Roy Anderson Corp

  • Roy Anderson Corp

  • View government funding actions
  • Gulfport, MS 395036008
  • Phone: 228-896-4000
  • Corporate URL: www.RAC.com
  • Estimated Number of Employees: 473
  • Estimated Annual Receipts: $520,581,984
  • Business Start Date: 1955
  • Contact Person: Tina Oakes
  • Contact Phone: 228-896-4000
  • Contact Email: Tina.Oakes@rac.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Industries Served: Residential Remodelers, Industrial Building Construction, Commercial and Institutional Building Construction, Water and Sewer Line and Related Structures Construction, Oil and Gas Pipeline and Related Structures Construction, Power and Communication Line and Related Structures Construction, Highway, Street, and Bridge Construction, Other Heavy and Civil Engineering Construction, Poured Concrete Foundation and Structure Contractors, Structural Steel and Precast Concrete Contractors, Framing Contractors, Masonry Contractors, Glass and Glazing Contractors, Roofing Contractors, Siding Contractors, Other Foundation, Structure, and Building Exterior Contractors, Construction
  • Product Areas: LABORATORY EQUIPMENT AND SUPPLIES, SCALES AND BALANCES, PHOTOGRAPHIC SUPPLIES, PHOTOGRAPHIC EQUIPMENT AND ACCESSORIES, PHOTOGRAPHIC EQ & ACCESSORIES, CHEMICALS, BOTTLES AND JARS, INSTALL OF INSTRUMENTS & LAB EQ, INSTALLATION OF EQUIPMENT- INSTRUMENTS AND LABORATORY EQUIPMENT

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $88,508 - Thursday the 19th of April 2012
    Department Of Navy
    NAVFAC SOUTHEAST
    P03002 - ADD/ALTER USAFCENT HEADQUARTERS, THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE 4TH ARMY BCD AREA TO A SECURED OPEN STORAGE PER RFP #4B, DATED 25 MAY 2011.
  • $8,497 - Thursday the 22nd of December 2011
    Veterans Affairs Department
    OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT
    SMOKE WALL IN ATTIC
  • $78,237 - Wednesday the 18th of April 2012
    National Aeronautics And Space Administration
    STENNIS SPACE CENTER
    A3 GENERAL CONSTRUCTION TASK ORDER NNS09AA75T. APPROVE FCR 164, 169 AND 170.
  • $7,700 - Wednesday the 28th of March 2012
    National Aeronautics And Space Administration
    STENNIS SPACE CENTER
    A3 GENERAL CONSTRUCTION TASK ORDER NNS09AA75T. APPROVAL OF FIELD CHANGE REQUEST 167
  • $7,300 - Wednesday the 28th of March 2012
    National Aeronautics And Space Administration
    STENNIS SPACE CENTER
    A3 UPPER LEVEL MECHANICAL AND ELECTRICAL. MODIFICATION TO INCORPORATE CHANGES TO THE SPECIFICATIONS AND DRAWINGS ADDRESSED IN FCR-019.
  • $70,211 - Thursday the 20th of September 2012
    Department Of Army
    W074 ENDIST SAVANNAH
    REFERENCE NO. R00009 HO006 RELOCATE COMMUNICATION MANHOLE
  • $68,289 - Wednesday the 28th of March 2012
    National Aeronautics And Space Administration
    STENNIS SPACE CENTER
    GENERAL CONSTRUCTION TASK ORDER 4. THE WORK TO BE PERFORMED CONSISTS OF THE FOLLOWING ITEMS: 1 - A3 RUN TANK PRESSURIZATION AND VENT PIPING; 2 - INSTALLATION OF VACUUM JACKETED LIQUID HYDROGEN TRANSFER LINE; 3 - LEVEL TEN PLATFORM CONSTRUCTION; 4 - FABRICATION AND INSTALLATION OF BOX PURGE AND SHOP AIR MANIFOLD TUBING; 5A - TEST STAND CABLE TRAY, UPS, AND UG CONDUITS; 5B - TEST STAND ELECTRICAL TRUNK CABLES AND TEST CELL PENETRATIONS. THIS MODIFICATION 8 ACTION INCORPORATES FIELD CHANGE REQUESTS (FCR) 018R2, 023, AND 025.
  • $676 - Wednesday the 28th of March 2012
    National Aeronautics And Space Administration
    STENNIS SPACE CENTER
    A3 GENERAL CONSTRUCTION TASK ORDER NNS09AA75T. APPROVE FCR 178
  • $66,452 - Wednesday the 28th of March 2012
    National Aeronautics And Space Administration
    STENNIS SPACE CENTER
    AWARD THE FOURTH TASK ORDER: A3 UPPER LEVEL MECHANICAL AND ELECTRICAL. MODIFICATION TO INCORPORATE CHANGES TO THE SPECIFICATIONS AND DRAWINGS ADDRESSED IN FCR-013R2.
  • $61,947 - Tuesday the 17th of April 2012
    Department Of Navy
    NAVFAC SOUTHEAST
    P03002 - ADD/ALTER USAFCENT HEADQUARTERS; THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE DESIGN CHANGES TO THE STATEMENT OF WORK IN REFERENCE TO THE FOLLOWING RFP'S: 23R2A, 10R1, 11A, 19, 20A, 21A, 22.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.