The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Nu Tek Precision Optical Corp

  • Contact Person: Robert Bupp
  • Contact Phone: 410-273-7070
  • Contact Email: rbupp@nu-tek-optics.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Manufacturer of Goods
  • Industries Served: Precision Turned Product Manufacturing, Optical Instrument and Lens Manufacturing
  • Product Areas: MAINT-REP OF ELECT-ELCT EQ, MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS, INSTALL OF ELECT-ELCT EQ, INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $73,765 - Wednesday the 3rd of May 2017
    National Aeronautics And Space Administration
    GODDARD SPACE FLIGHT CENTER
    CALL #3 COMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL.
  • $6,437 - Thursday the 1st of March 2012
    National Aeronautics And Space Administration
    LANGLEY RESEARCH CENTER
    HARDWARD FOR TELESCOPE AND TELESCOPE REALIGNMENT EVALUATION
  • $5,730 - Tuesday the 18th of September 2012
    Department Of Air Force
    FA8250 AFSC PZAAA1
    REPAIR OF ROTATOR MIRRORS.
  • $13,400 - Tuesday the 29th of July 2014
    National Aeronautics And Space Administration
    GODDARD SPACE FLIGHT CENTER
    N013101OFF AXIS PARABOLAS 18.00" (QTY. 2) N013102OFF AXIS PARABOLAS 18.00" (QTY. 2)
  • $11,402 - Thursday the 5th of April 2012
    National Aeronautics And Space Administration
    GLENN RESEARCH CENTER
    PYREX GLASS FRONT SURFACE MIRROR

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.