The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Sm Construction Inc dba Rs Morris Construction

  • Sm Construction Inc dba Rs Morris Construction

  • View government funding actions
  • Fresno, CA 937034500
  • Phone: 559-434-5972
  • Estimated Number of Employees: 9
  • Estimated Annual Receipts: $5,377,583
  • Business Start Date: 2004
  • Contact Person: Susan Morris
  • Contact Phone: 559-434-5972
  • Contact Email: susan@rsmorris.net
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Woman Owned Small Business
  • Woman Owned Business
  • Industries Served: Construction Sand and Gravel Mining, Industrial Building Construction, Commercial and Institutional Building Construction, Water and Sewer Line and Related Structures Construction, Power and Communication Line and Related Structures Construction, Highway, Street, and Bridge Construction, Other Heavy and Civil Engineering Construction, Site Preparation Contractors
  • Product Areas: SUPPORT- ADMINISTRATIVE: TRANSLATION AND INTERPRETING, ADMIN SVCS/TRANSLATION-SIGN LANGUAG

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $9,611 - Thursday the 19th of June 2014
    National Aeronautics And Space Administration
    AMES RESEARCH CENTER
    FIRE SUPPRESSION AND ALARM SYSTEM, BUILDINGS N237; N236 AND N202. DESIGN, FURNISH, INSTALL AND TEST NEW EXTENSION OF THE EXISTING FIRE SPRINKLER SYSTEM.
  • $8,583 - Thursday the 19th of June 2014
    National Aeronautics And Space Administration
    AMES RESEARCH CENTER
    FIRE SUPPRESSION AND ALARM SYSTEM, BUILDINGS N237; N236 AND N202. DESIGN, FURNISH, INSTALL AND TEST NEW EXTENSION OF THE EXISTING FIRE SPRINKLER SYSTEM.
  • $76,580 - Thursday the 19th of June 2014
    National Aeronautics And Space Administration
    AMES RESEARCH CENTER
    THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ELECTRICAL WORK STATED IN DRAWINGS A254-0905-E6 AND A254-0905-E8, SEE SHEETS ONE AND TWO ATTACHED.
  • $7,403 - Thursday the 19th of June 2014
    National Aeronautics And Space Administration
    AMES RESEARCH CENTER
    EMERGENCY WATER STORAGE TANK AND FIRE PUMP STATION PHASE II MODIFICATION 4 IS TO REVISE THE STATEMENT OF WORK.
  • $7,315 - Thursday the 19th of June 2014
    National Aeronautics And Space Administration
    AMES RESEARCH CENTER
    FIRE SUPPRESSION AND ALARM SYSTEM, BUILDINGS N237; N236 AND N202. DESIGN, FURNISH, INSTALL AND TEST NEW EXTENSION OF THE EXISTING FIRE SPRINKLER SYSTEM.
  • $70,800 - Saturday the 29th of September 2012
    Department Of Army
    W7MX USPFO ACTIVITY CA ARNG
    REPAIR CONCRETE FOR HANGAR DOORS
  • $6,834 - Thursday the 19th of June 2014
    National Aeronautics And Space Administration
    AMES RESEARCH CENTER
    FIRE SUPPRESSION AND ALARM SYSTEM, BUILDINGS N237; N236 AND N202. DESIGN, FURNISH, INSTALL AND TEST NEW EXTENSION OF THE EXISTING FIRE SPRINKLER SYSTEM.
  • $66,735 - Friday the 10th of July 2015
    National Aeronautics And Space Administration
    AMES RESEARCH CENTER
    THE PURPOSE OF THIS MODIFICATION IS TO REMOVE AND REPLACE ISU-1 IN ROOM 170, N233 AS PER DRAWINGS A233-0901. (PC8) AND PROVIDE AND INSTALL SPECIAL DISCONNECT SWITCH, HUBBELL (OR APPROVED EQUAL) WITH NORMALLY OPEN EARLY BREAK AUXILIARY CONTACTS AT THE VFD S FOR AH-22 AND AH-24. WIRING AND CONNECTIONS SHALL BE PROVIDED PER MANUFACTURER S RECOMMENDATIONS. (RFI #28 AND PC 11)
  • $57,000 - Thursday the 19th of June 2014
    National Aeronautics And Space Administration
    AMES RESEARCH CENTER
    N240 HIGH BAY DEHUMIDIFICATION THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS PROVIDING AND INSTALLING A TEMPORARY AIR CONDITIONING UNIT (10 TON CAPACITY) ON THE ROOF OF BUILDING N240 AND CONNECTING THE SUPPLY AIR DUCT TO THE EXISTING AHU INTAKE, AND ALSO PROVIDE ELECTRICAL POWER TO THE UNIT. THIS TEMPORARY SYSTEM SHALL BE OPERATIONAL BY 12/13/2011 AND REMAIN TILL THE REPLACEMENT SYSTEM IS UP AND RUNNING.
  • $54,725 - Thursday the 19th of June 2014
    National Aeronautics And Space Administration
    AMES RESEARCH CENTER
    MODIFICATION 2 IS TO MAKE MODIFICATIONS TO THE N254 CHILLED WATER PIPING AS PER THE REVISED DRAWINGS. MODIFICATION 1 IS TO INCREASE THE ISU 1E FROM A 15 TON TO A 30 TON ALONG WITH INSTALLING ANOTHER ISU. HVAC RETROFIT, BUILDINGS N254 AND N233. THE WORK TO BE PERFORMED UNDER THIS PROJECT FOR THE BASE BID BUILDING N254 IS TO REMOVE AND REPLACE EXISTING ISU WITH SEPARATE CONTROLS: A-ISU 1A LOCATED IN ROOM 101 ALONG WITH THE B-ISU 1B LOCATED IN ROOM 101. OPTIONS ONE (1) IS FOR BUILDING N254 AND IS TO INSTALL A NEW ROOFTOP HEAT PUMP TO SERVE SOC AREA. OPTION TWO (2) IS FOR BUILDING N254 AND IS TO REMOVE AND REPLACE EXISTING ROOFTOP AIR HANDLING UNIT AH-1 SERVING FIRST AND SECOND FLOOR WITH A NEW ONE. OPTION THREE (3) IS FOR BUILDING N254 AND IS TO REMOVE AND REPLACE EXISTING CHILLER CH-2 WITH A NEW ONE. THE WORK TO BE PERFORMED FOR BASE BID BUILDING N233 IS TO REMOVE TWO (2) EXISTING CEILING FAN COIL UNITSIN SECOND FLOOR AND REPLACE WITH TWO (2) ROOFTOP AIR HANDLING UNITS. AND IS TO DEVELOP A PLAN FOR SECONDARY EGRESS AT THE TIME OF FAN COIL UNIT'S REMOVAL. OPTION FOUR (4) IS FOR BUILDING N233 AND IS TO REMOVE AND REPLACE EXISTING ROOFTOP AIR HANDLING UNIT LOCATED ABOVE ROOM 166A. OPTION FIVE(5) IS FOR BUILDING N233 AND IS TO REMOVE EXISTING CEILING AIR HANDLING UNITS LOCATED IN ROOM 197 AND REPLACE WITH A ROOFTOP AIR HANDLING UNIT. OPTION SIX (6) FOR BUILDING N233 AND IS TO REMOVE AND REPLACE EXISTING ISU #1 LOCATED IN ROOM 170. OPTION SEVEN (7) IS FOR BUILDING N233 AND IS TO CLEAN (E) TERMINAL HEATING COILS, TYPICAL FOR ALL COILS SUPPLIED BY SAME AIR HANDLING UNIT. MAGNITUDE OF CONSTRUCTION: BETWEEN $1,000,000 AND $5,000,000. AN ORGANIZED SITE VISIT HAS BEEN SCHEDULED FOR 10:00 AM, APRIL 14, 2011. PARTICIPANTS WILL MEET AT AMES RESEARCH CENTER, BUILDING N213, ROOM 212, MOFFETT FIELD, CA.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.