The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Pedro Falcon Electrical Contractors Inc dba Falcon Pedro

  • Pedro Falcon Electrical Contractors Inc dba Falcon Pedro

  • View government funding actions
  • Big Pine Key, FL 330434516
  • Phone:
  • Estimated Number of Employees: 34
  • Estimated Annual Receipts: $8,640,330
  • Business Start Date: 1985
  • Contact Person: Christian Brisson
  • Contact Phone: 305-872-2200
  • Contact Email: cb@pedrofalcon.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Subchapter S Corporation
  • Industries Served: Industrial Building Construction, Commercial and Institutional Building Construction, Water and Sewer Line and Related Structures Construction, Oil and Gas Pipeline and Related Structures Construction, Power and Communication Line and Related Structures Construction, Highway, Street, and Bridge Construction, Other Heavy and Civil Engineering Construction, Poured Concrete Foundation and Structure Contractors, Structural Steel and Precast Concrete Contractors, Masonry Contractors, Roofing Contractors, Other Foundation, Structure, and Building Exterior Contractors, Electrical Contractors and Other Wiring Installation Contractors, Plumbing, Heating, and Air-Conditioning Contractors, Other Building Equipment Contractors, Drywall and Insulation Contractors, Construction
  • Product Areas: ELECTRICAL CONTROL EQUIPMENT, GENERATORS AND GENERATOR SETS, ELECTRICAL, GENERATORS & GENERATOR SETS ELECT, SOLAR ELECTRIC POWER SYSTEMS, TRANSFORMERS: DISTRIBUTION AND POWER STATION, TRANSFORMERS - DISTRIB & POWER STA, WIRE AND CABLE, ELECTRICAL, MISCELLANEOUS ELECTRIC POWER AND DISTRIBUTION EQUIPMENT, MISC ELECTRIC POWER & DISTRIB EQ

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $6,406 - Wednesday the 18th of April 2012
    Department Of Air Force
    FA4814 6 CONS LGCP
    THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO: A. CREATE CLIN 0005 TO ADD $6,406 FOR MINOR CONSTRUCTION. B. INCORPORATE NEW WORK (ADDENDUM 01) INTO THE ATTACHED STATEMENT OF WORK DATED 10 APRIL 2012. C. DESIGN PHASE 1 HAS BEEN CHANGED FROM 05 OCT 2011¿ 07 FEB 2012 TO 05 OCT 2011¿ 10 MAY 2012; CONSTRUCTION PHASE 2 HAS BEEN CHANGED FROM 08 FEB 2012¿ 28 MAY 2012 TO 11 MAY 2012¿ 29 AUG 2012 D. NO ADDITIONAL CONSIDERATION IS OWED BY THE CONTRACTOR. E. RELEASE OF CLAIMS: IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENTS FOR THE CHANGES HEREIN, THE CONTRACTOR, BY ITS SIGNATURE ON THE STANDARD FORM 30 HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY UNDER THIS CONTRACT FOR ANY FURTHER EQUABLE ADJUSTMENTS ATTRIBUTABLE TO SAID CHANGES.
  • $6,054 - Wednesday the 15th of May 2013
    Public Buildings Service
    ACQUISITION DIVISION/SMALL PROJECTS
    USAF 7TH FL TIMBERLAKE TAMPA FL CHANGE WITHIN SCOPE FOR PCO 11 AND 18
  • $593,492 - Friday the 28th of September 2012
    Department Of Air Force
    FA4814 6 CONS LGCP
    PROVIDE DESIGN AND CONSTRUCTION FOR PROJECT 11-0169, REPAIR CDC CAMPUS.
  • $552,060 - Friday the 14th of September 2012
    Public Buildings Service
    ACQUISITION DIVISION/SMALL PROJECTS
    NAVY DESIGN BUILD 9TH FL TIMBERLAKE TAMPA FL
  • $498,926 - Wednesday the 29th of August 2012
    Public Buildings Service
    ACQUISITION DIVISION/SMALL PROJECTS
    USMS CELL BLOCK RENOVATION AT THE PAUL G. ROGERS FEDERAL COURTHOUSE, WEST PALM BEACH, FLORIDA
  • $41,915 - Tuesday the 25th of September 2012
    Department Of Air Force
    FA4814 6 CONS LGCP
    MODIFICATION #01 IS FOR THE GOVERNMENT TO ACCEPT BID OPTION #1.
  • $37,727 - Tuesday the 8th of May 2012
    Department Of Air Force
    FA4814 6 CONS LGCP
    THE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDS DUE TO UNFORSEEN SITE CONDITIONS. A. ADDED CLIN 0003 AND INCREASED TOTAL CONTRACT VALUE BY $ 37,727.42 FROM $199,050.92 TO $236,778.34 B. EXTEND THE POP ASSOCIATED WITH CLIN 0003 FROM 3 FEB 2012 - 27 APR 2012 TO 3 FEB 12 - 27 JUL 2012 C. FAR CLAUSE 52.211-10 HAS CHANGED TO REFLECT THE NEW ENDING DATE OF 27 JUL 2012 D. NO ADDITIONAL CONSIDERATION IS OWED BY THE CONTRACTOR. E. RELEASE OF CLAIMS: IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENTS FOR THE CHANGES HEREIN, THE CONTRACTOR, BY ITS SIGNATURE ON THE STANDARD FORM 30 HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY UNDER THIS CONTRACT FOR ANY FURTHER EQUABLE ADJUSTMENTS ATTRIBUTABLE TO SAID CHANGES.
  • $338,130 - Tuesday the 7th of August 2012
    Department Of Air Force
    FA4814 6 CONS LGCP
    PROVIDE DESIGN AND CONSTRUCTION IN ORDER TO REPAIR SOCOM HVAC IN RM 1184, B501.
  • $322,813 - Thursday the 27th of September 2012
    Department Of Air Force
    FA4814 6 CONS LGCP
    PHASE II - CONSTRUCTION, ASPR 01-0163 RUNWAY REPAIR
  • $29,998 - Tuesday the 7th of August 2012
    Department Of Air Force
    FA4814 6 CONS LGCP
    PROVIDE/INSTALL CATHODIC PIPING PROTECTION

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.