Rs&h Inc
- View government funding actions
- Merritt Island, FL 32953
- Phone:
- Corporate URL: www.rsandh.com
- Estimated Number of Employees: 650
- Estimated Annual Receipts: $84,000,000
- Business Start Date: 1990
- Contact Person: Richard Hammett
- Contact Phone: 904-256-2399
- Contact Email: Richard.hammett@rsandh.com
- Business Structure:
- Corporate Entity (Not Tax Exempt)
- Business Type:
- For Profit Organization
- Industries Served: Architectural Services, Landscape Architectural Services, Engineering Services, Building Inspection Services, Interior Design Services, Environmental Consulting Services, Other Scientific and Technical Consulting Services
- Product Areas: RADAR EQUIPMENT, EXCEPT AIRBORNE, CABLE CORD WIRE ASSEMBLY - COMM EQ, CABLE, CORD, AND WIRE ASSEMBLIES: COMMUNICATION EQUIPMENT, MSC ELECT & ELECTRONIC COMPONENTS, MISCELLANEOUS ELECTRICAL AND ELECTRONIC COMPONENTS
Sampling of Federal Government Funding Actions/Set Asides
In order by amount of set aside monies.
- $9,604 - Thursday the 8th of January 2015
National Aeronautics And Space Administration
KENNEDY SPACE CENTER
IGF::OT::IGF ARCHITECTURAL&ENGINEERING SERVICES FOR THE STUDY OF LC39B MAIN FLAME DEFLECTOR GEOMETRY CONCEPTS. THE PURPOSE OF MODIFICATION #2 IS TO INCORPORATE HEREIN THE EQUITABLE ADJUSTMENT FOR TECHNICAL DIRECTIVE #2, ENTITLED LC39B MAIN FLAME DEFLECTOR GEOMETRY CONCEPTS. ATTACHED IS THE SOW FOR TD-02. 1. THE TOTAL AMOUNT OF NNK12CA25T IS CHANGED FROM $177,973.00 TO $187,577.00, AN INCREASE OF $9,604.00. 2. NASA ACCEPTS 1.0 BASIS OF PROPOSAL SUBMITTED BY RS&H AS IDENTIFIED BELOW: A. THIS PROPOSAL IS IN RESPONSE TO YOUR RFP DATED AUGUST 15, 2012 TO ACCOMPLISH THE A&E SERVICES DESCRIBED IN TD-02 DATED AUGUST 15, 2012 FOR DEVELOPMENT OF BRIEFINGS TO THE TECHNICAL ENGINEERING REVIEW BOARD AND THE VIL CONTROL BOARD FOR THE LC39B MAIN FLAME DEFLECTOR GEOMETRY CONCEPTS STUDY. B. THIS WORK IS PROPOSED ON A FIRM FIXED PRICE BASIS. C. THE SCOPE TO BE ACCOMPLISHED IS DESCRIBED IN TD-02. D. DESIGNS SHALL BE PERFORMED TO THE STANDARD A&E LEVEL OF DETAIL. WHERE NO CHANGE TO EXISTING DRAWINGS ARE REQUIRED, SUCH DESIGNS / DETAILS MAY BE INCLUDED BY REFERENCE. E. THIS CONTRACT DOES NOT INCLUDE OBTAINING OR OORDINATING ANY PERMITS FOR CONSTRUCTION. - $9,187 - Monday the 25th of November 2013
National Aeronautics And Space Administration
KENNEDY SPACE CENTER
A-E STUDY MULTI-VEHICLE, STRUCTURAL CAPABILITIES STUDY PAD B, KENNEDY SPACE CENTER. THE PURPOSE OF THIS MODIFICATION IS FOR THE TECHINICAL DIRECTIVE TD-01 FOR PAB B STRUCTURAL STUDY DATED 10/11/11. - $77,000 - Monday the 25th of November 2013
National Aeronautics And Space Administration
KENNEDY SPACE CENTER
IGF::OT::IGF OTHER FUNCTIONS: A-E SERVICES TO DESIGN PLATFORMS IN THE VEHICLE ASSMEBLY BUILDING FOR SLS. MOD 1: REASON FOR MODIFICATION : SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE PER TECHNICAL DIRECTIVE 1 AND RS&H BASIS OF PROPOSAL DATED 9/4/12. TOTAL AMOUNT FOR THIS MODIFICATION: $77,000.00 NEW TOTAL AMOUNT FOR THIS VERSION: $77,000.00 NEW TOTAL AMOUNT FOR THIS AWARD: $4,428,000.00 OBLIGATED AMOUNT FOR THIS MODIFICATION: $77,000.00 NEW TOTAL OBLIGATED AMOUNT FOR THIS AWARD: $4,428,000.00 - $699,990 - Monday the 25th of November 2013
National Aeronautics And Space Administration
KENNEDY SPACE CENTER
IGF::OT::IGF OTHER FUNCTIONS: A-E DESIGN SERVICE FOR MOBILE LAUNCHER EXTENSIBLE PLATFORMS - $56,645 - Monday the 15th of December 2014
National Aeronautics And Space Administration
KENNEDY SPACE CENTER
IGF::OT::IGF OTHER FUNCTIONS A&E EXTENDED TITLE 1 SERVICES DURING THE CONSTRUCTION OF REPLACE PAD B CATACOMB FIRE PROTECTION&WATER PIPING - $527,097 - Wednesday the 11th of March 2015
National Aeronautics And Space Administration
KENNEDY SPACE CENTER
IGF::OT::IGF OTHER FUNCTIONS A&E STUDY OF MEDIUM CLASS VEHICLE LAUNCH CAPABILITY CONCEPTS, LC39B - $467,649 - Monday the 25th of November 2013
National Aeronautics And Space Administration
KENNEDY SPACE CENTER
IGF::OT::IGF OTHER FUNCTIONS. A-E TASK ORDER FOR A STUDY OF EMERGENCY EGRESS SYSTEM FOR SLS - $455,307 - Monday the 25th of November 2013
National Aeronautics And Space Administration
KENNEDY SPACE CENTER
IGF::OT::IGF OTHER FUNCTIONS A&E DESIGN AND UPGRADE PAD B WATER SYSTEMS, PHASE 2. - $44,815 - Thursday the 20th of August 2015
National Aeronautics And Space Administration
KENNEDY SPACE CENTER
A-E STUDY FOR PAD B CONFIGURATION AT LC39B. REASON FOR MODIFICATION : CHANGE ORDER IN ACCORDANCE WITH TECHNICAL DIRECTIVE 02 DATED 11/17/11. TOTAL AMOUNT FOR THIS MODIFICATION: $44,815.00 NEW TOTAL AMOUNT FOR THIS VERSION: $44,815.00 NEW TOTAL AMOUNT FOR THIS AWARD: $439,156.00 OBLIGATED AMOUNT FOR THIS MODIFICATION: $44,815.00 NEW TOTAL OBLIGATED AMOUNT FOR THIS AWARD: $439,156.00 - $4,351,000 - Monday the 25th of November 2013
National Aeronautics And Space Administration
KENNEDY SPACE CENTER
IGF::OT::IGF OTHER FUNCTIONS A-E SERVICES TO DESIGN PLATFORMS IN THE VEHICLE ASSMEBLY BUILDING FOR SLS.
© Copyright 2019
The Collier Report published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources.
No reliance should be made by readers or Collier Report subscribers.
Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances.
Requests for the modification of displayed information may be made to help.desk@1918.media.