The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Northrop Grumman Systems Corporation dba Aerospace Systems

  • Northrop Grumman Systems Corporation dba Aerospace Systems

  • View government funding actions
  • Redondo Beach, CA 902781001
  • Phone: 310-812-1089
  • Estimated Number of Employees: 75,000
  • Estimated Annual Receipts: $33,609,000,960
  • Business Start Date: 1939
  • Contact Person: Helen Ackley
  • Contact Phone: 310-812-5149
  • Contact Email: Helen.Ackley@ngc.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Manufacturer of Goods
  • Industries Served: Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing, Semiconductor and Related Device Manufacturing, Printed Circuit Assembly (Electronic Assembly) Manufacturing, Other Electronic Component Manufacturing, Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing, Guided Missile and Space Vehicle Manufacturing, Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing, Surveying and Mapping (except Geophysical) Services, Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
  • Product Areas: FIRE FIGHTING EQUIPMENT, SAFETY AND RESCUE EQUIPMENT, BATTERIES, RECHARGEABLE, OUTERWEAR, MEN'S, OUTERWEAR, WOMEN'S, ARMOR, PERSONAL, R&D- DEFENSE SYSTEM: ELECTRONICS/COMMUNICATION EQUIPMENT (APPLIED RESEARCH/EXPLORATORY DEVELOPMENT), R&D-ELECTRONICS & COMM EQ-A RES/EXP, R&D-TEXTILES,CLOTHING,ETC-ADV DEV, R&D- DEFENSE OTHER: TEXTILES/CLOTHING/EQUIPAGE (ADVANCED DEVELOPMENT), EQ TEST SVCS/FIRE-RESCUE-SAFETY EQ, EQUIP/MATERIALS TESTING- FIRE FIGHTING/RESCUE/SAFETY EQUIPMENT; ENVIRON PROTECT EQUIPMENT/MATLS

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $9,487,000 - Monday the 23rd of April 2012
    National Aeronautics And Space Administration
    AMES RESEARCH CENTER
    OTHER FUNCTIONS MULTI MISISON MODULAR BUS DEVELOPMENT TASK ORDER UNDER THE MSV MULTI-AWARD IDIQ. THE CONTRACTOR SHALL FURNISH ALL LABOR, SUPPLIES, MATERIALS, TRAVEL, OTHER DIRECT COSTS, AND FEES, NECESSARY TO ACCOMPLISH THE REQUIREMENTS CONTAINED IN THE ATTACHED TASK ORDER.
  • $890,000 - Friday the 17th of February 2012
    Department Of Air Force
    FA8650 USAF AFMC AFRL/RQK
    INCREMENTAL FUNDING
  • $80,000 - Tuesday the 12th of June 2012
    Department Of Navy
    OFFICE OF NAVAL RESEARCH
    RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY)
  • $80,000 - Thursday the 22nd of December 2011
    Department Of Navy
    OFFICE OF NAVAL RESEARCH
    RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY)
  • $767,849 - Thursday the 19th of January 2012
    Defense Advanced Research Projects Agency
    DEF ADVANCED RESEARCH PROJECTS AGCY
    THE GOAL OF THE MICROSCALE PLASMA DEVICES (MPD) PROGRAM IS TO DESIGN, DEVELOP, AND CHARACTERIZE MPD TECHNOLOGIES, CIRCUITS, AND SUBSTRATES. IT IS ENVISIONED THAT BOTH TWO AND MULTI-TERMINAL DEVICES CONSISTING OF VARIOUS ARCHITECTURES WILL BE DEVELOPED AND OPTIMIZED UNDER THE SCOPE OF THIS PROGRAM. ENVISIONED MPDS WILL CONSIST OF TWO AND MULTI-TERMINAL COMPONENTS THAT ENABLE, CIRCUITS, SUBSTRATES AND CONTROLLABLE SURFACES, FOR ROBUST OPERATION IN EXTREME RADIATION AND TEMPERATURE ENVIRONMENTS. THE PURPOSE OF THIS MODIFICATION IS TO APPLY INCREMENTAL FUNDING TO CLIN 0002 (TECHNICAL AREA 2).
  • $738,679 - Tuesday the 23rd of October 2012
    Department Of Air Force
    FA9451 DET 8 AFRL PKD
    JHPSSL BEAM QUALITY UPGRADES
  • $651,000 - Friday the 24th of February 2012
    Department Of Air Force
    FA8650 USAF AFMC AFRL/RQK
    INCREMENTAL FUNDING - G-BAND RADIO INTERFACE FOR FUTURE ELECTRONIC NETWORKS (GRIFFEN)
  • $6,000,000 - Monday the 3rd of December 2012
    National Aeronautics And Space Administration
    AMES RESEARCH CENTER
    OTHER FUNCTIONS MULTI MISISON MODULAR BUS DEVELOPMENT TASK ORDER UNDER THE MSV MULTI-AWARD IDIQ. THE CONTRACTOR SHALL FURNISH ALL LABOR, SUPPLIES, MATERIALS, TRAVEL, OTHER DIRECT COSTS, AND FEES, NECESSARY TO ACCOMPLISH THE REQUIREMENTS CONTAINED IN THE ATTACHED TASK ORDER.
  • $599,669 - Tuesday the 17th of January 2012
    National Aeronautics And Space Administration
    GLENN RESEARCH CENTER
    SAP PURCHASE REQUISITION: 4200402649 SOLAR ELECTRIC PROPULSION (SEP) SYSTEM DEMONSTRATION MISSION CONCEPT STUDIES.
  • $54,000 - Tuesday the 7th of February 2012
    Department Of Air Force
    FA8650 USAF AFMC AFRL/RQK
    INC FUNDING

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.