Synergy Systems Inc

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $96,801 - Wednesday the 8th of August 2012
    Department Of Army
    W076 ENDIST LITTLE ROCK
    BASE BID: DENTAL CLINIC, BLDG 9008 DEFINITIZE NTP MOD 02 FOR MISC. WORK DEDUCTIONS AND ADDITIONAL CASEWORK
  • $9,631 - Monday the 21st of May 2012
    Department Of Army
    W076 ENDIST LITTLE ROCK
    BASE BID: DENTAL CLINIC, BLDG 9008 PROVIDE A COMPLETE LEAD SHIELDING DESIGN AT 12 DENTAL X-RAY ROOMS.
  • $956,115 - Friday the 30th of March 2012
    Department Of Army
    W076 ENDIST LITTLE ROCK
    BASE BID: DENTAL CLINIC, BLDG 9008 - 1. THIS NOTICE TO PROCEED (NTP) IS ISSUED TO DIRECT THE CONTRACTOR TO PROCEED WITH ALL WORK AS DESCRIBED IN THE RFP DATED DECEMBER 8, 2011 WHICH IS BASED ON THE REPORT OF WORK PREPARED BY MOUNTAIN CONSULTING SERVICES, LLC, DATED OCTOBER 12, 2011, AND THE ATTACHED STATEMENT OF WORK FOR PHASE 1 AND 2 MOLD ABATEMENT AND REPLACEMENT (UPDATED 11/30/11) EXCEPT FOR: - MOLD CLEANUP WORK DESCRIBED IN THE UNDER BUILDING CRAWL SPACE IS OMITTED. 2. THE SCOPE OF WORK INCLUDES THE NEW ELECTRICAL CIRCUIT RUNS TO SUPPORT NEW X-RAY EQUIPMENT IN ROOMS 101, 122 AND 132 (CONTAINED IN THE DECEMBER 8, 2011 RFP).
  • $5,600 - Friday the 11th of May 2012
    Department Of Army
    W076 ENDIST LITTLE ROCK
    BASE BID: DENTAL CLINIC, BLDG 9008 - PROVIDE ALL DESIGN AND WORK TO ACCOMPLISH THE FOLLOWING CHANGES: A. SQUARE UP PRECAST OPENINGS AT EXISTING WINDOWS IN ACCORDANCE WITH CONTRACTORS CHANGE REQUEST PROPOSAL NUMBER 65.
  • $47,355 - Monday the 27th of February 2012
    Department Of Army
    W076 ENDIST LITTLE ROCK
    BASE BID: DENTAL CLINIC, BLDG 9008 - PROVIDE ALL DESIGN AND WORK TO ACCOMPLISH THE FOLLOWING CHANGES: A. PROVIDE CONDUIT AND BOXES FOR SUPPORT OF LOW VOLTAGE SECURITY SYSTEMS FOR THE PHARMACY. B. IN ACCORDANCE WITH ITEM 53-4 NOTED ON THE 1/19/12 MEETING MINUTES, PROVIDE A DETAILED COST ESTIMATE TO INSTALL BACKFLOW PREVENTERS ON THE MAIN SERVICE LINE TO THE BUILDING AND THE FIRE PROTECTION SERVICE LINE TO THE PHARMACY BUILDING. C. RELOCATE A DAMAGED, LEAKING SECTION OF EXISTING 4¿ SANITARY MAIN AT THE PHARMACY BUILDING. THE EXISTING PIPE IS PVC/ABS AND THE REPLACEMENT SHALL BE WITH CAST IRON HUB AND SPIGOT PIPE. D. RAISE THE EXISTING NATURAL GAS LINE RUNNING IN THE SOFFIT OF THE DENTAL CLINIC SO THAT IT WILL BE CONCEALED IN THE NEW SOFFIT. E. REPLACE EXISTING FIRE ALARM CONTROL PANEL AT THE PHARMACY BUILDING SINCE THE EXISTING PANEL IS SHORT OF CAPACITY FOR THE NEW SYSTEM COMPONENTS. F. REPLACE A LEAKING SECTION OF 6-INCH STORM DRAIN LEADER AT THE PHARMACY BUILDING. G. IN THE REFILL PHARMACY, DELETE THE CARPET REQUIREMENTS AND IN ITS PLACE INSTALL CERAMIC TILE.
  • $1,835 - Monday the 7th of May 2012
    Department Of Army
    W076 ENDIST LITTLE ROCK
    BASE BID: DENTAL CLINIC, BLDG 9008 PROVIDE ALL DESIGN AND WORK TO ACCOMPLISH THE FOLLOWING CHANGES: A. REPLACE EXISTING 1-INCH MEDICAL GAS VALVE AT THE DENTAL CLINIC. B. ALSO AT THE DENTAL CLINIC, INSULATE EXISTING RETURN AIR DUCTWORK IN THE UNDER FLOOR CRAWL SPACE AS IDENTIFIED IN THE PROPOSAL FOR BUILDING MOLD REMOVAL.
  • $11,366 - Friday the 13th of January 2012
    Department Of Army
    W076 ENDIST LITTLE ROCK
    REPAIR REFILL PHARMACY AND DENTAL CLINIC, FAIRCHILD AFB, WASHINGTON

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.