The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Stronghold Engineering Incorporated

  • Contact Person: Beverly Bailey
  • Contact Phone: 951-684-9303
  • Contact Email: bb@teamsei.com
  • Business Structure:
  • Other
  • Business Type:
  • Minority Owned Business
  • For Profit Organization
  • Woman Owned Business
  • Asian-Pacific American Owned
  • Subchapter S Corporation
  • Industries Served: Solar Electric Power Generation, Other Electric Power Generation, Electric Bulk Power Transmission and Control, Electric Power Distribution, Water Supply and Irrigation Systems, Sewage Treatment Facilities, Industrial Building Construction, Commercial and Institutional Building Construction, Water and Sewer Line and Related Structures Construction, Power and Communication Line and Related Structures Construction, Other Heavy and Civil Engineering Construction, Electrical Contractors and Other Wiring Installation Contractors, Plumbing, Heating, and Air-Conditioning Contractors, Other Building Equipment Contractors, Site Preparation Contractors, Professional, Scientific, and Technical Services
  • Product Areas: MEDICAL AND SURGICAL INSTRUMENTS, EQUIPMENT, AND SUPPLIES, MED & SURGICAL INSTRUMENTS,EQ & SUP

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $9,723 - Thursday the 17th of November 2011
    Public Buildings Service
    DESIGN AND CONSTRUCTION DIVISION
    THIS MODIFICATION IS BEING PROVIDED FOR ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY FOR WORK ASSOCIATED WITH MEP REPORT REMEDIES IN PHASE 4 ON THE 6TH FLOOR AT THE FEDERAL BUILDING LOCATED AT 300 NORTH LOS ANGELES STREET IN LOS ANGELES, CALIFORNIA.
  • $74,137 - Monday the 24th of October 2011
    Public Buildings Service
    DESIGN AND CONSTRUCTION DIVISION
    THIS MODIFICATION IS BEING ISSUED FOR ALL MATERIALS, LABOR, AND EQUIPMENT NECESSARY FOR THE FIRE ALARM UPGRADES REQUIRED ON THE 6TH FLOOR AT THE FEDERAL BUILDING AT 300 NORTH LOS ANGELES STREET IN LOS ANGELES, CALIFORNIA.
  • $6,545 - Thursday the 13th of September 2012
    Department Of Navy
    NAVFAC SOUTHWEST
    P-740 BEQ CONSTRUCTION
  • $500,000 - Tuesday the 17th of January 2012
    Public Buildings Service
    DESIGN AND CONSTRUCTION DIVISION
    THIS MODIFICATION IS BEING ISSUED TO CORRECT THE VARIANCE BETWEEN COMPRIZON AND PEGASYS WHICH WAS CAUSED WHEN MODIFICATION PSH7 WAS ERRONEOUSLY MARKED "SUBJECT TO AVAILABLITY OF FUNDS". THIS CAUSED THE CONTRACT "TOTAL OBLIGATED AMOUNT" IN COMPRIZON TO NOT REFLECT THE $500,000.00 WHICH WAS OBLIGATED IN MODIFICATION PSH7. THIS VARIANCE WAS NOT ACTUALLY CORRECTED IN MODIFICATION PSZ2 SO THIS MODIFICATION IS A SECOND ATTEMPT TO CORRECT THE VARIANCE.
  • $40,311 - Monday the 12th of December 2011
    Public Buildings Service
    DESIGN AND CONSTRUCTION DIVISION
    THIS MODIFICATION IS BEING ISSUED TO PROVIDE FOR ALL LABOR, EQUIPMENT, AND MATERIALS NECESSARY FOR THE INSTALLATION OF FLOOR MONUMENTS AT PHASES 1, 2, 3, AND 4 ON THE 6TH FLOOR OF THE FEDERAL BUILDING LOCATED AT 300 NORTH LOS ANGELES STREET IN LOS ANGELES, CALIFORNIA.
  • $34,689 - Thursday the 12th of January 2012
    Public Buildings Service
    DESIGN AND CONSTRUCTION DIVISION
    THIS MODIFICATION IS BEING ISSUED TO PROVIDE FOR THE LIFE-SAFETY IMPROVEMENTS WRITTEN IN THE LINE ITEMS ON THE FOLLOWING PAGE IN SUPPORT OF THE COMPREHENSIVE SEISMIC AND LIFE-SAFETY RENOVATIONS OF FLOORS 1-8 OCCURRING AT THE FEDERAL BUILDING LOCATED AT 300 NORTH LOS ANGELES STREET IN LOS ANGELES, CALIFORNIA.
  • $298,091 - Monday the 19th of December 2011
    Department Of Navy
    NAVFAC SOUTHWEST
    P-740 BEQ CONSTRUCTION
  • $29,512 - Thursday the 12th of January 2012
    Public Buildings Service
    DESIGN AND CONSTRUCTION DIVISION
    THIS MODIFICATION IS BEING ISSUED TO PROVIDE FOR THE SERVICES STATED IN THE LINE ITEMS ON THE FOLLOWING PAGE IN SUPPORT OF THE COMPREHENSIVE SEISMIC AND LIFE-SAFETY RENOVATIONS OF FLOORS 1-8 AT THE FEDERAL BUILDING LOCATED AT 300 NORTH LOS ANGELES STREET IN LOS ANGELES, CALIFORNIA.
  • $1,817,927 - Friday the 27th of January 2012
    Department Of Navy
    NAVFAC SOUTHWEST
    DRY UTILITIES MACC - GRP 55: PHOTOVOLTAIC SYSTEMS, (4) FOUR, MCAS YUMA, AZ.
  • $146,166 - Monday the 31st of October 2011
    Department Of Navy
    NAVFAC SOUTHWEST
    P-740 BEQ CONSTRUCTION

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.