The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Raytheon Company dba Raytheon

  • Contact Person: Bart Hogan
  • Contact Phone: 978-436-8150
  • Contact Email: bhogan@raytheon.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Manufacturer of Goods
  • Industries Served: Engineering Services, Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
  • Product Areas: R&D- DEFENSE OTHER: CONSTRUCTION (ENGINEERING DEVELOPMENT), CONSTRUCTION (ENGINEERING), R&D- OTHER TRANSPORTATION: HIGHWAYS, ROADS, AND BRIDGES (ENGINEERING DEVELOPMENT), R&D-TRANS-ROADS-BRIDGES-ENG DEV, R&D-SURFACE MINING EQ-ENG DEV, R&D- MINING: SURFACE MINING EQUIPMENT (ENGINEERING DEVELOPMENT)

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $8,502,442 - Friday the 10th of July 2015
    National Aeronautics And Space Administration
    JOHNSON SPACE CENTER
    NEUTRAL BUOYANCY LABORATORY (NBL)/ SPACE VEHICLE MOCKUP FACILITY (SVMF) OPERATIONS CONTRACT (NSOC)THE CONTRACTOR SHALL PROVIDE ALL RESOURCES AND SERVICES (EXCEPT AS MAY BE EXPRESSLY STATED IN THIS CONTRACT AS FURNISHED BY THE GOVERNMENT) NECESSARY TO OPERATE, MAINTAIN, AND PROVIDE SUSTAINING ENGINEERING FOR THE NEUTRAL BUOYANCY LABORATORY, THE SPACE VEHICLE MOCKUP FACILITY, AND THE LOGISTICS AND MOCKUP FACILITY. IN ADDITION THE CONTRACTOR SHALL PROVIDE ALL RESOURCES AND SERVICES (EXCEPT AS MAY BE EXPRESSLY STATED IN THIS CONTRACT AS FURNISHED BY THE GOVERNMENT) NECESSARY TO PERFORM PHASE-IN PERIOD ACTIVITIES, IN ACCORDANCE WITH THE PHASE-IN PLAN. THE NEUTRAL BUOYANCY LABORATORY (NBL) AND SPACE VEHICLE MOCKUP FACILITY (SVMF) ARE KEY AGENCY ASSETS THAT SUPPORT HUMAN SPACE FLIGHT TRAINING AND OPERATIONS. BOTH FACILITIES SUPPORT THE SPACE SHUTTLE, INTERNATIONAL SPACE STATION (ISS) AND OTHER FUTURE SPACE PROGRAMS. BOTH ARE OPERATED BY JSC S MISSION OPERATIONS DIRECTORATE (MOD). THE NBL SVMF OPERATIONS CONTRACT (NSOC) SPECIFIES TECHNICAL, MANAGERIAL, AND ADMINISTRATIVE WORK NEEDED TO ENSURE THE AVAILABILITY, INTEGRITY, AND RELIABILITY OF MISSION OPERATIONS FACILITIES SUPPORTING NASA HUMAN SPACEFLIGHT PROGRAMS REQUIRING MISSION OPERATIONS SUPPORT. FOR THIS CONTRACT, FACILITY IS DEFINED AS THE SYSTEMS AND SUBSYSTEMS OF INTEGRATED HARDWARE AND SOFTWARE USED IN THE PREPARATION FOR AND PERFORMANCE OF MISSION OPERATIONS. THE TERM FACILITY DOES NOT REFER TO BRICK AND MORTAR BUILDINGS OR BUILDING FUNCTIONS, SUCH AS LIGHTING, ENVIRONMENTAL CONTROL, AND JANITORIAL SERVICES. THE OBJECTIVES OF THIS CONTRACT ARE TO: ACQUIRE SUPPORT (LABOR AND EXPERTISE) TO ENSURE THE CONTINUING SAFE OPERATION OF THE FACILITIES. INCREASE OPPORTUNITIES FOR SYNERGY ACROSS ALL FUNCTIONS, PROCESSES AND SYSTEMS. NASA WILL COLLABORATE WITH THE CONTRACTOR ON DEVELOPING TECHNICAL AND PROCEDURAL INNOVATIONS THAT IMPROVE SAFETY, ENHANCE QUALITY, ENSURE USER SATISFACTION, AND REDUCE COST. PROVIDE COST SAVINGS TO MOD BY DEVELOPING EXTERNAL CUSTOMER UTILIZATION OF CURRENT AND FUTURE EXCESS CAPACITY IN THE FACILITIES.
  • $614,149 - Wednesday the 14th of November 2012
    National Aeronautics And Space Administration
    JOHNSON SPACE CENTER
    NEUTRAL BOUYANCY LAB/SPACE VEHICLE MOCKUP FACILITY OPERATIONS
  • $5,968,219 - Friday the 10th of July 2015
    National Aeronautics And Space Administration
    JOHNSON SPACE CENTER
    NEUTRAL BUOYANCY LABORATORY (NBL)/ SPACE VEHICLE MOCKUP FACILITY (SVMF) OPERATIONS CONTRACT (NSOC)THE CONTRACTOR SHALL PROVIDE ALL RESOURCES AND SERVICES (EXCEPT AS MAY BE EXPRESSLY STATED IN THIS CONTRACT AS FURNISHED BY THE GOVERNMENT) NECESSARY TO OPERATE, MAINTAIN, AND PROVIDE SUSTAINING ENGINEERING FOR THE NEUTRAL BUOYANCY LABORATORY, THE SPACE VEHICLE MOCKUP FACILITY, AND THE LOGISTICS AND MOCKUP FACILITY. IN ADDITION THE CONTRACTOR SHALL PROVIDE ALL RESOURCES AND SERVICES (EXCEPT AS MAY BE EXPRESSLY STATED IN THIS CONTRACT AS FURNISHED BY THE GOVERNMENT) NECESSARY TO PERFORM PHASE-IN PERIOD ACTIVITIES, IN ACCORDANCE WITH THE PHASE-IN PLAN. THE NEUTRAL BUOYANCY LABORATORY (NBL) AND SPACE VEHICLE MOCKUP FACILITY (SVMF) ARE KEY AGENCY ASSETS THAT SUPPORT HUMAN SPACE FLIGHT TRAINING AND OPERATIONS. BOTH FACILITIES SUPPORT THE SPACE SHUTTLE, INTERNATIONAL SPACE STATION (ISS) AND OTHER FUTURE SPACE PROGRAMS. BOTH ARE OPERATED BY JSC S MISSION OPERATIONS DIRECTORATE (MOD). THE NBL SVMF OPERATIONS CONTRACT (NSOC) SPECIFIES TECHNICAL, MANAGERIAL, AND ADMINISTRATIVE WORK NEEDED TO ENSURE THE AVAILABILITY, INTEGRITY, AND RELIABILITY OF MISSION OPERATIONS FACILITIES SUPPORTING NASA HUMAN SPACEFLIGHT PROGRAMS REQUIRING MISSION OPERATIONS SUPPORT. FOR THIS CONTRACT, FACILITY IS DEFINED AS THE SYSTEMS AND SUBSYSTEMS OF INTEGRATED HARDWARE AND SOFTWARE USED IN THE PREPARATION FOR AND PERFORMANCE OF MISSION OPERATIONS. THE TERM FACILITY DOES NOT REFER TO BRICK AND MORTAR BUILDINGS OR BUILDING FUNCTIONS, SUCH AS LIGHTING, ENVIRONMENTAL CONTROL, AND JANITORIAL SERVICES. THE OBJECTIVES OF THIS CONTRACT ARE TO: ACQUIRE SUPPORT (LABOR AND EXPERTISE) TO ENSURE THE CONTINUING SAFE OPERATION OF THE FACILITIES. INCREASE OPPORTUNITIES FOR SYNERGY ACROSS ALL FUNCTIONS, PROCESSES AND SYSTEMS. NASA WILL COLLABORATE WITH THE CONTRACTOR ON DEVELOPING TECHNICAL AND PROCEDURAL INNOVATIONS THAT IMPROVE SAFETY, ENHANCE QUALITY, ENSURE USER SATISFACTION, AND REDUCE COST. PROVIDE COST SAVINGS TO MOD BY DEVELOPING EXTERNAL CUSTOMER UTILIZATION OF CURRENT AND FUTURE EXCESS CAPACITY IN THE FACILITIES.
  • $523,120 - Friday the 10th of July 2015
    National Aeronautics And Space Administration
    JOHNSON SPACE CENTER
    NEUTRAL BUOYANCY LABORATORY (NBL)/ SPACE VEHICLE MOCKUP FACILITY (SVMF) OPERATIONS CONTRACT (NSOC)THE CONTRACTOR SHALL PROVIDE ALL RESOURCES AND SERVICES (EXCEPT AS MAY BE EXPRESSLY STATED IN THIS CONTRACT AS FURNISHED BY THE GOVERNMENT) NECESSARY TO OPERATE, MAINTAIN, AND PROVIDE SUSTAINING ENGINEERING FOR THE NEUTRAL BUOYANCY LABORATORY, THE SPACE VEHICLE MOCKUP FACILITY, AND THE LOGISTICS AND MOCKUP FACILITY. IN ADDITION THE CONTRACTOR SHALL PROVIDE ALL RESOURCES AND SERVICES (EXCEPT AS MAY BE EXPRESSLY STATED IN THIS CONTRACT AS FURNISHED BY THE GOVERNMENT) NECESSARY TO PERFORM PHASE-IN PERIOD ACTIVITIES, IN ACCORDANCE WITH THE PHASE-IN PLAN. THE NEUTRAL BUOYANCY LABORATORY (NBL) AND SPACE VEHICLE MOCKUP FACILITY (SVMF) ARE KEY AGENCY ASSETS THAT SUPPORT HUMAN SPACE FLIGHT TRAINING AND OPERATIONS. BOTH FACILITIES SUPPORT THE SPACE SHUTTLE, INTERNATIONAL SPACE STATION (ISS) AND OTHER FUTURE SPACE PROGRAMS. BOTH ARE OPERATED BY JSC S MISSION OPERATIONS DIRECTORATE (MOD). THE NBL SVMF OPERATIONS CONTRACT (NSOC) SPECIFIES TECHNICAL, MANAGERIAL, AND ADMINISTRATIVE WORK NEEDED TO ENSURE THE AVAILABILITY, INTEGRITY, AND RELIABILITY OF MISSION OPERATIONS FACILITIES SUPPORTING NASA HUMAN SPACEFLIGHT PROGRAMS REQUIRING MISSION OPERATIONS SUPPORT. FOR THIS CONTRACT, FACILITY IS DEFINED AS THE SYSTEMS AND SUBSYSTEMS OF INTEGRATED HARDWARE AND SOFTWARE USED IN THE PREPARATION FOR AND PERFORMANCE OF MISSION OPERATIONS. THE TERM FACILITY DOES NOT REFER TO BRICK AND MORTAR BUILDINGS OR BUILDING FUNCTIONS, SUCH AS LIGHTING, ENVIRONMENTAL CONTROL, AND JANITORIAL SERVICES. THE OBJECTIVES OF THIS CONTRACT ARE TO: ACQUIRE SUPPORT (LABOR AND EXPERTISE) TO ENSURE THE CONTINUING SAFE OPERATION OF THE FACILITIES. INCREASE OPPORTUNITIES FOR SYNERGY ACROSS ALL FUNCTIONS, PROCESSES AND SYSTEMS. NASA WILL COLLABORATE WITH THE CONTRACTOR ON DEVELOPING TECHNICAL AND PROCEDURAL INNOVATIONS THAT IMPROVE SAFETY, ENHANCE QUALITY, ENSURE USER SATISFACTION, AND REDUCE COST. PROVIDE COST SAVINGS TO MOD BY DEVELOPING EXTERNAL CUSTOMER UTILIZATION OF CURRENT AND FUTURE EXCESS CAPACITY IN THE FACILITIES.
  • $410,483 - Friday the 10th of July 2015
    National Aeronautics And Space Administration
    JOHNSON SPACE CENTER
    NEUTRAL BUOYANCY LABORATORY (NBL)/ SPACE VEHICLE MOCKUP FACILITY (SVMF) OPERATIONS CONTRACT (NSOC)THE CONTRACTOR SHALL PROVIDE ALL RESOURCES AND SERVICES (EXCEPT AS MAY BE EXPRESSLY STATED IN THIS CONTRACT AS FURNISHED BY THE GOVERNMENT) NECESSARY TO OPERATE, MAINTAIN, AND PROVIDE SUSTAINING ENGINEERING FOR THE NEUTRAL BUOYANCY LABORATORY, THE SPACE VEHICLE MOCKUP FACILITY, AND THE LOGISTICS AND MOCKUP FACILITY. IN ADDITION THE CONTRACTOR SHALL PROVIDE ALL RESOURCES AND SERVICES (EXCEPT AS MAY BE EXPRESSLY STATED IN THIS CONTRACT AS FURNISHED BY THE GOVERNMENT) NECESSARY TO PERFORM PHASE-IN PERIOD ACTIVITIES, IN ACCORDANCE WITH THE PHASE-IN PLAN. THE NEUTRAL BUOYANCY LABORATORY (NBL) AND SPACE VEHICLE MOCKUP FACILITY (SVMF) ARE KEY AGENCY ASSETS THAT SUPPORT HUMAN SPACE FLIGHT TRAINING AND OPERATIONS. BOTH FACILITIES SUPPORT THE SPACE SHUTTLE, INTERNATIONAL SPACE STATION (ISS) AND OTHER FUTURE SPACE PROGRAMS. BOTH ARE OPERATED BY JSC S MISSION OPERATIONS DIRECTORATE (MOD). THE NBL SVMF OPERATIONS CONTRACT (NSOC) SPECIFIES TECHNICAL, MANAGERIAL, AND ADMINISTRATIVE WORK NEEDED TO ENSURE THE AVAILABILITY, INTEGRITY, AND RELIABILITY OF MISSION OPERATIONS FACILITIES SUPPORTING NASA HUMAN SPACEFLIGHT PROGRAMS REQUIRING MISSION OPERATIONS SUPPORT. FOR THIS CONTRACT, FACILITY IS DEFINED AS THE SYSTEMS AND SUBSYSTEMS OF INTEGRATED HARDWARE AND SOFTWARE USED IN THE PREPARATION FOR AND PERFORMANCE OF MISSION OPERATIONS. THE TERM FACILITY DOES NOT REFER TO BRICK AND MORTAR BUILDINGS OR BUILDING FUNCTIONS, SUCH AS LIGHTING, ENVIRONMENTAL CONTROL, AND JANITORIAL SERVICES. THE OBJECTIVES OF THIS CONTRACT ARE TO: ACQUIRE SUPPORT (LABOR AND EXPERTISE) TO ENSURE THE CONTINUING SAFE OPERATION OF THE FACILITIES. INCREASE OPPORTUNITIES FOR SYNERGY ACROSS ALL FUNCTIONS, PROCESSES AND SYSTEMS. NASA WILL COLLABORATE WITH THE CONTRACTOR ON DEVELOPING TECHNICAL AND PROCEDURAL INNOVATIONS THAT IMPROVE SAFETY, ENHANCE QUALITY, ENSURE USER SATISFACTION, AND REDUCE COST. PROVIDE COST SAVINGS TO MOD BY DEVELOPING EXTERNAL CUSTOMER UTILIZATION OF CURRENT AND FUTURE EXCESS CAPACITY IN THE FACILITIES.
  • $354,619 - Friday the 10th of July 2015
    National Aeronautics And Space Administration
    JOHNSON SPACE CENTER
    NEUTRAL BUOYANCY LABORATORY (NBL)/ SPACE VEHICLE MOCKUP FACILITY (SVMF) OPERATIONS CONTRACT (NSOC)THE CONTRACTOR SHALL PROVIDE ALL RESOURCES AND SERVICES (EXCEPT AS MAY BE EXPRESSLY STATED IN THIS CONTRACT AS FURNISHED BY THE GOVERNMENT) NECESSARY TO OPERATE, MAINTAIN, AND PROVIDE SUSTAINING ENGINEERING FOR THE NEUTRAL BUOYANCY LABORATORY, THE SPACE VEHICLE MOCKUP FACILITY, AND THE LOGISTICS AND MOCKUP FACILITY. IN ADDITION THE CONTRACTOR SHALL PROVIDE ALL RESOURCES AND SERVICES (EXCEPT AS MAY BE EXPRESSLY STATED IN THIS CONTRACT AS FURNISHED BY THE GOVERNMENT) NECESSARY TO PERFORM PHASE-IN PERIOD ACTIVITIES, IN ACCORDANCE WITH THE PHASE-IN PLAN. THE NEUTRAL BUOYANCY LABORATORY (NBL) AND SPACE VEHICLE MOCKUP FACILITY (SVMF) ARE KEY AGENCY ASSETS THAT SUPPORT HUMAN SPACE FLIGHT TRAINING AND OPERATIONS. BOTH FACILITIES SUPPORT THE SPACE SHUTTLE, INTERNATIONAL SPACE STATION (ISS) AND OTHER FUTURE SPACE PROGRAMS. BOTH ARE OPERATED BY JSC S MISSION OPERATIONS DIRECTORATE (MOD). THE NBL SVMF OPERATIONS CONTRACT (NSOC) SPECIFIES TECHNICAL, MANAGERIAL, AND ADMINISTRATIVE WORK NEEDED TO ENSURE THE AVAILABILITY, INTEGRITY, AND RELIABILITY OF MISSION OPERATIONS FACILITIES SUPPORTING NASA HUMAN SPACEFLIGHT PROGRAMS REQUIRING MISSION OPERATIONS SUPPORT. FOR THIS CONTRACT, FACILITY IS DEFINED AS THE SYSTEMS AND SUBSYSTEMS OF INTEGRATED HARDWARE AND SOFTWARE USED IN THE PREPARATION FOR AND PERFORMANCE OF MISSION OPERATIONS. THE TERM FACILITY DOES NOT REFER TO BRICK AND MORTAR BUILDINGS OR BUILDING FUNCTIONS, SUCH AS LIGHTING, ENVIRONMENTAL CONTROL, AND JANITORIAL SERVICES. THE OBJECTIVES OF THIS CONTRACT ARE TO: ACQUIRE SUPPORT (LABOR AND EXPERTISE) TO ENSURE THE CONTINUING SAFE OPERATION OF THE FACILITIES. INCREASE OPPORTUNITIES FOR SYNERGY ACROSS ALL FUNCTIONS, PROCESSES AND SYSTEMS. NASA WILL COLLABORATE WITH THE CONTRACTOR ON DEVELOPING TECHNICAL AND PROCEDURAL INNOVATIONS THAT IMPROVE SAFETY, ENHANCE QUALITY, ENSURE USER SATISFACTION, AND REDUCE COST. PROVIDE COST SAVINGS TO MOD BY DEVELOPING EXTERNAL CUSTOMER UTILIZATION OF CURRENT AND FUTURE EXCESS CAPACITY IN THE FACILITIES.
  • $343,000 - Friday the 10th of July 2015
    National Aeronautics And Space Administration
    JOHNSON SPACE CENTER
    NEUTRAL BUOYANCY LABORATORY (NBL)/ SPACE VEHICLE MOCKUP FACILITY (SVMF) OPERATIONS CONTRACT (NSOC)THE CONTRACTOR SHALL PROVIDE ALL RESOURCES AND SERVICES (EXCEPT AS MAY BE EXPRESSLY STATED IN THIS CONTRACT AS FURNISHED BY THE GOVERNMENT) NECESSARY TO OPERATE, MAINTAIN, AND PROVIDE SUSTAINING ENGINEERING FOR THE NEUTRAL BUOYANCY LABORATORY, THE SPACE VEHICLE MOCKUP FACILITY, AND THE LOGISTICS AND MOCKUP FACILITY. IN ADDITION THE CONTRACTOR SHALL PROVIDE ALL RESOURCES AND SERVICES (EXCEPT AS MAY BE EXPRESSLY STATED IN THIS CONTRACT AS FURNISHED BY THE GOVERNMENT) NECESSARY TO PERFORM PHASE-IN PERIOD ACTIVITIES, IN ACCORDANCE WITH THE PHASE-IN PLAN. THE NEUTRAL BUOYANCY LABORATORY (NBL) AND SPACE VEHICLE MOCKUP FACILITY (SVMF) ARE KEY AGENCY ASSETS THAT SUPPORT HUMAN SPACE FLIGHT TRAINING AND OPERATIONS. BOTH FACILITIES SUPPORT THE SPACE SHUTTLE, INTERNATIONAL SPACE STATION (ISS) AND OTHER FUTURE SPACE PROGRAMS. BOTH ARE OPERATED BY JSC S MISSION OPERATIONS DIRECTORATE (MOD). THE NBL SVMF OPERATIONS CONTRACT (NSOC) SPECIFIES TECHNICAL, MANAGERIAL, AND ADMINISTRATIVE WORK NEEDED TO ENSURE THE AVAILABILITY, INTEGRITY, AND RELIABILITY OF MISSION OPERATIONS FACILITIES SUPPORTING NASA HUMAN SPACEFLIGHT PROGRAMS REQUIRING MISSION OPERATIONS SUPPORT. FOR THIS CONTRACT, FACILITY IS DEFINED AS THE SYSTEMS AND SUBSYSTEMS OF INTEGRATED HARDWARE AND SOFTWARE USED IN THE PREPARATION FOR AND PERFORMANCE OF MISSION OPERATIONS. THE TERM FACILITY DOES NOT REFER TO BRICK AND MORTAR BUILDINGS OR BUILDING FUNCTIONS, SUCH AS LIGHTING, ENVIRONMENTAL CONTROL, AND JANITORIAL SERVICES. THE OBJECTIVES OF THIS CONTRACT ARE TO: ACQUIRE SUPPORT (LABOR AND EXPERTISE) TO ENSURE THE CONTINUING SAFE OPERATION OF THE FACILITIES. INCREASE OPPORTUNITIES FOR SYNERGY ACROSS ALL FUNCTIONS, PROCESSES AND SYSTEMS. NASA WILL COLLABORATE WITH THE CONTRACTOR ON DEVELOPING TECHNICAL AND PROCEDURAL INNOVATIONS THAT IMPROVE SAFETY, ENHANCE QUALITY, ENSURE USER SATISFACTION, AND REDUCE COST. PROVIDE COST SAVINGS TO MOD BY DEVELOPING EXTERNAL CUSTOMER UTILIZATION OF CURRENT AND FUTURE EXCESS CAPACITY IN THE FACILITIES.
  • $33,101 - Friday the 10th of July 2015
    National Aeronautics And Space Administration
    JOHNSON SPACE CENTER
    NEUTRAL BUOYANCY LABORATORY (NBL)/ SPACE VEHICLE MOCKUP FACILITY (SVMF) OPERATIONS CONTRACT (NSOC)THE CONTRACTOR SHALL PROVIDE ALL RESOURCES AND SERVICES (EXCEPT AS MAY BE EXPRESSLY STATED IN THIS CONTRACT AS FURNISHED BY THE GOVERNMENT) NECESSARY TO OPERATE, MAINTAIN, AND PROVIDE SUSTAINING ENGINEERING FOR THE NEUTRAL BUOYANCY LABORATORY, THE SPACE VEHICLE MOCKUP FACILITY, AND THE LOGISTICS AND MOCKUP FACILITY. IN ADDITION THE CONTRACTOR SHALL PROVIDE ALL RESOURCES AND SERVICES (EXCEPT AS MAY BE EXPRESSLY STATED IN THIS CONTRACT AS FURNISHED BY THE GOVERNMENT) NECESSARY TO PERFORM PHASE-IN PERIOD ACTIVITIES, IN ACCORDANCE WITH THE PHASE-IN PLAN. THE NEUTRAL BUOYANCY LABORATORY (NBL) AND SPACE VEHICLE MOCKUP FACILITY (SVMF) ARE KEY AGENCY ASSETS THAT SUPPORT HUMAN SPACE FLIGHT TRAINING AND OPERATIONS. BOTH FACILITIES SUPPORT THE SPACE SHUTTLE, INTERNATIONAL SPACE STATION (ISS) AND OTHER FUTURE SPACE PROGRAMS. BOTH ARE OPERATED BY JSC S MISSION OPERATIONS DIRECTORATE (MOD). THE NBL SVMF OPERATIONS CONTRACT (NSOC) SPECIFIES TECHNICAL, MANAGERIAL, AND ADMINISTRATIVE WORK NEEDED TO ENSURE THE AVAILABILITY, INTEGRITY, AND RELIABILITY OF MISSION OPERATIONS FACILITIES SUPPORTING NASA HUMAN SPACEFLIGHT PROGRAMS REQUIRING MISSION OPERATIONS SUPPORT. FOR THIS CONTRACT, FACILITY IS DEFINED AS THE SYSTEMS AND SUBSYSTEMS OF INTEGRATED HARDWARE AND SOFTWARE USED IN THE PREPARATION FOR AND PERFORMANCE OF MISSION OPERATIONS. THE TERM FACILITY DOES NOT REFER TO BRICK AND MORTAR BUILDINGS OR BUILDING FUNCTIONS, SUCH AS LIGHTING, ENVIRONMENTAL CONTROL, AND JANITORIAL SERVICES. THE OBJECTIVES OF THIS CONTRACT ARE TO: ACQUIRE SUPPORT (LABOR AND EXPERTISE) TO ENSURE THE CONTINUING SAFE OPERATION OF THE FACILITIES. INCREASE OPPORTUNITIES FOR SYNERGY ACROSS ALL FUNCTIONS, PROCESSES AND SYSTEMS. NASA WILL COLLABORATE WITH THE CONTRACTOR ON DEVELOPING TECHNICAL AND PROCEDURAL INNOVATIONS THAT IMPROVE SAFETY, ENHANCE QUALITY, ENSURE USER SATISFACTION, AND REDUCE COST. PROVIDE COST SAVINGS TO MOD BY DEVELOPING EXTERNAL CUSTOMER UTILIZATION OF CURRENT AND FUTURE EXCESS CAPACITY IN THE FACILITIES.
  • $256,000 - Friday the 10th of July 2015
    National Aeronautics And Space Administration
    JOHNSON SPACE CENTER
    NEUTRAL BUOYANCY LABORATORY (NBL)/ SPACE VEHICLE MOCKUP FACILITY (SVMF) OPERATIONS CONTRACT (NSOC)THE CONTRACTOR SHALL PROVIDE ALL RESOURCES AND SERVICES (EXCEPT AS MAY BE EXPRESSLY STATED IN THIS CONTRACT AS FURNISHED BY THE GOVERNMENT) NECESSARY TO OPERATE, MAINTAIN, AND PROVIDE SUSTAINING ENGINEERING FOR THE NEUTRAL BUOYANCY LABORATORY, THE SPACE VEHICLE MOCKUP FACILITY, AND THE LOGISTICS AND MOCKUP FACILITY. IN ADDITION THE CONTRACTOR SHALL PROVIDE ALL RESOURCES AND SERVICES (EXCEPT AS MAY BE EXPRESSLY STATED IN THIS CONTRACT AS FURNISHED BY THE GOVERNMENT) NECESSARY TO PERFORM PHASE-IN PERIOD ACTIVITIES, IN ACCORDANCE WITH THE PHASE-IN PLAN. THE NEUTRAL BUOYANCY LABORATORY (NBL) AND SPACE VEHICLE MOCKUP FACILITY (SVMF) ARE KEY AGENCY ASSETS THAT SUPPORT HUMAN SPACE FLIGHT TRAINING AND OPERATIONS. BOTH FACILITIES SUPPORT THE SPACE SHUTTLE, INTERNATIONAL SPACE STATION (ISS) AND OTHER FUTURE SPACE PROGRAMS. BOTH ARE OPERATED BY JSC S MISSION OPERATIONS DIRECTORATE (MOD). THE NBL SVMF OPERATIONS CONTRACT (NSOC) SPECIFIES TECHNICAL, MANAGERIAL, AND ADMINISTRATIVE WORK NEEDED TO ENSURE THE AVAILABILITY, INTEGRITY, AND RELIABILITY OF MISSION OPERATIONS FACILITIES SUPPORTING NASA HUMAN SPACEFLIGHT PROGRAMS REQUIRING MISSION OPERATIONS SUPPORT. FOR THIS CONTRACT, FACILITY IS DEFINED AS THE SYSTEMS AND SUBSYSTEMS OF INTEGRATED HARDWARE AND SOFTWARE USED IN THE PREPARATION FOR AND PERFORMANCE OF MISSION OPERATIONS. THE TERM FACILITY DOES NOT REFER TO BRICK AND MORTAR BUILDINGS OR BUILDING FUNCTIONS, SUCH AS LIGHTING, ENVIRONMENTAL CONTROL, AND JANITORIAL SERVICES. THE OBJECTIVES OF THIS CONTRACT ARE TO: ACQUIRE SUPPORT (LABOR AND EXPERTISE) TO ENSURE THE CONTINUING SAFE OPERATION OF THE FACILITIES. INCREASE OPPORTUNITIES FOR SYNERGY ACROSS ALL FUNCTIONS, PROCESSES AND SYSTEMS. NASA WILL COLLABORATE WITH THE CONTRACTOR ON DEVELOPING TECHNICAL AND PROCEDURAL INNOVATIONS THAT IMPROVE SAFETY, ENHANCE QUALITY, ENSURE USER SATISFACTION, AND REDUCE COST. PROVIDE COST SAVINGS TO MOD BY DEVELOPING EXTERNAL CUSTOMER UTILIZATION OF CURRENT AND FUTURE EXCESS CAPACITY IN THE FACILITIES.
  • $231,710 - Wednesday the 14th of November 2012
    National Aeronautics And Space Administration
    JOHNSON SPACE CENTER
    NEUTRAL BOUYANCY LAB/SPACE VEHICLE MOCKUP FACILITY OPERATIONS

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.