  • $960 - Thursday the 2nd of August 2012
    Public Buildings Service
    GSA/PBS
    ADDITIONAL WIRING FOR HIRSCH PANELS
  • $9,089 - Thursday the 9th of August 2012
    Forest Service
    SIUSLAW NATIONAL FOREST
    PROVIDING AND INSTALLING NETWORK CONNECTION AT THE CFSL, CORVALLIS, OR
  • $8,329 - Thursday the 3rd of November 2011
    Public Buildings Service
    GSA/PBS
    PATCHA AND PAINT HATFIELD 7TH FLOOR
  • $8,092 - Tuesday the 8th of May 2012
    Public Buildings Service
    GSA/PBS
    ADDITIONAL FUNDING FOR HIRSCH COMPLETION
  • $8,070 - Saturday the 8th of September 2012
    Forest Service
    WALLOWA-WHITMAN NATIONAL FOREST
    LA GRANDE FORESTRY AND RANGE SCIENCE LAB WAREHOUSE EXPANSION AND OFFICE REMODEL---MOD 0001 IS TO ADD IN THE REPLACEMENT OF HVAC DUCTBOARD SUPPLY AIR DUCTS IN THE ATTIC SPACE WITH 12" ROUND METAL DUCTS INSULATED TO R-7 TO MATCH THE OTHER NEW DUCTS BEING INSTALLED IN THE WAREHOUSE (THE EXISTING DUCTBOARD DUCTS ARE IN POOR CONDITION AND APPEAR TO HAVE LEAKS IN THEM), INSTALL NEW BLOW-IN R-38 INSULATION IN THE ATTIC OF THE WAREHOUSE (CURRENTLY THERE IS NO INSULATION OVER THE FRONT ROOM (WOOD SHOP)), AND TO INSTALL 2" NATURAL GAS LINE TO SERVE FURNACE.---MOD 0002 IS TO REMOVE THE REQUIREMENT TO REPLACE THE DOOR AT THE EAST END OF THE WAREHOUSE AND THE WINDOW ON THE WALL AT THE SOUTH END OF THE WAREHOUSE, ADD A NEW 8"X4'X5' CONCRETE PAD AT THE EXTERIOR OF THE EAST WAREHOUSE DOOR, ADD THE INSTALLATION OF NEW "VACANT/OCCUPIED" DEAD BOLT INDICATOR LOCKS IN THE FIRST FLOOR RESTROOM DOORS, AND TO INCORPORATE THE BREAK ROOM DOOR RECONFIGURATION. SEE THE SEPARATELY ATTACHED MODIFICATION JUSTIFICATION DOCUMENT FOR MORE DETAILS.---MOD 0003 IS TO PROVIDE AND INSTALL CAT 6 DATA WIRING AS SHOWN ON THE SEPARATELY ATTACHED DRAWINGS AND SPECIFICATION SECTIONS 270000 AND 270001. PRODUCTS SHALL BE PROVIDED AND INSTALLED PER APPROVED PRODUCT SUBMITTALS. THIS WORK IS NEEDED TO BRING THE ENTIRE BUILDING IN CURRENT COMPLIANCE WITH CIO DIRECTION FOR DATA WIRING. THIS WILL ALSO ENABLE VOICE OVER IP (VOIP) TELEPHONE TECHNOLOGY TO BE INSTALLED IN THE BUILDING. CIO HAS ALREADY ACQUIRED THE VOIP EQUIPMENT FOR THIS CHANGE-OVER AND IS PLANNING TO INSTALL IT IN AUGUST 2012.---MOD 0004 IS TO ADD THE SUPPLY AND INSTALLATION OF DOOR HARDWARE AND TOILET AND BATH ACCESSORIES.
  • $797 - Friday the 9th of March 2012
    Forest Service
    NORTHWEST OREGON CONTRACTING AREA
    REMODEL OF EVERGREEN ROOM AT ZIGZAG RANGER STATION
  • $773 - Friday the 10th of February 2012
    Public Buildings Service
    GSA/PBS
    MODIFICATION TO INCORPORATE ADDITIONAL WORK - HOLD OPEN DOOR CLOSERS
  • $7,565 - Thursday the 27th of September 2012
    Energy Department
    NATIONAL ENERGY TECHNOLOGY CENTER
    SECURITY SYSTEM RECORDER.
  • $704 - Wednesday the 25th of July 2012
    Public Buildings Service
    GSA/PBS
    HIRSH PANELS
  • $6,568 - Monday the 17th of December 2012
    Public Buildings Service
    GSA/PBS
    IGF::OT::IGF PROVIDE AND INSTALL OCCUPANCY SENSORS

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.