Swinerton Builders
- View government funding actions
- Honolulu, HI 968136441
- Phone: 808-521-8408
- Corporate URL: www.swinerton.com
- Estimated Number of Employees: 48
- Estimated Annual Receipts: $103,224,000
- Business Start Date: 1997
- Contact Person: Jennifer Creedon
- Contact Phone: 808-521-8408
- Contact Email: jcreedon@swinerton.com
- Business Structure:
- Corporate Entity (Not Tax Exempt)
- Business Type:
- For Profit Organization
- Industries Served: Industrial Building Construction, Commercial and Institutional Building Construction
- Product Areas: DRUGS AND BIOLOGICALS, LIFE SCIENCES (BASIC), R&D- GENERAL SCIENCE/TECHNOLOGY: LIFE SCIENCES (BASIC RESEARCH), R&D- GENERAL SCIENCE/TECHNOLOGY: LIFE SCIENCES (APPLIED RESEARCH/EXPLORATORY DEVELOPMENT), LIFE SCIENCES (APPLIED/EXPLORATORY), LIFE SCIENCES (ENGINEERING), R&D- GENERAL SCIENCE/TECHNOLOGY: LIFE SCIENCES (ENGINEERING DEVELOPMENT), R&D- GENERAL SCIENCE/TECHNOLOGY: LIFE SCIENCES (OPERATIONAL SYSTEMS DEVELOPMENT), LIFE SCIENCES (OPERATIONAL), R&D- GENERAL SCIENCE/TECHNOLOGY: LIFE SCIENCES (MANAGEMENT/SUPPORT), LIFE SCIENCES (MANAGEMENT/SUPPORT)
Sampling of Federal Government Funding Actions/Set Asides
In order by amount of set aside monies.
- $9,768 - Friday the 24th of February 2012
Public Buildings Service
DESIGN AND CONSTRUCTION DIVISION
MODIFICATION TO PROVIDE FOR MODIFICATIONS TO THE TELECOMMUNICATION CABLING IN THE PROBATION AND PRE-TRIAL EXPANSION SPACE. - $75,692 - Friday the 15th of June 2012
Public Buildings Service
DESIGN AND CONSTRUCTION DIVISION
INSTALLATION OF THE USMS FURNITURE - $71,519 - Friday the 31st of August 2012
Public Buildings Service
DESIGN AND CONSTRUCTION DIVISION
RELOCATE AND RECONFIFURE TWO (2) EXISTING RACKS SERVING COURTROOM A AND COURTROOM B PER FINAL A/V SYSTEM DESIGN REPORT - R1 DATED JUNE 8, 2012 ON THE 4TH FLOOR TO THE 5TH FLOOR OF THE PJKK U. S. COURTHOUSE. - $68,282 - Friday the 27th of July 2012
Public Buildings Service
DESIGN AND CONSTRUCTION DIVISION
PROVIDE FOR USMS TASK FORCE SUITE ON THE 2ND FLOOR OF THE PJKK FED BLDG PER BULLETINS 1, 3, 4 AND ADDENDUM 3. - $637,735 - Tuesday the 27th of December 2011
Public Buildings Service
DESIGN AND CONSTRUCTION DIVISION
PROVIDE FOR INSTALLATION OF A NEW, DEDICATED CHILLED WATER LOOP CONNECTED TO EXISTING CHILLED WATER MAINS IN THE FEDERAL BUILDING MECHANICAL PENTHOUSE AND EXCLUSIVELY SERVING NEW HVAC EQUIPMENT WITHIN THE PART I CONSTRUCTION AREA OF THE FEDERAL BUILDING SECOND FLOOR. - $5,767 - Friday the 31st of August 2012
Public Buildings Service
DESIGN AND CONSTRUCTION DIVISION
INSTALLATION OF INFRASTRUCTURE (CONDUITS, SLEEVES, PULL BOXES, AND LADDER RACK) ASI 209R2 IN PREPARATION OF THE RELOCATION OF THE 4TH FLOOR AV RACKS. THE U. S. DISTRICT COURT AND U. S. MARSHAL SERVICE ARE SPLITTING THE COSTS. THE U. S. M. S. RWA WILL BE USED. - $5,767 - Friday the 31st of August 2012
Public Buildings Service
DESIGN AND CONSTRUCTION DIVISION
INSTALLATION OF INFRASTRUCTURE (CONDUITS, SLEEVES, PULL BOXES, AND LADDER RACK) ASI 209R2 IN PREPARATION OF THE RELOCATION OF THE 4TH FLOOR AV RACKS. THE U. S. DISTRICT COURT AND U. S. MARSHAL SERVICE WILL BE SPLITTING THE COST. THIS PART BEING PAID BY COURTS RWA. - $46,323 - Wednesday the 18th of July 2012
Public Buildings Service
DESIGN AND CONSTRUCTION DIVISION
CEILING, LIGHTING AND HVAC REVISIONS TO USMS CONFERENCE ROOM, UPGRADE CERAMIC TILE AND STONE IN RESTROOMS, INSTALL FIVE STEEL KICKER ASSEMBLIES AND INSTALL ADDITIONAL SIDE LIGHT IN THE USMS CONFERENCE ROOM AND ADDITIONAL WALL COVERING - $4,399 - Wednesday the 12th of September 2012
Public Buildings Service
DESIGN AND CONSTRUCTION DIVISION
THIS MODIFICATION IS BEING ISSUED TO APPLY BATT INSULATION ABOVE VAVS TO THE UNDERSIDE OF THE SLAB ABOVE THE TERMINAL UNITS WITHIN A RADIUS OF FIVE FEET IN THE FOUR (4) COURTROOMS IN THE PJKK U. S. COURTHOUSE. - $4,370 - Friday the 15th of June 2012
Public Buildings Service
DESIGN AND CONSTRUCTION DIVISION
UPGRADES TO THE USMS PATIO BLINDS.
© Copyright 2019
The Collier Report published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources.
No reliance should be made by readers or Collier Report subscribers.
Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances.
Requests for the modification of displayed information may be made to help.desk@1918.media.