The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Re Staite Engineering Inc

  • Contact Person: Walter Jellison
  • Contact Phone: 619-233-0178
  • Contact Email: restaite@aol.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Subchapter S Corporation
  • Industries Served: Construction Sand and Gravel Mining, Industrial Sand Mining, Commercial and Institutional Building Construction, Oil and Gas Pipeline and Related Structures Construction, Highway, Street, and Bridge Construction, Other Heavy and Civil Engineering Construction, Poured Concrete Foundation and Structure Contractors, Structural Steel and Precast Concrete Contractors, Other Foundation, Structure, and Building Exterior Contractors, Site Preparation Contractors, All Other Specialty Trade Contractors, Wood Preservation, Custom Compounding of Purchased Resins, Polystyrene Foam Product Manufacturing, Urethane and Other Foam Product (except Polystyrene) Manufacturing, All Other Plastics Product Manufacturing
  • Product Areas: IT AND TELECOM- SYSTEMS DEVELOPMENT, ADP SYSTEMS DEVELOPMENT SERVICES, PROGRAMMING SERVICES, IT AND TELECOM- PROGRAMMING

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $8,639,300 - Friday the 28th of September 2012
    Department Of Army
    W075 ENDIST SAN FRAN
    RICHMOND INNER HARBOR CHANNEL MAINTENANCE DREDGING PROJECT
  • $6,387,640 - Saturday the 24th of March 2012
    Department Of Army
    W075 ENDIST LOS ANGELES
    NEWPORT BAY DREDGE
  • $5,000 - Tuesday the 1st of May 2012
    Department Of Navy
    NAVFAC SOUTHWEST
    WATERFRONT II MACC
  • $357,814 - Tuesday the 21st of August 2012
    Department Of Navy
    NAVFAC SOUTHWEST
    MAINT DREDGING FOR NBC
  • $3,184,068 - Monday the 17th of September 2012
    Department Of Army
    W075 ENDIST LOS ANGELES
    CONTRACT FOR LOWER NEW PORT BAY MAINTENANCE DREDGING AT CITY NEWPORT BEACH/ORANGE COUNTY. REFERENCE NO. R00001, INCREASE $3,184,067.50, WN002 ADDITIONAL DREDGING. THE CONTRACT COMPLETION DATE SHALL BE EXTENDED BY 150 CALENDARE DAYS BY REASON OF THIS MODIFICATION.
  • $2,282,200 - Friday the 14th of September 2012
    Department Of Navy
    NAVFAC SOUTHWEST
    REPLACE FENDER&CAMEL JEWLERY PIERS 1-10&13 AND QUAY WALLS NAVAL BASE SAN DIEGO, CALIFORNIA
  • $138,500 - Tuesday the 11th of September 2012
    Department Of Navy
    NAVFAC SOUTHWEST
    CONCORD PIERS 3&4 REPAIR

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.