The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Sharma & Associates Inc

  • Contact Person: Vinaya Sharma
  • Contact Phone: 708-588-9871
  • Contact Email: vsharma@sharma-associates.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • Minority Owned Business
  • Self Certified Small Disadvantaged Business
  • For Profit Organization
  • Subcontinent Asian (Asian-Indian) American Owned
  • Subchapter S Corporation
  • Industries Served: Engineering Services, Drafting Services, Testing Laboratories, Graphic Design Services, Custom Computer Programming Services, Computer Systems Design Services, Other Scientific and Technical Consulting Services
  • Product Areas: ENGINEERING (ADVANCED), R&D- GENERAL SCIENCE/TECHNOLOGY: ENGINEERING (ADVANCED DEVELOPMENT), ENGINEERING (ENGINEERING), R&D- GENERAL SCIENCE/TECHNOLOGY: ENGINEERING (ENGINEERING DEVELOPMENT), RAIL TRANSPORTATION (ADVANCED), R&D- MODAL TRANSPORTATION: RAIL (ADVANCED DEVELOPMENT), RAIL TRANSPORTATION (ENGINEERING), R&D- MODAL TRANSPORTATION: RAIL (ENGINEERING DEVELOPMENT), R&D-TRANS OF HAZARD MAT-ADV DEV, R&D- OTHER TRANSPORTATION: TRANSPORTING HAZARDOUS MATERIALS (ADVANCED DEVELOPMENT), R&D- OTHER TRANSPORTATION: TRANSPORTING HAZARDOUS MATERIALS (ENGINEERING DEVELOPMENT), R&D-TRANS OF HAZARD MAT-ENG DEV, ARCHITECT AND ENGINEERING- GENERAL: INSPECTION (NON-CONSTRUCTION), A/E - INSPECT - NON CONTRUCT

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $350,000 - Tuesday the 23rd of September 2014
    Federal Railroad Administration
    DEPT OF TRANS/FEDERAL RAILROAD ADMIN
    ESTABLISHING VALIDITY OF TEDS SYSTESM
  • $285,639 - Tuesday the 23rd of September 2014
    Federal Railroad Administration
    DEPT OF TRANS/FEDERAL RAILROAD ADMIN
    DEMONSTATION OF ACTIVE NOISE CANCELLATION IN REVENUE SERVICE FOR TWO LOCOMOTIVE DESIGNS IN CO-ERATION WITH TWO RAILROADS ( CP AND MRL)A ANC SYSTEM WILL BE OBTAINED AND INSTALLED IN AC-4400 DESIGN LOCOMOTIVE AND ASD-70 DESIGN LOCOMOTIVE. THESE REPRESENT A LARGE FRACTION OF THE NATIONAL LOCOMOTIVE FLEET. NOISE AND VIBRATION DATA WILL BE COLLECTED AND THE EFFECTIVENESS OF THE ANC SYSTEM WILL BE EVALUATED.
  • $25,000 - Tuesday the 6th of March 2012
    Federal Railroad Administration
    DEPT OF TRANS/FEDERAL RAILROAD ADMIN
    HIGHER SPEED FREIGHT TRUCK DESIGN
  • $214,807 - Tuesday the 11th of February 2014
    Federal Railroad Administration
    DEPT OF TRANS/FEDERAL RAILROAD ADMIN
    IGF::OT::IGF THE GOAL OF THE PROJECT IS TO DEVELOP A BLUEPRINT OR ROAD MAP, INCLUDING A BILL OF MATERIALS (BOM) THAT CAN BE USED BY THE INDUSTRY FOR SETTING UP AND UTILIZING THE EFFICIENT LEMS. THIS NEW EFFORT INCLUDES THE INTEGRATION OF A PARTICULATE MATTER (PM) COLLECTION SYSTEM COMPONENTS AND PROCESSES INTO THE LEMS BOM AND INSTRUCTIONS AND ENVIRONMENTAL PROTECTION AGENCY (EPA) ANALYSIS OF THIS FULL LEMS SYSTEM AND DIRECTION ON GETTING THE SYSTEM CERTIFIED. THE END RESULT WILL BE USEFUL AS TIER 4 REGULATION IMPLEMENTATION/ENFORCEMENT NEARS.
  • $207,480 - Tuesday the 16th of February 2016
    Immediate Office Of Secretary Of Transportation
    DOT-OR&T 00057
    OTHER FUNCTIONS DEVELOPMENT, FABRICATION AND TESTING OF COLLISION PROTECTION STRATEGIES FOR TRAIN ENGINEERS
  • $200,000 - Tuesday the 23rd of September 2014
    Federal Railroad Administration
    DEPT OF TRANS/FEDERAL RAILROAD ADMIN
    ECP BRAKES--BARRIERS TO DEPLOYMENT AND IIMPLEMENTATION PLAN DEVELOPMENT.
  • $199,702 - Tuesday the 23rd of September 2014
    Federal Railroad Administration
    DEPT OF TRANS/FEDERAL RAILROAD ADMIN
    OFFICE OF SAFETY SUPPORT FOR ANALYSIS/SIMULATION AND PROBLEM SOLVING IN AREA OF FREIGHT CARS AND LOCOMOTIVES. RPD IS FREQUENTLY ASKED TO PROVIDE TECHNICAL SUPPORT, ON SHORT NOTICE, IN SEVERAL MECHANICAL TECHNICAL AREAS.FOR EXAMPLE, RRS MAY REQUIRE A STRUCTURAL ANALYSIS OF A CAR FOR INTEGRITY IN TRAIN ACCIDENTS.
  • $160,000 - Wednesday the 30th of January 2013
    Federal Railroad Administration
    DEPT OF TRANS/FEDERAL RAILROAD ADMIN
    .
  • $150,000 - Tuesday the 23rd of September 2014
    Federal Railroad Administration
    DEPT OF TRANS/FEDERAL RAILROAD ADMIN
    ADVANCED TRI-COUPLER DEVELOPMENTAL TESTING AND FIELD APPLICATION WORK.
  • $150,000 - Wednesday the 30th of January 2013
    Federal Railroad Administration
    DEPT OF TRANS/FEDERAL RAILROAD ADMIN
    IGF::OT::IGF CONDUCT BRAKING RESEARCH TO IDENTIFY ALTERNATIVE METHODS TO DISSIPATE HEAT TO PREVENT WHEEL SHELLING.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.