRAWINGS AND GENERATE AMENDMENT FOR THIS LOST DESIGN AND PREPARE PERMIT AMENDMENT AND SUBMITTAL PACKAGE. - $117,456 - Friday the 29th of June 2012
Department Of Navy
NAVAL FAC ENGINEERING CMD MID LANT
PROVIDE CONSTRUCTION SUPPORT AND ENVIRONMENTAL SUPPORT TO THE OICC AT MARINE CORPS BASE, CAMP LEJEUNE, NC. - $11,038 - Tuesday the 10th of January 2012
Department Of Navy
NAVAL FAC ENGINEERING CMD MID LANT
PREPARE SEPARATE SPEC PACKAGE FOR ADVERTISEMENT OF WORK OF CONSTRUCTING THE ENTRY ROADS AND RAMPS AT TARAWA TERRACE.
© Copyright 2019
The Collier Report published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources.
No reliance should be made by readers or Collier Report subscribers.
Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances.
Requests for the modification of displayed information may be made to help.desk@1918.media.