The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

North Star Paving & Construction Inc

  • North Star Paving & Construction Inc

  • View government funding actions
  • Soldotna, AK 996697102
  • Estimated Number of Employees: 35
  • Estimated Annual Receipts: $17,000,000

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $57,700 - Tuesday the 8th of November 2011
    Department Of Army
    W2SN ENDIST ALASKA
    FTW365 TPFS SIMULATOR BUILDING - CASE 3, REA, CONCRETE FOUNDATION, CASE 4, PROVIDE POWER TO CH47FTPS SIMULATOR, CASE 5, SCOPE REVISIONS, CASE 6, ADDITIONAL SCOPE REVISIONS. REA, CONCRETE FOUNDATION TO PROVIDE AN EQUITABLE ADJUSTMENT TO THE CONTRACTOR FOR CONSTRUCTION OF A STEM WALL AND FOOTINGS FOUNDATION IN LIEU OF A MONOLITHIC SLAB. PROVIDE POWER TO CH47FTPS SIMULATOR SIMULATOR POWER SOURCE SHALL BE DERIVED FROM THE EXISTING MDP RATHER THAN FROM A NEW ELECTRICAL SERVICE. UPGRADE EXISTING MDP MAIN CIRCUIT BREAKER AND EXISTING ELECTRICAL ROOM DOORS. PROVIDE ALL ENGINEERING, EQUIPMENT, MATERIALS, LABOR, ETC. TO ACCOMPLISH THE SCOPE OF WORK. ALL WORK SHALL BE SHOWN ON AS-BUILT DRAWINGS. SCOPE REVISIONS ITEM 1 - DELETE THE CONSTRUCTION OF THE ACCESS ROAD FROM THE CONTRACT. ITEM 2 - DELETE ALL SIDEWALKS FROM THE CONTRACT. ITEM 3 - DELETE ALL TOPSOIL AND GRASS SEEDING FROM THE CONTRACT. ITEM 4 - ADD NFS FILL GRADE AND COMPACT TO 95% TO THE FINAL GRADE ELEVATIONS AROUND THE NEW ADDITION. MAINTAIN THE 2% SLOPE AWAY FROM THE BUILDING. ADDITIONAL SCOPE REVISIONS ITEM 1 - DELETE THE MAINTENANCE ROOM, ROOM 105, TO INCLUDE ALL WALLS, GYPSUM WALL BOARD (GWB), INSULATION, FRAMING, DOOR, CABINET UNIT HEATER, THERMOSTAT, SUPPLY AIR WITH ALL ASSOCIATED DUCT WORK, 3 ELECTRICAL OUTLETS AND ASSOCIATED WIRING AND MATERIALS, EMERGENCY LIGHT, 2 COMMUNICATION OUTLETS AND CAT6 CABLE ASSOCIATED, 5 PENDULUM LIGHTS, SWITCHES, AND ALL LIFE SAFETY EQUIPMENT/MATERIALS THAT WOULD HAVE ONLY PROTECTED THAT ROOM AND WITHOUT VIOLATING CODE. ADD 1-2 BAY LIGHTS TO MATCH DESIGN AND ENSURE PROPER COVERAGE OF LUMENS. RELOCATE ALL HVAC/ELECTRICAL CONTROLS FOR THE BAY TO A LOCATION THAT WOULD BEST ACCOMMODATE THE SYSTEM. ADD NECESSARY LIFE SAFETY EQUIPMENT TO INSURE ADEQUATE COVERAGE AS PER SPECIFIED CODES. ITEM 2 - DELETE THE SOUTH WALL TO INCLUDE ALL FRAMING, INSULATION, GYPSUM WALL BOARD. SURFACE MOUNT ALL DETAILED ELECTRICAL OUTLETS AND COMMUNICATION PORTS TO THE EXISTING SOUTH WALL. ENSURE GAPS BETWEEN THE EXISTING BUILDING AND THE ADDITION ARE INSULATED AND WEATHERPROOFED. ITEM 3 - DELETE ALL BOLLARDS FROM THE CONTRACT. ITEM 4 - THE GOVERNMENT AUTHORIZES THE CONSOLIDATION OF THE SITE SAFETY HEALTH OFFICER (SSHO) WITH THE CONSTRUCTION QUALITY CONTROL SYSTEM MANAGER (CQCSM). CONTINUE TO ENSURE COMPLIANCE WITH EM 385-1-1 AND ALL OTHER SAFETY REQUIREMENTS AS PER THE CONTRACT.
  • $4,726 - Thursday the 3rd of November 2011
    US Coast Guard
    CEU JUNEAU
    PAVEMENT AND DRAINAGE REPAIRS FOR HOME FAMILY HOUSING ROADWAYS AND DRIVEWAYS.
  • $42,614 - Monday the 19th of December 2011
    Forest Service
    CHUGACH NATIONAL FOREST
    BYRON GLACIER ROAD CONSTRUCTION
  • $3,802,671 - Tuesday the 18th of September 2012
    Natural Resources Conservation Service
    AK STATE OFFICE (NRCS)
    MCGRATH 2011-1A EWP PROJECT--CONSTRUCTION CONTRACT
  • $3,672,776 - Tuesday the 4th of June 2013
    Federal Highway Administration
    WESTERN FEDERAL LANDS HIGHWAY DIVISION
    CONSTRUCTION PROJECT FOR MCGRATH ROADS RECONSTRUCTION-AK DEN 2009(9)
  • $34,761 - Monday the 3rd of December 2012
    Forest Service
    CHUGACH NATIONAL FOREST
    OTHER FUNCTIONS BYRON GLACIER ROAD CONSTRUCTION
  • $33,767 - Monday the 24th of October 2011
    Forest Service
    CHUGACH NATIONAL FOREST
    BYRON GLACIER ROAD CONSTRUCTION
  • $26,912 - Thursday the 30th of August 2012
    Bureau Of Land Management
    NOC CONSTRUCTION & AE ACQUISITION BRANCH
    TAYLOR HWY WAYSIDE REPAIR
  • $25,350 - Thursday the 23rd of February 2012
    Forest Service
    CHUGACH NATIONAL FOREST
    BYRON GLACIER ROAD CONSTRUCTION
  • $2,510 - Thursday the 30th of August 2012
    Bureau Of Land Management
    NOC CONSTRUCTION & AE ACQUISITION BRANCH
    TAYLOR HWY WAYSIDE REPAIR

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.