The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Pacific North Llc

  • Pacific North Llc

  • View government funding actions
  • Payson, UT 846515117
  • Phone: 801-358-0679
  • Estimated Number of Employees: 10
  • Estimated Annual Receipts: $2,500,000
  • Business Start Date: 2009
  • Contact Person: Ammon Grant
  • Contact Phone: 801-358-0679
  • Contact Email: arcgrant@pacific-north.com
  • Business Structure:
  • Partnership or Limited Liability Partnership
  • Business Type:
  • For Profit Organization
  • Veteran Owned Business
  • Limited Liability f
  • Service Disabled Veteran Owned Business
  • Industries Served: Commercial and Institutional Building Construction, Water and Sewer Line and Related Structures Construction, Roofing Contractors, Other Foundation, Structure, and Building Exterior Contractors, Plumbing, Heating, and Air-Conditioning Contractors, Site Preparation Contractors, All Other Specialty Trade Contractors, Power Boiler and Heat Exchanger Manufacturing, Machine Tool Manufacturing, Welding and Soldering Equipment Manufacturing, Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables, Totalizing Fluid Meter and Counting Device Manufacturing, Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals, Industrial and Personal Service Paper Merchant Wholesalers, Pipeline Transportation of Natural Gas, Computer Systems Design Services
  • Product Areas: RIGGING AND RIGGING GEAR, ELECTRIC ARC WELDING EQUIPMENT, GAS WELDING, HEAT CUTTING, AND METALIZING EQUIPMENT, GAS WELD HEAT CUT - METALIZING EQ, MISCELLANEOUS WELDING EQUIPMENT, BLOCKS, TACKLE, RIGGING, AND SLINGS, PLUMBING FIXTURES AND ACCESSORIES, INSTALL OF PUMPS & COMPRESSORS, INSTALLATION OF EQUIPMENT- PUMPS AND COMPRESSORS, INSTALLATION OF EQUIPMENT- PIPE, TUBING, HOSE, AND FITTINGS, INSTALL OF PIPE-TUBING-HOSE, INSTALLATION OF EQUIPMENT: VALVES, INSTALLATION OF EQUIPMENT- VALVES, CONSTRUCTION OF SCHOOLS, CONSTRUCTION OF HOSPITALS AND INFIRMARIES, CONSTRUCTION OF LABORATORIES AND CLINICS, CONSTRUCTION OF OTHER HOSPITAL BUILDINGS, CONSTRUCTION OF MAINTENANCE BUILDINGS

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $96,729 - Thursday the 27th of September 2012
    Veterans Affairs Department
    436-FORT HARRISON
    CONVERT TO LOW PRESSURE STEAM PHASE 2 PROJECT FOR FORT HARRISON MONTANA 436-11-101
  • $8,914 - Tuesday the 5th of June 2012
    Veterans Affairs Department
    259-NETWORK CONTRACT OFFICE 19
    BOILER RENTAL
  • $74,589 - Tuesday the 11th of September 2012
    Veterans Affairs Department
    259-NETWORK CONTRACT OFFICE 19
    DESIGN-BUILD PARKING STRUCTURE SALT LAKE CITY VA
  • $6,228 - Wednesday the 14th of March 2012
    Veterans Affairs Department
    436-FORT HARRISON
    CORRECT FCA DEFICIENCIES PHASE 3 FOR FORT HARRISON VAMC.
  • $5,917 - Saturday the 11th of August 2012
    Veterans Affairs Department
    259-NETWORK CONTRACT OFFICE 19
    EMERGENCY FRONT ENTRANCE REPAIR AT THE FORT HARRISON VAMC.
  • $4,937 - Thursday the 2nd of February 2012
    Veterans Affairs Department
    259-NETWORK CONTRACT OFFICE 19
    BOILER RENTAL
  • $493,194 - Tuesday the 31st of January 2012
    Veterans Affairs Department
    259-NETWORK CONTRACT OFFICE 19
    B2 RENOVATIONS FOR VMAC SLC
  • $45,318 - Friday the 28th of September 2012
    Veterans Affairs Department
    259-NETWORK CONTRACT OFFICE 19
    B2 RENOVATIONS FOR VMAC SLC
  • $3,400 - Monday the 10th of June 2013
    Veterans Affairs Department
    259-NETWORK CONTRACT OFFICE 19
    B2 RENOVATIONS FOR VMAC SLC
  • $312,055 - Friday the 10th of February 2012
    Veterans Affairs Department
    259-NETWORK CONTRACT OFFICE 19
    DESIGN-BUILD PARKING STRUCTURE SALT LAKE CITY VA

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.