The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Pacific Program Design Management Services Jv

  • Pacific Program Design Management Services Jv

  • View government funding actions
  • Pasadena, CA 911240001
  • Phone:
  • Estimated Number of Employees: 300
  • Estimated Annual Receipts: $50,000,000
  • Business Start Date: 2008
  • Contact Person: Michael White
  • Contact Phone: 626-440-3301
  • Contact Email: michael.r.white@parsons.com
  • Business Structure:
  • Partnership or Limited Liability Partnership
  • Business Type:
  • For Profit Organization
  • Industries Served: Nursery and Tree Production, Forest Nurseries and Gathering of Forest Products, Support Activities for Oil and Gas Operations, Support Activities for Coal Mining, Support Activities for Metal Mining, Support Activities for Nonmetallic Minerals (except Fuels) Mining, Water Supply and Irrigation Systems, Sewage Treatment Facilities, Residential Remodelers, Industrial Building Construction, Commercial and Institutional Building Construction, Water and Sewer Line and Related Structures Construction, Oil and Gas Pipeline and Related Structures Construction, Highway, Street, and Bridge Construction, Other Heavy and Civil Engineering Construction, Site Preparation Contractors, Professional, Scientific, and Technical Services
  • Product Areas: INSTALL OF MECH POWER TRANS EQ, INSTALLATION OF EQUIPMENT- MECHANICAL POWER TRANSMISSION EQUIPMENT

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $770,398 - Friday the 17th of February 2012
    Department Of Navy
    NAVFAC ENGINEERING COMMAND MARIANAS
    TASK ORDER AWARDED FOR ARCHITECT-ENGINEERING SERVICES TO PROVIDE CLOSURE DESIGNS AND PLANS TO THE DRAFT 35% LEVEL FOR MUNICIPAL SOLID WASTE LANDFILLS AT ANDERSEN AIR FORCE BASE (AAFB) AND NAVAL BASE GUAM (NBG). THIS MODIFICATION IS TO AWARD OPTION ITEM 1 FOR 100% CLOSURE DESIGN OF THE AAFB LANDFILL AND TO AWARD OPTION ITEM 2 FOR 100% CLOSURE DESIGN OF THE NBG LANDFILL. OPTION ITEMS ARE PRE-PRICED NEGOTIATED AMOUNTS.
  • $59,998 - Thursday the 22nd of March 2012
    Department Of Navy
    NAVAL FAC ENGINEEERING CMD PACIFIC
    DPRI, REV AMEND 56 FOR ADDITIONAL POST CONSTRUCTION AWARD SERVICES FOR JFY09 J-001 GUAM UTILITIES AND SITE IMPROVEMENTS - PH I, APRA HARBOR, GUAM
  • $5,355 - Tuesday the 17th of April 2012
    Department Of Navy
    NAVAL FAC ENGINEEERING CMD PACIFIC
    CONTRACT N62742-08-D-0009, TASK ORDER 0029, MOD 02, TO INCORPORATE TRAVEL TO GUAM. TASK ORDER 0029 IS FOR GIS SUPPORT.
  • $3,745 - Monday the 30th of July 2012
    Department Of Navy
    NAVAL FAC ENGINEEERING CMD PACIFIC
    PROVIDE MAPPING AND GIS SUPPORT FOR DPRI.
  • $354,634 - Tuesday the 21st of August 2012
    Department Of Navy
    NAVAL FAC ENGINEEERING CMD PACIFIC
    CONTRACT N62742-08-D-0009, TASK ORDER 0032, FOR GIS SUPPORT SERVICES FOR THE PERIOD 30 SEPTEMBER 2012 TO 29 SEPTEMBER 2013.
  • $326,851 - Friday the 21st of October 2011
    Department Of Navy
    NAVAL FAC ENGINEEERING CMD PACIFIC
    DPRI, REVISED AMENDMENT NO. 55, PCAS FOR JFY09 J-001 GUAM UTILITIES AND SITE IMPROVEMENTS - PHASE 1, APRA HARBOR, GUAM. 3RD OPTION YEAR - FIXED PRICE
  • $27,638 - Friday the 24th of August 2012
    Department Of Navy
    NAVFAC ENGINEERING COMMAND MARIANAS
    WON 1145286, JOINT BASE LANDFILL CLOSURES, AAFB AND NBG APRA HARBOR. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ADDITIVE AND DEDUCTIVE CHANGES TO THE STATEMENT OF A-E SERVICES FOR SURVEY, BORROW SOIL STUDIES, GAS MONITORING WELLS, UXO EFFORTS, VEGETATION CLEARING, AND DD1391 DOCUMENTATION.
  • $258,947 - Friday the 10th of July 2015
    Department Of Navy
    NAVFAC ENGINEERING COMMAND MARIANAS
    WON 1297139, SOLID WASTE MANAGEMENT (SWM) ALTERNATIVES, NAVAL BASE GUAM. A-E SHALL PROVIDE ARCHITECT-ENGINEERING SERVICES TO ANALYZE DIFFERENT ALTERNATIVES FOR DISPOSING OF THE NAVY S MUNICIPAL SOLID WASTE (MSW) ON GUAM. A-E SHALL PREPARE A SITE DEVELOPMENT PLAN TO LINE AND MINE (LM) EXISTING MSW AT THE NBG LANDFILL AND PREPARE DD FORM 1391/1391C AND SUPPORTING DOCUMENTATION FOR LM CONCEPT. SERVICES SHALL BE IN ACCORDANCE WITH THE REVISED STATEMENT OF A-E SERVICES DATED 20 SEPTEMBER 2012.
  • $163,192 - Friday the 30th of March 2012
    Department Of Navy
    NAVAL FAC ENGINEEERING CMD PACIFIC
    CONTRACT N62742-08-D-0009, TASK ORDER 0031, FOR MARINE WING LIAISON KADENA (MWLK) FACILITIES CHARRETTE/STUDY
  • $13,539 - Wednesday the 29th of August 2012
    Department Of Navy
    NAVAL FAC ENGINEERING CMD FAR EAST
    THE A-E SHALL PROVIDE ENGINEERING SERVICES TO PREPARE MARINE CORPS. FEC TEAM FINAL 1391 DOCUMENTATION IN SUPPORT OF JOINT STRIKE FIGHTER (JSF) READY FOR OPERATIONS (RFO) REQUIREMENTS AT MCAS IWAKUNI, JAPAN. THE PURPOSE OF THIS TASK ORDER BI-LATERAL MODIFICATION IS TO ADD A SR. PROJECT MANAGER (EITHER ELECTRICAL OR MECHANICAL DISCIPLINE) TO ATTEND THE 60% SUBMITTAL REVIEW MEETING. THIS TASK ORDER MODIFICATION IS IN-SCOPE.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.