Tor Engineering Corporation
- View government funding actions
- Phoenix, AZ 850403982
- Phone: 602-437-1676
- Estimated Number of Employees: 44
- Estimated Annual Receipts: $7,064,656
- Business Start Date: 1985
- Contact Person: Robert Ingebretson
- Contact Phone: 602-437-1676
- Contact Email: RobertIngebretson@TOREngineering.com
- Business Structure:
- Corporate Entity (Not Tax Exempt)
- Business Type:
- Self Certified Small Disadvantaged Business
- For Profit Organization
- Subchapter S Corporation
- Industries Served: Engineering Services, Drafting Services, Industrial Design Services, Administrative Management and General Management Consulting Services
- Product Areas: SERVICES (ENGINEERING), R&D- DEFENSE OTHER: SERVICES (ENGINEERING DEVELOPMENT)
Sampling of Federal Government Funding Actions/Set Asides
In order by amount of set aside monies.
- $9,031 - Wednesday the 19th of September 2012
Bureau Of Indian Affairs
WESTERN REGIONAL OFFICE
PROJECT: 69/12.47KV 10MVA&20MVA POWER DISTRIBUTION TRANSFORMER TECHNICAL SPECIFICATION DEVELOPMENT. SERVICES ARE FOR ELECTRICAL ENGINEER(S), DESIGNERS(S), AND CAD OPERATOR(S) PROVIDING ENGINEERING SUPPORT TO SCIP TO PROVIDE FOR THE DEVELOPMENT OF TECHNICAL SPECIFICATIONS, SUITABLE FOR COMPETITIVE PROCUREMENT, FOR TWO NEW STANDARD 69/12.47KV POWER TRANSFORMERS, ONE 7.5/10MVA (ONAN,ONAF) UNIT AND ONE 12/16/20MVA (ONAN,ONAF,ONAF) FOR USE IN DISTRIBUTION SUBSTATIONS. - $78,936 - Wednesday the 19th of September 2012
Bureau Of Indian Affairs
WESTERN REGIONAL OFFICE
PROJECT: SACATON SUBSTATION 69/12KV EXPANSION. SERVICES ARE FOR ELECTRICAL/CIVIL ENGINEER(S), DESIGNER(S), AND CAD OPERATOR(S) PROVIDING ENGINEERING DESIGN SERVICES FOR THE DEVELOPMENT OF AN ENGINEERING DESIGN AND REQUEST FOR PROPOSAL TECHNICAL SPECIFICATION PACKAGE FOR THE EXPANSION OF THE EXISTING 69/12K SACATON SUBSTATION. THE EXPANSION INCLUDES THE ADDITION OF A NEW 69KV YARD TO ACCOMMODATE THE LINE-IN/LINE-OUT OF THE BLACKWATER AND SANTAN 69KV LINES, AND THE ADDITION OF A NEW FOUR BAY 12KV YARD. - $78,366 - Wednesday the 19th of September 2012
Bureau Of Indian Affairs
WESTERN REGIONAL OFFICE
PROJECT: COOLIDGE SUBSTATION PROTECTION UPGRADE. SERVICES ARE FOR ELECTRICAL/CIVIL ENGINEER(S), DESIGNER(S), AND CAD OPERATOR(S) PROVIDING ENGINEERING DESIGN SERVICES FOR THE DEVELOPMENT OF AN ENGINEERING DESIGN AND REQUEST FOR PROPOSAL TECHNICAL SPECIFICATION PACKAGE FOR THE FOLLOWING: INSTALLATION OF TWO NEW 230KV CIRCUIT BREAKERS AND ASSOCIATED DISCONNECT SWITCHES ON THE HIGH SIDE OF TRANSFORMERS T3 AND T4; AND INSTALLATION OF A NEW PORTABLE CONTROL ENCLOSURE FOR THE UPGRADE OF ALL 115/69/12KV LINE AND TRANSFORMER RELAYING THAT INCLUDES NEW SCHWEITZER COMMUNICATIONS AND SCADA SYSTEMS. CONTROL HOUSE IS TO BE DESIGNED AS A PORTABLE TO ACCOMMODATE FUTURE RELOCATION OF COOLIDGE SUBSTATION. PROJECT WILL ALSO PROVIDE FOR THE REPLACEMENT OF THE EXISTING 115KV CCVTS, CTS AND METER DUE TO AGE AND CONCERNS WITH RELIABILITY. - $7,117 - Wednesday the 11th of April 2012
Bureau Of Indian Affairs
WESTERN REGIONAL OFFICE
PROJECT: DISTRIBUTION FEEDER VOLTAGE QUALITY AND CONTROL IMPROVEMENT PROJECT, COOLIDGE, AZ. SERVICES ARE FOR ELECTRICAL/CIVIL ENGINEER(S), DESIGNER(S), AND CAD OPERATOR(S) TO PROVIDE ENGINEERING SUPPORT FOR DEVELOPMENT OF TECHNICAL SPECIFICATIONS FOR A REQUEST FOR PROPOSAL (RFP) WHICH ASSISTS SCIP DEVELOP AND BID A MULTI-YEAR SUPPLY CONTRACT FOR NEW DISTRIBUTION CLASS, OVERHEAD MOUNT, VOLTAGE REGULATORS AND CAPACITOR BANKS. THE TASK WILL INCLUDE DEVELOPMENT OF NEW SCIP STANDARDS FOR RATINGS AND OPERATIONAL VOLTAGES OF OVERHEAD MOUNT VOLTAGE REGULATORS AND SHUNT CAPACITOR BANKS TO BE INSTALLED ON FEEDER CIRCUITS WITHIN THE SCIP ELECTRICAL SYSTEM. - $63,661 - Wednesday the 11th of April 2012
Bureau Of Indian Affairs
WESTERN REGIONAL OFFICE
PROJECT: 69KV TRANSMISSION SYSTEM RELIABILITY IMPROVEMENT PROJECT, VARIOUS LOCATIONS, AZ. SERVICES ARE FOR ELECTRICAL/CIVIL ENGINEERS, DESIGNERS, AND CAD OPERATORS PROVIDING ENGINEERING DESIGN SERVICES FOR THE DEVELOPMENT OF TECHNICAL SPECIFICATIONS FOR THE INSTALLATION OF A NEW 69KV SECTIONALIZING BREAKER AT FELDMAN AND MAMMOTH 1 SUBSTATIONS AND THE RENOVATION OF THE HAYDEN 69KV SUBSTATION. - $58,318 - Thursday the 20th of September 2012
Bureau Of Indian Affairs
WESTERN REGIONAL OFFICE
PROJECT: LINE BUTTE SUBSTATION 69KV LINE BAY ADDITION AND 69KV LINE REPLACEMENT PROJECT. SERVICES ARE FOR ELECTRICAL/CIVIL ENGINEER(S), DESIGNER(S), AND CAD OPERATOR(S) PROVIDING ENGINEERING DESIGN SERVICES FOR THE DEVELOPMENT OF AN ENGINEERING DESIGN AND REQUEST FOR PROPOSAL TECHNICAL SPECIFICATION PACKAGE FOR THE INSTALLATION OF A NEW 69KV LINE BAY IN BAY POSITION 4 AT LONE BUTTE SUBSTATION AND THE REPLACEMENT OF APPROXIMATELY 1 MILE OF SINGLE CIRCUIT OVERHEAD 69KV LINE WITH A NEW DOUBLE CIRCUIT LINE ON WOOD AND STEEL POLES. - $49,754 - Wednesday the 19th of September 2012
Bureau Of Indian Affairs
WESTERN REGIONAL OFFICE
PROJECT: FLORENCE SUBSTATION 12KV SYSTEM UPGRADE. SERVICES ARE FOR ELECTRICAL/CIVIL ENGINEER(S), DESIGNER(S), AND CAD OPERATOR(S) PROVIDING ENGINEERING DESIGN SERVICES FOR THE DEVELOPMENT OF AN ENGINEERING DESIGN AND REQUEST FOR PROPOSAL TECHNICAL SPECIFICATION PACKAGE FOR THE UPGRADE OF THE EXISTING FLORENCE SUBSTATION. THE UPGRADE WORK AT FLORENCE SUBSTATION WILL ACCOMMODATE THE CONVERSION OF THE TWO EXISTING 12KV FEEDER POSITIONS INTO A SINGLE TRANSFORMER SECONDARY MAIN BREAKER POSITION AND THE ADDITION OF A NEW FOUR BAY 12KV FEEDER YARD. THIS UPGRADE WILL REQUIRE THE EXPANSION OF THE EXISTING SUBSTATION YARD. IT IS ANTICIPATED THAT THE FOLLOWING WORK WILL BE REQUIRED. - $37,169 - Wednesday the 19th of September 2012
Bureau Of Indian Affairs
WESTERN REGIONAL OFFICE
PROJECT: 69/12KV FIREBIRD SUBSTATION RENOVATION UPGRADE. SERVICES ARE FOR ELECTRICAL/CIVIL ENGINEER(S), DESIGNER(S), AND CAD OPERATOR(S) PROVIDING ENGINEERING DESIGN SERVICES FOR THE DEVELOPMENT OF AN ENGINEERING DESIGN AND REQUEST FOR PROPOSAL TECHNICAL SPECIFICATION PACKAGE FOR THE RENOVATION OF THE EXISTING FIREBIRD SUBSTATION. THE RENOVATION WORK AT FIREBIRD SUBSTATION WILL ACCOMMODATE THE COMPLETE STRIP DOWN OF THE EXISTING SUBSTATION STRUCTURE, REMOVAL OF THE EXISTING 12KV OCBS, AND ALL EXISTING METERING, AC AND DC SYSTEMS. THE EXISTING STRUCTURE WILL BE RETROFITTED WITH NEW 69KV JUMPERS, FUSES AND ARRESTERS ALONG WITH A NEW 12KV MAIN / TRANSFER BUS, DISCONNECT SWITCHES, RECLOSERS, ARRESTERS, PTS, GANG OPERATED TRANSFER SWITCHES, AND STATION SERVICE. THE GROUNDING STUDY WILL BE PERFORMED TO INSTALL A NEW GROUND GRID AND A NEW CONDUIT SYSTEM INSTALLED TO ACCOMMODATE ALL NEW POWER AND CONTROL CABLES. THE EXISTING CONTROL HOUSE WILL BE MODIFIED TO ACCOMMODATE THE NEW 12KV FEEDER RELAYS (SEL351R) AND AC PANELS WITH PROVISIONS DEVELOPED FOR FUTURE COMMUNICATIONS AND DC SYSTEMS. ITEMS NOT REPLACED DURING RENOVATION WILL BE THE EXISTING SUBSTATION STRUCTURE, 69/12KV TRANSFORMER, FENCING, CONTROL HOUSE AND 69/12KV LINE DROPS. - $31,878 - Wednesday the 11th of April 2012
Bureau Of Indian Affairs
WESTERN REGIONAL OFFICE
PROJECT: DEVELOPMENT OF SUBSTATION MAINTENANCE PROGRAM FOR ALL ELECTRICAL SUBSTATIONS, SCIP SERVICE AREA, AZ. SERVICES ARE FOR ELECTRICAL/CIVIL ENGINEERS, DESIGNERS, AND CAD OPERATORS PROVIDING ENGINEERING SUPPORT TO SCIP TO PROVIDE FOR THE NECESSARY RESEARCH AND DEVELOPMENT OF TECHNICAL SPECIFICATIONS THAT WILL ESTABLISH A NEW MAINTENANCE AND TESTING PROGRAM FOR THE SCIP ELECTRICAL SYSTEM WITH EMPHASIS ON SUBSTATION EQUIPMENT AND PROTECTION SYSTEMS. - $26,203 - Wednesday the 11th of April 2012
Bureau Of Indian Affairs
WESTERN REGIONAL OFFICE
ENGINEERING SUPPORT TO SCIP TO PROVIDE FOR THE NECESSARY RESEARCH AND DEVELOPMNENT OF THE TECHNICAL SPECIFICATIONS TO REPLACE THE EXISTING 69KV INSULATORS ON THE SOUTHEAST LINE SECTION OF THE DUAL CIRCUIT 69KV LINE FROM DRIPPING SPRINGS SUBSTATION TO COOLIDGE DAM SWITCHYARD.
© Copyright 2019
The Collier Report published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources.
No reliance should be made by readers or Collier Report subscribers.
Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances.
Requests for the modification of displayed information may be made to help.desk@1918.media.